Loading...
ST9904-AG040914T H E- G � T V � o F AGENDA REQUEST FUAM EP" 'ngineering /Public Works CO COPPELL DATE: September 14, 2004 r � - o x d a 4 ITEM #: 23 ITEM CAPTION: Discussion and consideration of Memorandum of Understanding concerning S.H. 121 Funding Strategy; and authorizing the City Manager to sign. APPROVED BY CITY COUNCIL ON ABOVE DATE \1I EXECUTIVE SUMMARY: Motion to Approve subject to ascertaining if accrued interest can be added under the second bullet point. M - Tunnell S - Raines Vote - 6 -0 Suhy absent • Approval of this Memorandum of Understanding will clarify TxDOT's position in regard to the funding of S.H. 121 and other roadways in the vicinity. Staff will be available to answer any questions at the Council meeting. a) 3)e-. FINANCIAL COMMENTS: Agenda Request Form - Revised 02/04 Document Name: #SH 121 -] AR MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Kenneth M. Griffin, P.E., Director of Engineering/Public Works Date: September 14, 2004 RE: Discussion and consideration of Memorandum of Understanding concerning S.H. 121 Funding Strategy; and authorizing the City Manager to sign. On September 7, 2004, the City of Coppell received the draft copy of the long awaited Memorandum of Understanding, S.H. 121 Funding Strategy. The S.H. 121 Funding Strategy was brought about by TxDOT's position that all new and proposed state highways undergo scrutiny to determine whether or not they would be better served as toll roads, whether than freeways. The analysis of S.H. 121, from northwest Coppell to the Dallas North Tollway, reveals that it was a prime candidate to be a tollway, as opposed to being a freeway. Council may recall that several years ago five cities joined with Denton County to pledge funding for S.H. 121 to expedite its construction. That pledged funding was used as leverage to obtain a loan from the State Infrastructure Bank (SIB) to expedite construction. Because of the analysis concerning the conversion of S.H. 121 from a freeway to a tollway, the affected parties have been meeting with TxDOT and representatives of the North Central Texas Council of Governments ( NCTCOG) concerning support of the conversion of S.H. 121 to a tollway. The Memorandum of Understanding lists all cities and counties affected by S.H. 121 and also list concessions that will be made to gain those adjoining communities' support for the conversion of S.H. 121 from a freeway to a tollway. Specifically in the City of Coppell, the Memorandum of Understanding states that NCTCOG would agree to: 1) Fund $3.64 million toward construction of Freeport Parkway from S.H. 121 to Sandy Lake Rd. This is a new roadway through property that is currently undeveloped. 2) Fund $3.368 million toward the widening of Freeport Parkway from Sandy Lake Rd. to Ruby Rd. This is the widening of State Road from Sandy Lake Rd. to Wagon Wheel Park from its current 2 -lane asphalt to a 4 -lane divided boulevard. 3) Work with TxDOT to expedite construction of the "Funnel" project on S.H. 121 /S.H. 114. This project impacts traffic flow along the western boundary of Coppell Road and has long been a high priority of Coppell and Grapevine. 4) Work with TxDOT to ensure placement of a northbound exit ramp from S.H. 121 to serve Sandy Lake Road. The main concern here is having an exit ramp in the general proximity of Sandy Lake Road, not 9000 feet and several intersections south of Sandy Lake Road. A "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" byproduct of any ramp to serve Sandy Lake Road would be to protect the integrity of the proposed diamond interchange at Freeport Parkway. One of the goals of getting the funding for the construction of Freeport Parkway is to help siphon some of the traffic that currently uses Denton Tap Rd. and MacArthur Blvd. in the mornings off of those roadways and placing them on Freeport Pkwy. so that they can go directly along the western fringes of Coppell to reach I.H. 635 and/or S.H. 114. The construction of Freeport Parkway was identified as a potential project in the RTTF committee. With the money pledged by NCTCOG and the estimated construction of Freeport Pkwy., Coppell will need to come up with a 20% match. Depending on the cost of construction and the right -of- way associated with Freeport Pkwy., the 20% match could be in the range of $1.7 million. Currently staf has paid $1.2 million as part of our funding share towards expediting construction of S.H. 121. That $1.2 million would be used as a portion of our local match toward the construction of both sections of Freeport Parkway. Based on all meetings and discussions concerning S.H. 121 being converted from a freeway to a tollway, it is my understanding that TxDOT has the right to make that determination without the support of the adjoining cities. I specifically asked whether or not TxDOT could mandate S.H. 121 be a tollway, as opposed to being a freeway at the Surface Transportation Committee meeting at NCTCOG. The answer to my question was that they do have that right; however, they have never exercised that right i.e., constructed roadways, widened roadways, converted roadways, etc. without the support of the adjoining cities. The bottom line is TxDOT has the right to convert S.H. 121 to a tollway. Our goal in supporting the Memorandum of Understanding is to be assured that the City of Coppell receives consideration for our support of S.H. 121 being converted from a freeway to a tollway. Staff recommends approval of Memorandum of Understanding concerning S.H. 121 Funding Strategy. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" MEMORANDUM OF UNDERSTANDING S.H. 121 Funding Strategy This memorandum of understanding (MOU) is a staff planning document that is intended to outline the agreement regarding the S.H. 121 tollway funding strategy. On March 25, 2004, the Texas Transportation Commission approved Minute Order 109615, which allows the Texas Department of Transportation (TxDOT) to issue bonds and other public securities to fund state highway system improvements. Subsequently, TxDOT and the North Central Texas Council of Governments ( NCTCOG) recommended the construction of S.H. 121 to as an electronic toll facility from the southern end of the S1.94 121 Bypass at Denton Creek to the Dallas North Tollway (DNT). Denton County, The Colony, Lewisville, rrollton, Coppell, Frisco, Plano, and Grapevine concur with the TxDOT and NCTCOG recommendation. The impacted arties agree to the following terms: I.H. 35 E: from Pr dent George Bush Turnpike (PGBT) to the Lake Lewisville Bridge • Denton Cou y will contribute $57 Million from TRIP -04, the Transportation Road Improvement Program - 2004. • TxDOT agrees o fund the remaining cost of Design, Right -of -Way (ROW) and Construction. • TxDOT agrees t make every effort possible to open I.H. 35E to traffic within 7 years of agreement on S.H. 121. F.M. 720: from .2 Miles W t of Garza Lane to .1 mile west of F.M. 423 • Denton County agre to use $6 million in TRIP -04 funds to provide the Environmental Assessment (EA), Schematic, PS &E, an 10% of ROW costs, with remaining funds committed to the cost of construction. • TxDOT/NCTCOG agre to fund 90% of ROW and the remaining cost to construct F.M. 720. • TxDOT/NCTCOG agree o make every effort possible to open F.M. 720 to traffic by 2008. F.M. 423: from S.H. 121 to U.S. 380 • Denton County will provide \the, chematic, and PS &E for F.M. 423 from Stewarts Creek Road to U.S. 380. • Denton County agrees to fun ROW for F.M. 423 from Stewarts Creek Road to U.S. 380 from $3.5 million in TRIP -04 funds witfining funds committed to the cost of construction. • Dento n County agrees to funOW for F.M. 423 from SH 121 to Stewarts Creek Road. • TxDOT/NCTCOG agree to fo OW for F.M. 423 from SH 121 to U.S. 380. • TxDOT/NCTCOG agree to fnin cost of construction for F.M. 423 from Stewarts Creek to U.S. 380. • TxDOT/NCTCOG agree to f of co struction for F.M. 423 from S.H. 121 to Stewarts Creek. • TxDOT/NCTCOG agree to my effort ssible to open F.M. 423 to traffic within 6 years of agreement on S.H. 121. De- federalization of Projects Denton County agrees to reprioritize $18.25 million of its particip tia� {i in the following projects in the following amounts: • I.H. 35E Precinct 2 funds totaling $2 million • F.M. 423 Precinct 2 funds totaling $10.5 million • F.M. 544 Precinct 2 funds totaling $5.75 million TxDOT/NCTCOG agree to fund the $18.25 million reprioritized by Denton County as outlined above, if Denton County will fund the following local projects: • Memorial Drive (three sections) from Blair Oaks to Navaho (0/2 to 4 lanes) totaling $4.75 million • South Colony Blvd from Memorial Drive to S.H. 121 (0 to 4 lanes) totaling $2.25 million • Paige Road from South Colony to North Colony (4 to 6 lanes) totaling $4.25 million • F.M. 423 10% ROW totaling $4 million • The Colony's share of utility costs along F.M. 423 totaling $3 million Page 1 of 3 COLLIN COUNTY TxDOT agrees to refund Collin County's State Infrastructure Bank loan expenditures. CITY OF THE COLONY Denton County agrees to fund the following projects as listed in the De- federalization section: • Memorial Drive (three sections) from Blair Oaks to Navaho (0/2 to 4 lanes) totaling $4.75 million • South Colony Blvd from Memorial Drive to S.H. 121 (0 to 4 lanes) totaling $2.25 million • Paige Road from South Colony to North Colony (4 to 6 lanes) totaling $4.25 million • F.M. 423 10% ROW totaling $4 million • The Colony's share of utility costs along F.M. 423 totaling $3 million • TxDOT agrees to rend the City of The Colony's State Infrastructure Bank loan expenditures. CITY OF LEWISVILLE I.H. 35 E from PGBT to Lake L wisvi t funlle Bridge • TxDOT/NCTCOG agree d an additional $8 million to replace the City of Lewisville's $8 million bond fund contribution to the I. 35E project. Local Projects: • NCTCOG agree to fund $8 lion toward a local project, preliminarily identified as Corporate Drive, in the City of Lewisville. The City of Le isville agrees to fund the local match for this project. • TxDOT agrees to refund the Ci of Lewisville's State Infrastructure Bank loan expenditures. CITY OF CARROLLTON I.H. 35 E from PGBT to Lake Lewisville ridge • Denton County will contribute $57 illion from TRIP -04. • TxDOT agrees to fund the remaining ost of Design, Right -of -Way (ROW) and Construction. • TxDOT agrees to make every effort p ssible to open I.H. 35E to traffic within 7 years of agreement on S.H. 121. Beltline Road from Jackson Road to 1000 feet est of I.H. 35E • TxDOT/NCTCOG agree to fund $10 mil ion towards the reconstruction of Beltline Road to create a grade - separated facility that will pass under I.H. 5E and the existing rail lines in the area. • Carollton agrees to allocate its State Infras cture Bank loan funds to its local match for Beltline Road. • TxDOT/NCTCOG agree to fund the projec in 2005 and make every effort possible to complete the project by 2011 CITY OF COPPELL Freeport Parkway from S.H. 121 to Sandy Lake Road; ew roadway; 0 to 6 lanes • NCTCOG agrees to fund $3.64 million toward con ction of Freeport Parkway. • Coppell agrees to allocate its State Infrastructure Lo funds to its local match for Freeport Parkway. Freeport Parkway from Sandy Lake Road to Ruby Road; dition of lanes; 2 a 4 lanes • NCTCOG agrees to fund $3.368 million toward the wi ening of Freeport Parkway. • Coppell agrees to allocate its State Infrastructure Loan f nds to its local match for Freeport Parkway. The Funnel Project: • TxDOT/NCTCOG agree to expedite construction of the "Funnel" project on S.H. 121 /S.H. 114 from Business 114 to the Dallas County Line. TxDOT ensures placement of a northbound exit ramp on S.H. 121 to serve Sandy Lake Road, the ramp should: • Protect the diamond interchange planned at S.H. 121 and Freeport Parkway • Provide access to Grapevine Mills Shopping Mall Page 2 of 3 CITY OF GRAPEVINE The Funnel Project: • TXDOT agrees to fully fund and expedite construction of the "Funnel" project on S.H. 121 /S.H. 114 from Business 114 to the Dallas County Line. • TxDOT agrees to refund the City of Grapevine's State Infrastructure Bank loan expenditures. CITY OF PLANO U.S. 75 Ramp Improvements at Parker Road: • NCTCOG agrees to reallocate federal funds from two intersection improvement projects at Preston Road/Legacy Drive and Spring Creek Parkway /Coit Road, and from the Los Rios Boulevard widening project to construct ramp improvements at U.S. 75 and Parker Road. CITY OF FRISCO The City of Frisco benefits from the This agreement is contingent upon a well as final approval of the funding William Hale Texas Department of Transportation John Polster Denton County Dale Cheatham City of The Colony Jim Witt City of Coppell Tom Muehlenbeck City of Plano George Purefoy City of Frisco of F.M. 720 and F.M. 423. of the terms outlined herein by the policy body of each impacted party, as by the Texas Transportation Commission. Michael Morris North Central Texas Council of Governments Ruben Delgado Collin County eonard Martin .ty of Carrollton Claude ing City of L wisville Jerry Hodge City of Grapevin Page 3 of 3 Ken Griffin - SH 121 Memorank a of Understanding (MOU) From: Ken Griffin To: Christie Jestis Date: 9/15/2004 12:03 PM Subject: SH 121 Memorandum of Understanding (MOU) CC: Clay Phillips; Jim Witt Christie This email is a followup to the conversation this morning between Jim Witt, myself and you concerning the MOU. On September 14, 2004 City Council voted to approve the MOU with one clarification. The Council has requested that the section that refers to the previously paid money by the City for our share of the State Infrastructure Fund address the issue of accrued interest. The time frame from now to the utilization of the previously paid funds could be 3 - 4 years or longer. Thanks for your help on this request. Ken Griffin P. E. Director of Engineering /Public Works 972 - 304 -3686 kgritfin(a,,c.. i.coppcll.tx.s �se— -t�b ZL9 o bpi, From: Ken Griffin To: Paula Crocker Date: 9/8/2004 10:24:44 AM Subject: Fwd: S.H. 121 MOU >>> Christie Jestis < cjestis @nctcog.org> 9/7/2004 4:22:35 PM >>> S.H. 121 Toll Package Stakeholders: Attached is the draft Memorandum of Understanding (MOU) relating to the funding package that has been put together to construct S.H. 121 as a toll facility. This MOU outlines the terms of agreement discussed at multiple meetings. Please note that we are proposing that this MOU serve as a staff planning document, which will be supported by subsequent approval by your policy bodies (via resolutions) and by the Texas Transportation Commission's approval of the project list. Please review the document and provide comments back to me. We originally discussed having a MOU signed by the Regional Transportation Council (RTC) meeting this week, however, we have not been able to finalize the draft document until now. Therefore, if I receive comments from all parties in time, we can have it ready in time for the RTC meeting. As this scenario is unlikely, please send me your comments by next Tuesday, September 14, 2004. Once I receive and incorporate comments from all the impacted parties, we will circulate a paper copy to be signed by each of the entities on the MOU. Thanks, Christie <<SH 121 MOU Draft.doc>> Christie Jestis Senior Transportation Planner North Central Texas Council of Governments email: cjestis @nctcog.org (817) 608 -2338 direct line (817) 640 -3028 fax