Loading...
ST0701-CS121211 T H E C I T Y O F COPPELL F`x q x A - 6 s i December 11,2012 VIA CERTIFIED MAIL Kody Harris Lacy Construction 1880 Crown Road Dallas TX 75234 RE: Southwestern Blvd.,Project#ST 07-01 Maintenance Repairs Required-THIRD NOTICE Dear Mr. Harris: Several months have passed since you were notified of maintenance repairs needed on the captioned project. Listed below is an item that needs your attention immediately: Sidewalks are failing in several locations: 1) at the ADA ramp on the northeast corner of Southwestern Blvd. and S. Coppell Rd., and 2) to the east down Southwestern Blvd. at some driveways. This sidewalk and ramp failure is a health and safety issue that must be attended to in the very near future. The maintenance period will be extended until the stated failure is repaired. Please contact me at your earliest convenience with the date your crew will be onsite to remedy the deficiency. Sincerely, ly' Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 rodell @coppelltx.gov cc: Ken Griffin, P.E., Director of Engineering&Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Matt Oyen, PacTrust 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673