Loading...
ST0501-CN121116 40. Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com EXHIBIT "B" November 16,2012 Mr. George Marshall,P.E. City of Coppell Engineering Department 255 Parkway Blvd. P.O. Box 9478 Coppell,Texas 75019 Via: gmarshall @coppelltx.gov RE: Deforest Road Reconstruction Completion Testing MacArthur Boulevard to Windsor Estates • Coppell,Texas Dear Mr. Marshall: In accordance with the November 7,2012 request of Mr.Larry Davis,we are pleased to submit the following estimate of materials testing and observation services necessary for completion of the above referenced project. The estimate is based on a construction schedule provided by Mr.Walter Mitchell of Tiseo Paving and typical past testing frequencies. Including our October 22,2012 invoice,thus far we have billed$39,665.85. Our original contract estimate was for$39,996.00..We estimate the fees for project completion beyond our October 22, 2012 invoice will be as follows: SIDEWALK/DRIVEWAY/INTEGRAL WALL/C411 WALL/MEDIAN NOSE CONCRETE AND BACKFILL TESTING Field Observation of Rebar, In-Place Density and Concrete Testing 90 Hrs. @$46.00 per hour $4,140.00 City of Coppell November 16,2012 Compressive Strength Concrete Cylinders(with observation) 142 tests @$26.00 per test $3,692.00 In-Place Moisture Density Tests (minimum 3 tests per trip) 15 tests @$43.00 per test $645.00 Trip Charges 28 trips @$42.00 per trip(4 hours or less) $1,176.00 6 trips @ $50.00 per trip(Over 4 hours) $300.00 Estimated Total of Remaining Testing $9,953.00 Cumulative Total of Testing Through October 22,2012 $39,665.85 Original Contract Estimated Total for Testing $39,996.00 New Estimated Total Testing for Project Completion $49,618.85 NEW ESTIMATED TOTAL OF ALL TESTING SERVICES $49,618.85 Based on testing provided since October 22,2012,anticipated remaining schedule information from Tiseo Paving and Mr. Larry Davis our total estimated fee to perform the aforementioned tests and services is detailed above. It should be noted that this proposal is based on the estimated number of tests and quantities mentioned in this proposal and not a lump sum price. The construction sequence or job conditions may require more or fewer testing or observation. Only work which is actually performed will be charged for and all charges will be in accordance with the corresponding unit fees quoted in this proposal or our Schedule of Fees. If these additional services are acceptable please sign the enclosed copy and return it to us at your earliest convenience. We trust the information provided herein is sufficient for your use. Should you have any comments and/or questions,please do not hesitate to contact us. We are looking forward to working with you. Texas CMT,Inc. Page 2 City of Coppell November 16,2012 Sincerely, Texas CMT,Inc. /7)7- f47/76/(16 -- •o tar Rahman,M.S.C.E., P.E. Richard W. Gee,P.E. Project Manager President MR:RWG/de Enclosure Accepted by: f Date: 12_,' / l-- Texas CMT,Inc. Page 3