WA9601-AG 980916 AGENDA REQUES'~;~ ORM CITY COUNCIL MEETING: September 8, 1998 8, 1998 ITEM # ITEM CAPTION: Consider approval of Change Order #3 for the Wagon Wheel Ranch Elevated Storage Tank Project #WA 96-01 in the amount of $47,600 to Landmark Structures, Inc.; and authorizing the Mayor to sign. APPROVED CITY r/ ~ DATE _C~Q~U~C~IL TITLR: Director o£ R~gineering/Public ~orks ~ee a~ached memo, BUDGET AMT. $ AMT. EST. $ +/- BUD:$ FINANCIAL COMMENTS: Funds for this change order have been allocated in the l~ater/Sewer tIP accounts. ~~ The total cost of this project including the change still remains under the or~ budget. DIR. INITIALS: \~ FIN. REVIEVV~.~ CITY MANAGER REVIEW: Agenda Request Form - Revised 3/98 Document Name: #eng2 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Ken Griffin, P.E., Director of Engineering and Public Works ~ RE: Consider approval of Change Order #3 for the Wagon Wheel Ranch Elevated Storage Tank Project #WA 96-01 in the amount of $47,600 to Landmark Structures, Inc.; and authorizing the Mayor to sign. Date: September 8, 1998 During the initial design of the elevated storage tank project, provisions were made to provide additional storage inside the base of the elevated tank to accommodate storage required by the Utility Division such as meter storage, surplus supplies for projects, etc. Drive-in doors were placed on both ends of the elevated tank to off-load materials from vehicles. Also, a metal grated floor about 40 % of the ground floor size was provided for additional storage. A one-half ton crane was provided to place items on the second level. During construction the contractor, Landmark Structures, Inc., has proposed to eliminate the partial grated second floor and one-half ton crane and replace it with a full concrete floor and one-ton crane. The crane is necessary to lift heavy objects to the second floor for out-of-way storage. There would be a hatched door proposed through the concrete floor to access the second floor. As the project was originally bid we had approximately 1000 square feet of storage on the grated second floor. With this change we will have approximately 3000 square feet of storage on the second floor, an increase of about 2000 square feet. As of this date, I am unsure of how the additional footage would be utilized, however, storage is at a premium within the City. Our current elevated storage tank on Southwestern Blvd. is being utilized for storage for various departments such as the Police Department's confiscated and found property, surplus furniture, auction items, etc. and is currently maxed out on storage capacity. Because this is a one time opportunity to create additional storage inside the elevated storage tank for future storage of supplies, meters, etc., staff recommends approval of Change Order #3 in the amount of $47,600 and will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" ~op'n.nlf'o~,,lsuoo\s.~ll~l\6t, l-96\lladdo3\:[ 006L-[9[ (17IZ) ouoqd 170~50-19S (I~IZ) xezI9IS!-gZZgL sexo& 'sel[nCI OZS# 'anuoAV seI~noCl Slt3~IIqlDM3 Dlil&q~SlqO3 'd'q'q 'V3q)INII3 ~' SIt03Vf 'H3lAIIHS ........................................ CITY OF COPPELL, TEXAS WAGON WHEEL RANCH ELEVATED STORAGE TANK Project No. WA-96-01 Bid No. Q0198-03 CHANGE ORDER NO. 3 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Landmark Structures, lnc., 1665 Harmon Road, Fort.Worth, Texas 76177, for construction of the Wagon Wheel Ranch Elevated Storage Tank, dated March 10, 1998. B. DESCRIPTION OF CHANGE This change order covers the extra work required to substitute a free span complete storage floor consisting of a concrete deck and wall mounted l-ton jib crane with electric hoist in place of the partial galvanized steel storage floor and supports and ½-ton capacity free standing jib crane and hoist. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Previous~ Quantity I Revised I Unit Amount No. Description Quantity This C.O. Quantity Unit Price of Change ] G .2 V:-ton Free Standing Jib Crane and Hoist I 0 0 L.S. ($9, 100) ($9, 100.00) ] G .3 Galvanized Steel Partial Storage Floor I 0 0 L.S. ($13,000) ($13,000.00) and Supports IG.2 l-ton Wall Mount Jib Crane and Electric 0 I I L.S. $2,000 $2,000.00 Hoist IG.3 Free Span Concrete Complete Storage 0 I I L.S. $67,700 $67,700.00 Floor Total: ~ $47,600.00 Original Contract Amount 2,256,717.00 Change Order No. I 230,635.70 Change Order No. 2 4,000.00 Change Order No. 3 47,600.00 Revised Contract Amount $2,538,952.70 wagon Wheel Ranch ElevatedStorage Tank (C.O #3) Page I of 2 (9/9/98) j :%clerical\coppell\96-149Xspecsxzo-3 .doe D. EFFECT OF CHANGE ON CONTRACT TIME It is hereby agreed that work associated with Change Order No. 3, will add no additional working days to this project. Original Contract Time 460 Calendar days Time, Change Order No. 1 0 Calendar days Time, Change Order No. 2 0 Calendar days Time, Change Order No. 3 0 Calendar days Revised Contract Time 460 Calendar days E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppeil, Texas and Landmark Structures, Inc., do hereby agree to append this Change Order No. 3 to the original contract between themselves, dated March 10, 1998. City of Coppeil, TexafiD - ~/~ Landmark Structures, Inc. By: By: B'i~gon Wheel Ranch Elevated Storage Tank (C. O. #3) Page 2 of 2 (9/9/98) j\clerical\coppell\96-149Xspecs%co-3doc -,-- /12" FIll ~ /.-~/~h Opening ;~ ! __ ..__j 3' x T Mandoor below 180° Jib Crane - See I~wg. S13-J ~. 12'wide x 14' Truck Doer below 1. System - Composite concrete slab/steel Ikx~r deck. Total slab depth- 5-'1/2'. - Simply supportecl non compo~.,, structural s~eel beam support. 2. Design Standards - SDI- specification ~ c~'nmenJary - AISC- allowable st~'sss ~[eslgn 3. Deslgn Uve Load - 125 pal 4. MELterlal SpeclflCa.tlOn - Refer to tietall drawing. s. 5. F'tn~h - galv&nlze all exposed metal deck ~nd l'ram[ng - steel trowel c~ncreta slab llnlah Rav~ D,, ' INTERMEDIATE FLOOR LAKE GENEVA - # 512 PLAN / GENERAL DESIGN ~ 08/96 LANDMARK S13 -A ~ ~ Tower Stalr Framlng 2 · FILl/12' Overflow Opening Frame 19'- 1 - 1/4" ~ : -' ~ n $ 'b 'etween beams. s 11.56° i -. ................... -~, ................ ~- .' ~ BM - W24 x 68 NOTES: 1. See Dwg. S13- F for beam fabrication details. 2. DImensions and angles shown are to the (~ of Inserts ~tev. Date INTERMEDIATE FLOOR FLOWER MOUND - #515 STRUCTURAL FRAMING Dam 06 196Dwn. ,. L A N D M A R K o~. s~3-s2 ~ 1/2' dla.'Expanslon Anchors @ 16" c/c II ' ~ 7" Sealant .:~.~,!:,;" 1/2' Expansion Joint (Install w/1/2' Cap Strip) ': ': ..~. ~ '.= 1/4" Expansion Joint ' """ ~ Call Closure ( shown ) or Girder Fi er ( beam connection locations ) ..... '~, ~-Metaj Deck . i . Felt paper bond breaker between deck and angle --~ x 1/4 angle ' PERIMETER ANGLE DETAIL ~_ 6~ ,70 '~2,,~;.-..,! ,~ Lift 3 .,., . .... .:. ,*-; 1I:3:';""'"" · ~,.',~. i ,__._ __ Beam Hanger Insert Plate w/10 pc's. 3/4' EC-2FW """"! · " :,?.. :~ .,----- -- Beam Hanger Plate w/10 pc's. 3/4' A325; SC bolts · . .~ !!,~ E,~,,. 6~.3o (Bottom of ~n,ert P~ate > i," :" ', ! t ~D Elev. 676.80 ( ~ ,p of Floor ) ,2~,,.-~ ..... , ,: :.'~'.L,.'. ..,...,. · .,. oo .'~': :' .' ~.' ii ° o BM 1 / aM 2 'h'> :.: :,:.,~ '. ~i; ~ ,--.--Beam Shea' ConnectJon Plate, Fasten w/12 pc's, 3/4' A32S-SC bolts -41/4=gap} ' BEAM CONNECTION DETAIL Bey. Date INTERMEDIATE FLOOR FLOWER MOUND - # 515 CONNECTION DETAIL · ' Date 06 / 96 ~ CTR LANDMARK