WA9401-CS 950310 (2) UTILI ARCHITECTURAL GENERAL CONTRACTORS 300 WEST RAMSEY P,O. BOX 11586 FORT WORTH, TX 76110 817-926-4377 429-81 91 METRO 81 7-926-4387 FAX March 10, 1995 MT. Ken Griffin City of Coppell P. O. Box 478 Coppell, TX 75019 Re: East Beltline Road Dear Mr. Griffin: There is some disagreement regarding the final payquantity for Pay Item #5, "Bore and Install Pipe beneath Beltline Road"._ The quantity. shown in .the proposal is 235.6 LF. The actual measured quantity in the field is-262 LF, an overrun of 26.4 LF, or 11~2%~ This 'translates to a cost overrun of $3,212.09, on this pay item. There are two reasons for the overrun. Initially, 11 feet was added to move the beginning and ending bore points a minimum of ten feet from back of curb. Secondly, the estimated length established in the proposal is short by approximately. 15 LF, as measured between the original bore limits. I have enclosed revised Estimate No. 3, which-invoices the City for 26'2 LF instead of 251 LF. I feel that this pay quantity if fair and I fail to understand' the reluctance of the City to. pay it since this is a unit price contract. If-the City decides not to pay the' invoiced amount, please give us written notice so that we.can properly appeal. Please call me if you have any qu6stions. Sincerely, Houston CL~. Cavin Project Manager HLC/jlr:lc\94061 APPLICATION AND CERTIFICATEFOR PAYMENT A~A DOCUM[:NT G702 (Instruc'nons on reverse sidel ,'^c;E ONE OF P^C~S TO City of Coppell I'ROJECT: ~St ~ltline R~d APPLICATIC)N NO: 3 Revis~islribulio~lo: P. O. ~x 478 Wat~ ~ne ~oje~ ~ OWNER · 11, ~ 75019 (~ 94-01 )94061 PERIOD TO: 2/28/95 ~ARCHITECT FROM {CONT~ OR): ~CHI~~ ~ILITI~, ~C. ' ~ CONT~CTO~ P. O. ~x 11586 ARCHITECt'5 ~, ~ 76110 AUI Job CONTRACT FOR: · CONTRACT DATE: Applicalion is made For Paynlenl as shown be~neclion CONTRACTOR'S AP CATION FOR PAYMENT CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM . . $ 133,976.54 previdus months by Owner 3. CONTRACT SUM TO DATE (I ine 1 --2) $ 133,976.54 TO'IAL 4. TOTAL COMPLETED & STO"~D TO"~A~:::::::::::: $ 132,902,63 Approved this Monlh. "' (Column G on G703) N b a. ~ % o[ Completed Work $ 13,290.26 um r a e ~rove~ 5. RETAINAGE: (Column D + E on G703) I'O'IALS Nel change by Change Orders Tile undersigned Conlraclor certifiLs Ihal Io Ille besl of Ihc: Ccmlrach~r's knowledge, information and belief Ihe Work covered by Illis Applicalion for t'ayn|enl has been completed in accordance wilh Ihe Conlracl Documenls, Ihal all amounls havL been paid by the Conlraclor for Work Lot which I~revious CLrlificales fur Payroe,hi w~.,re issued and paymcnls received frown Ihe Owner, and Ihal cmrenl i~aymenl shown )berein is now due. CONTRACTOR: By: ~ ~~ Da~e: 3/10/95 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance wilh Ihe Conlracl Documenls, based on o. Fsile observalions ancl Ihe data comprising the above application, the Archilecl certifies l, tile Owner thai Io Ihc besl of the Architect's knowleclge, information and belief Ihe Work has I~rogrc:ssed as indicated, Ihe qualily c}f Ihe Work is in accordance wilh Ihe Conlrac'l Documenls, and Ihe Contraclor is enlified Io paymenl o[ the AMOUNT CER'! IFIED. b. ___ % of Stored Material $ ~'~-,-~ (Column F on G703) :~'~lal R{:taina~e (I. ine 5a + 5b or ~'~lal in Colunln I of G703) ..................... $ 13,290.26 6. TOTA[~NED LESS RETAInAGE ................... $ .. ]19,612.37 (I.ine 4~: Line 5 Tolal) 7. LESS PREVIO~TIFICATES FOR PAYMENT (Line ~ prior Cerli[icale) ......... $ 83~401.99 8. CURRENT PAYMENT D:~ ..................... $ 36~210.38 (I.ine: 6 s~a~ec, r: ~ ~ /:'~:"'. Cod, of: T~~ Notary Public' ~e ':[t~ - , e ~Ye~ ~ , y C nmniss~n expir~5~O .... : - ~, 5 By: Date: This Certificate is nol ne~oliable. The' AMOUNT CERTIFIED is payable only to Ihe Cant racIor named herein. Issuance, paymenl and acceplance o~ paymenl are wilhoul prejudice to any riKhls o[ the Owner or Conlraclor under Ibis Conlracl. AIA DOCUMENI G702 · AI'I'I ICAIIC)N AND CLRI lHCA'IF tar I'^Y~IFNI'. MAY 'lgll.I I I]I II(.)N · AIA' · ~:. 1911] THE AMLRICAN INS111UII. OF ARCIIIII. C1S, 1735 NEW YORk AVENU[, N.W.. WASl IIN(;I(:IN. I).C. 2IX HIh G702-1983 MONTHLY ESTIMATE OWNER CONTRACTOR CITY OF COPPELL ARCHITECwEtrRAL UTILITIES, INC. P. O. BOX 478 P. 0. BOX 11586 COPPELL, ~X 75019 FORT WORTH, TX 76110 AUI JOB leO. 94061 PROJECT= EAST BELTLINEROADWATERMAIN ORIGINAL CONTRACT COST: $133,976.54 PERIODICAL ESTIMATE NO. 3 REVISED PERIOD 2/01/94 TO 2/28/95 Quantity Quantity Quantity Quantity value of value of original complete Complete Complete work Comp te Work Complete Item Description Estimate UM Unit Price Prev.N~. This Month To Date This Mo To Da~e I: 8a DR-14 WATER : 2507: LF: $24.17: 2307: 200: 2507 $4,834.00: $60,594.19 2: 12" CL 150 WATER : 1178: IF: $28.55: 1178: 0 ~ I 8 = $0.00 ~ $33,631.90 3 ~ 8" GATE VALVE : 7: EA: $448.00: 3: 4: 7: $1,792.00: $3,136.00 4: RECOXNBCT 2" SERVICE: i: EA: $451.00: 0: 0 0: $0.00: $0.00 5: BORB FOR 8" PIPE : 238: IF: $121.67: 0: 52: 262: $31,877.54: $31,877.54 6: AIR RE~EASE VALVE : 2: EA: $832.00: I: 0: i: 50.00: 5832.00 7: 2" BLOW OFF : I: EA: $1,118.00 = : 0: I: $0.00 ~ $1,118.00 8: 4' FIRg HYDRANT : I: ~A: $1,416.00 ~ 0: Z: I: $1,416.00 s $1,416.00 9: 2" TEMP. W&_q'lgR : 500: IF: $6.60: 45: 0: 45: $0.00: $297.00 $3g,919.54 $132,902.63 RMED ON ORIGINAL CONTRACT $132,902.63 EXTRA WORKPERrORMED $0.00 TOTAL VALUE OF WORKTO DATE $132,902.63 LESS RETAINAGE - 10% 513,290.26 NET AMOUNT EARNED OE CONTRACT $119,612.37 , · AMOUNT DUE THIS ESTIMATE $36,210.38