Loading...
Big Cedar-CS 910904 (2)GOODWIN! ARSHALL CIVIL ENGINEERS ~ PLANNERS ~ SURVEYORS September 4, 1991 Ms. Taryon Bowman Planning and Zoning Coordinator City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Preliminary Plat, Preliminary Engineering Plans and PD Zoning Site Plan for the Proposed Big Cedar Addition to the City of Coppell Dear Shohre: Enclosed please find two (2) copies of the above referenced plat, plans and zoning site plan for the proposed Big Cedar Addition to the City of Coppell. Please note that the items have been revised per Development Review Committee comments. The following are specific items that I feel require addressing in regards to the DRC comments: 1) 2) 3) 4) 5) P~LIMINARYP~T We are still showing the right of way of Harris Road (Bethel School Road) as fifty (50) feet. This requires an additional 7.5 foot dedication from the subject property. As you are aware, Mr. Tim House of Matthews Southwest Investments has been negotiating with the landowner across Harris Road as well as the City of Coppell as to the issues inherent to the improve- ments of Harris Road. Engineering documentation is being prepared by others to address this issue. It is my understanding that this documentation will be presented to the City within the next few days. The ten (10) inch sewer line that traverses the property is not contained within any dedicated public easement. For this reason, no easement is currently shown as existing on the Preliminary Plat. The twenty (20) foot private access easement across Lot 1 has been previously agreed to with the McDowell family. We are formally requesting a variance from the City requirement for alleys on this project. This has been duly noted on the Preliminary Plat as well as the PD Zoning Site Plan. We are currently in the process of determining our desire to access the park. This issue will be addressed prior to filing a Final Plat. If we do decide to access the park, we will plat a suitable easement between lots adjacent to the proposed park dedication. 6001 BRIDGE STREET, SUITE 100 / FORT WORTH, TEXAS 76112 / 817-429-4373 (METRO) Big Cedar Addition September 4, 1991 Page 2 of 3 1) 3) 4) 5) 6) 1) 2) 3) 4) PRELIMINARY DRAINAGE LAYOUT We intend to design proper erosion control devices at the outlet of the proposed storm drain pipe to serve the property. This issue will be handled during the final design phase of the project. As you are aware, we have proposed a reclamation project for this region. The City has accepted the project and forwarded a flood study to FEMA for review. The DRC comment requesting information on the proposed plan of improvements for the creek area in relation to the Albert Halff study must have been made by someone outside the loop on this issue. ff any questions remain, please call. The flood study discussed in (2) above clearly shows that minimal impact of the reclamation project is experienced at the proposed park location. Area A5 as shown on the preliminary drainage layout is expected to be picked up in the future Harris Road storm drain system. If there is a timing problem for the two projects, we will accommodate the runoff through the concrete flume as shown. We are proposing that the drainage easements be fifteen (15) feet in width. A twenty foot easement would actually encompass more area than the side setbacks for the lots. We feel that the fifteen foot width provides adequate access to the storm drain system. We have included a watershed area map of the drainage basin clearly indicating the project location. PRELIMINARY WATER AND SEWER LAYOUT We agree to show a 15 inch sewer line through the project as called for under the recently completed sewer master plan. However, we feel that the over sizing of this line should be cost shared by the City. Please advise as to how you wish us to proceed with this request. The proposed sanitary sewer between lot 8 and lot 9 will be offset within the easement so that the manhole can be access~ from one lot, i.e. no fence will cover the manhole lid. The actual configuration of the connection to the existing sewer near the south property line of lot 8 and lot 9 will be designed for the best possible connection angle. The complicating factor in this situation is that an existing aerial crossing is in this location. During the design process we will work with the City to establish the best possible situation given the eaisting configuration in this location. For the purposes of this preliminary submittal, we have not changed the configuration as originally submitted. I have not included the fire hydrant at the intersection of Harris Road and proposed Brock Street (Street "A"). All lots within this region are well within 500 feet of an existing or proposed fire hydrant. Big Cedar Addition September 4, 1991 Page 3 of $ 5) Rather than add the fire hydrant at the end of Lcigh Street (Street "C"), we have moved the proposed hydrant near the intersection of Leigh Street and Brock Street to a location that places aH lots within 500 feet of the hydrant. Please contact me if either item (4) or (5) as indicated are a came of problem to you. These issues can be worked out during the design of final engineering plans for the project. As a courtesy Mr. Tim Home is contact the McDowell family regarding the change in street name to Harris Road. We feel that the City should also provide official notification of the name change as well I feel that this letter, together with the changes made on the revised preliminary plat and plans attached, address the concerns expressed by City Staff on this project. Please feel free to call me if there are any additional comments. As always, I appreciate your assistance in this matter. DMG/jc Ms. Shohre Daneshmand, P.E. Mr. Tim Home Mr. Fred Joyce Ms. Mary Myers N // m Imm m~mm ImdmmL Im~ Gooow~! MARSHALL N IPBELIMINA~I PLAT IlG Cl~S~ SDDmON almmr ~mm