Loading...
Blackberry Farm-CS121025 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-259-SF-7/9, Blackberry Farm, a zoning change request from SF-12 (Single Family-12) to PD-259-SF-7/9 (Planned Development-259-Single Family-7 & 9), to permit the development of 82 single-family lots and five (5) common area lots on 54.8 acres of land located on the north side of Sandy Lake Road, approximately 750 feet northeast of Starleaf Street (extended), at the request of David Hayes, Holmes Builders. STAFF REP.: Gary Sieb PROJECT ID# PD-12-0055 DRC DATE: October 25, 2012 and November 1, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. The utility plan needs to be legible. 3. The alley will need to be 15 feet of pavement. 4. Why are park fees being reduced to $600? 5. Permanent erosion protection/bank stabilization on the creek will be reviewed in detail. 6. The flood study will have to go through the CDC process. 7. The current effective floodplain needs to be shown. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Blackberry Farm, Preliminary Plat, a preliminary plat to subdivide 54.8 acres of property to permit the development of 82 single-family lots and five (5) common area lots, located on the north side of Sandy Lake Road, approximately 750 feet northeast of Starleaf Street (extended), at the request of David Hayes, Holmes Builders. STAFF REP.: Gary Sieb PROJECT ID# PP-12-0056 DRC DATE: October 25, 2012 and November 1, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. The floodplain note regarding responsibility of home owner maintenance needs to be included. 3. The current effective floodplain needs to be shown. 4. Easements should be a minimum of 20 feet in width.