Loading...
GTE 1R1A-CS121025DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD- 171R4 -11C, GTE Shared Services Addition (Wisenbaker), a zoning change request from PD- 171R3 -HC (Planned Development -171- Revision 3- Highway Commercial) to PD- 171R4 -HC (Planned Development -171 Revision 4- Highway Commercial), to attach a Detail Site Plan for a 67,000- square -foot office /showroom/warehouse building on 6.6 acres of property located at the northeast corner of Canyon Drive and S.H. 121, at the request of DFW Canyon Partners, LTD, being represented by John Taylor, Azimuth Architecture. STAFF REP.: Matt Steer PROJECT ID# PD -12 -0057 MC DATE: October 25, 2012 and November], 2012 CONTACT: Michael COMMENT STATUS: P.E., Civil Engineer, 972 - 304 -7019 !"PRELIMINARY F4,VAL 1. There will be additional comments during detailed engineering plan review. 2. Are you being required to install the decel lane at this time? 3. You may need to widen the eastern driveway to eliminate the S- Curve. 4. Label the distance between the eastern drive and the adjacent driveway. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: GTE Shared Services Addition, Lots 1R1A -R, Block 1, Replat, being a replat of Lot 1R1A of the GTE Shared Services Addition, to establish a fire lane and utility easements to support the development of 67,000- square -foot office /showroom/warehouse building on Lot 1R1A -R on 6.6 acres of property located at the northeast corner of Canyon Drive and S.H. 121, at the request of DFW Canyon Partners, LTD, being represented by John Taylor, Azimuth Architecture. STAFF REP.: Matt Steer PROJECT ID# RP -12 -0058 DRC DATE: October 25, 2012 and November], 2012 CONTACT: Michael COMMENT STATUS: P.E., Civil Engineer, 972 - 304 -7019 !"PRELIMINARY F4,VAL 1. There will be additional comments during detailed engineering plan review. 2. Provide a 10' U.E. along the SH 121 property line. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD- 171R4 -HC, GTE Shared Services Addition (Wisenbaker), a zoning change request from PD- 171R3 -HC (Planned Development- 171 - Revision 3- Highway Commercial) to PD- 171R4 -HC (Planned Development -171 Revision 4- Highway Commercial), to attach a Detail Site Plan for a 67,000- square -foot office /showroom/warehouse building on 6.6 acres of property located at the northeast corner of Canyon Drive and S.H. 121, at the request of DFW Canyon Partners, LTD, being represented by John Taylor, Azimuth Architecture. STAFF REP.: Matt Steer PROJECT ID# PD -12 -0057 DRC DATE: October 25, 2012 and November], 2012 [CONTAICT: Michael Garza, P.E., Civil Engineer, 972 - 304 -7019 COMMENT STATUS: PRELIMINARY ✓FINAL .1T.'TT.'D Dp7 1. There will be additional comments during detailed engineering plan review.