SS9901-BD040902 Deforest Rd. and Sandy Lake Rd. Wastewater Lift Station
Bid Q-0804-01
Bid Tabulation
September 2, 2004- 10:00 a.m.
Cajun Constructors, Canfer Construction Red River
Inc. Company Construction Co.
Base Bid $3,056,000.00 $2,586,625.00 $2,606,655.00
Calendar Days 450 300 365
BID TABULATION: Deforest Rd. and Sandy Lake Rd. Wastewater Lift Station Project SS 99-01
Bid Q-0804-01
BASE BID
Item Quantity Unit
Description Canfer Construction Red River Construction Cajun Constructors
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1 LS Demolition of existing Deforest Lift Station 100,000 100,000 56,000 56,000 50,000 50,000
2 1 LS New Deforest Lift Station w/all appurtenances 1,643,000 1,643,000 1,449,900 1,449,900 1,939,170 1,939,170
3 1 LS New Deforest Lift Station SCADA System 35,000 35,000 35,000 35,000 35,000 35,000
4 1 LS Deforest Lift Station Yard Piping w/all Fittings&App. 75,000 75,000 180,000 180,000 300,00 300,000
5 1 LS Deforest Lift Station Trench Safety 400,000 400,000 2,.000 2,000 100,000 100,000
6 1 LS Deforest Lift Station Storm Water Controls 5,000 5,000 2,000 2,000 2,000 2,000.
7 1 LS Demolition of existing Sandy Lk Lift Station 25,000 25,000 34,000 34,000 20,000 20,000 •
8 1 LS New Sandy Lk Lift Station w/all appurtenances 200,000 200,000 550,000 550,000 450,000 450,000
9 1 LS New Sandy Lk Lift Station SCADA System 25,000 25,000 23,000 23,000 25,000 25,000
10 1 LS Sandy Lk Lift Station Yard Piping w/all Fittings&App. 50,000 50,000 200,000 200,000 100,000 100,000
11 1 LS Sandy Lk Lift Station Trench Safety 5,000 5,000 2,000 2,000 5,000 5,000
12 1 LS Sandy Lk Lift Station Storm Water Controls 2,000 2,000 2,100 2,100 2,000 2,000
13 1 EA Line A Force Main Connection 5,000 5,000 15,000 15,000 5,000 5,000
14 1 EA Line B Force Main Connection 5,000 5,000 29,000 29,000 5,000 5,000
15 60 LF 20"Ductile Iron Pipe 50 3,000 126 7,560 78 4,680
16 60 LF 30"Ductile Iron Pipe 90 5,400 164 9,840 138 8,280
17 25 LF 18"RCP Storm Sewer 30 750 84 2,100 40 1,000
18 15 LF 16"Ductile Iron Pipe 40 600 127 1,905 60 900
19 15 LF 30"SDR 26 PVC 80 1,200 211 3,165 138 2,070
20 15 LF 24"SDR 26 PVC 45 675 139 2,085 60 900
Calendar Days 300 365 450
TOTALS $2,586,625 $2,606,655 $3,056,000