Loading...
ST9904-CS 971201 (3)SH I 14 MIS News A newsletter of the SH 114 and SH 121 Corridor Major In~stment Study. he SH 114 Major Investment Study is focused on transportation improvements in the SH 114 corridor located north of DFW Airpod. The study process involves everyone impacted by transportation in and surrounding the study area. Included are city governments, county agencies, council of governments, state agencies, federal agencies, toll road authorities, mass transit agencies, airpod officials, and the general public, The entities are collaborating to develop a locally preferred transportation improvement plan The plan may integrate as many transportation modes and transportation strategies as necessary to produce the desired improvements, to cure existing and expected transportation problems in the corridor. This may include incorporating high occupancy vehicle lanes, flex time work hours, hike and bike trails, and/or toll express lanes. WHAT'S NEW } The Path to Excellence [he Texas Department of Transpodation is dedicated to provide transportation solutions in a timely manner. Unforeseen variables in project development sometimes interfere with project progression. The SH 114 Major Investment Study project schedule has been modified since the September issue of SH 114 MIS News. The project completion path was modified to reflect changes concerning the hiring of consulting engineers who will assist TxDOT and the technicat committee in analysis and development of transportation strategies. The impact is a five month delay, The new path is summarized as follows: Stage I (September '97 to September '98): Definedesign criteria. Develop basic alternatives. Hold public meeting. Stage 2 (September '98 to January '99): Develop transportation strategies for the corridor Stage 3 (February '99 to October '99): Produce conceptual studies of promising strategies. Develop consensus on a locally preferred alternative. Stage 4 (October '99 to April 2000): Produce detailed study of locally preferred alternative. Stage $ (May 2000 to November 2000): Acquire regional approval for the locally preferred alternative, Stage 6 (December 2000 to February 2001): Complete FENFONSI and acquire regulatory agency approvals. Begin detailed design. Please review the project timeline graphic on page 2, It contains details concerning each specific MIS activity Let Us Hear from You! ontact us by telephone, mail, or e- mail. Telephone your concerns about the SH 114 corridor directly to Mr. Joe Atwesd, PE at (817) 370-6614. Mail your concerns to: SH 114/SH 121 MIS c/o Texas Department of Trans. PO Box 6868 Fort Worth, TX 76115-0868 attn.: Joe Atwood, PE or e-mail to: Consulting Engineers Express Interest in MIS ]xDOT has sought out the assistance of a consulting engineering firm. Advertisements requesting a letter of interest from the consultants were published in the Texas Register and on the state's world wide web site. The advertisement ran from November 21 'till December 10, TxDOT received Jetters from seven consultant firms. The selection process is in progress, and the consultant is expected to be on board and functioning by March 1998.