Loading...
Tax 2011B-LR121203ALLIAhICE GECITECHf11CRL QiOUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C12 -1001 Report Date: 12/03/2012 Project: Vanbebber Drive Street Improvements Location: Van Bebber Client: City of Coppell REPORT: Lime - Treated Material Gradation Date Sampled: 11/27/2012 Sampled By: Robert Griffiths By Order Of: Chris Order Number: 1770 LAB NO: 139009 Test Method: See Below Client PO: Q- 0612 -01 TEST RESULTS Report No: 139009 Page 1 of 1 A representative of Alliance Geotechnical Group checked the gradation of the lime- treated subgrade. Gradation tests were performed on the mixed material prior to compaction to verify compliance with project specifications which require a minimum of 100% passing the 1 3/4 in. sieve and 60% passing the No. 4 sieve. The test results follow. The results of these tests indicate compliance of the treated subgrade with grading requirements of the specifications. Test No. Location % Passing 1 3/4 in % Passing No. 4 1 W.bound VanBebber, 100'E. of Denton Tapp 100 64.0 2 W.bound VanBebber, 75'W. of Lakewood 100 62.0 3 W.bound VanBebber, 100'E. of Lakewood 100 60.0 Remarks: Tests taken at 3:40 p.m. Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group Perry C. akara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. Ai...LIftIYCE G�OTECHI'IlCRL t,�iOUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C12 -1001 Report Date: 12/03/2012 Project: Vanbebber Drive Street Improvements Location: Van Bebber Drive Date Sampled: 11/28/2012 Sampled By: Deniz Kilic By Order Of: Chris Order Number: 1770 Client: City of Coppell REPORT: Lime - Treated Material Gradation LAB NO: 139061 Test Method: See Below Client PO: Q- 0612 -01 TEST RESULTS Report No: 139061 Page 1 of 1 A representative of Alliance Geotechnical Group checked the gradation of the lime- treated subgrade. Gradation tests were performed on the mixed material prior to compaction to verify compliance with project specifications which require a minimum of 100% passing the 1 3/4 in. sieve and 60% passing the No. 4 sieve. The test results follow. The results of these tests indicate compliance of the treated subgrade with grading requirements of the specifications. Test No. Location %Passing 1 3/4 in % Passing No. 4 1 estbound Van Bebber Drive, station 16 +50 100 62.0 Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Ong: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENTAND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.