Loading...
MA1001-CS121210 T H E C I T Y O F COPPELL* 8 A. 5 1 5 December 10,2012 Adrian Bowman Jim Bowman Construction Co., LP 2716 S. Rigsbee Dr. Plano, Texas 75074 RE: Notification of Repairs Needed Under Maintenance Bond THIRD and FINAL NOTICE MA 10-01 Denton Tap @ Sandy Lake Paver Replacement Dear Mr. Bowman: You were notified by letter on August 7, 2012 and again on September 28, 2012 regarding necessary repairs to be done under the existing maintenance bond for the above captioned project. As of this date, the requested repairs have not been done as required under the bond presented for the workmanship of the construction. It is important that these repairs take place prior to any bad weather we may have this winter. 1. Pavement striping has deteriorated severely at several locations and must be replaced. Failure to address these repairs in a timely manner could result in notification to your surety and use of bond monies to perform the needed repairs. Please contact me at 972-304-7090 to inform me when your crew will be on the project to correct the deficiencies. I will be available to show them the areas that need immediate attention. Sincerely, Rick O'Dell Construction Inspector cc: George Marshall, P.E., Traffic Engineer Glenn Hollowell, P.E., Asst. Director of Public Works 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673