Loading...
ST0501-LR121212 DEC-12-2012 06:26 P.08 AvA Texs CMT, Inc Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: December 12,2012 Test Date: November 6,2012 Client: City of Coppell Reinforcing Steel Report No. 28 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On November 6, 20.12 reinforcing steel was observed at the following locations: • S. Side C411 Wall from Sta. z20+50 to 20+00 • • • The following discrepancies were noted and called to the attention of a representative of Iowa Bridge and Culvert: 1. Coke can noted inside the forms. • 2. Pilaster chamfer needed trimming of expanding spra 3. S-bars too close to fascia form at one location. The above discrepancies were corrected as noted ' Technician: RG cc: Mr. Larry Davis-City of Coppell, Phone: 972-304-3684; via Fax: 9 04-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via - shall®coppelltx.gov Mr. Dan DeGroot- Burgess & Niple, Inc., Phone: 972-620-1255; via -mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill -Tiseo Paving Company, Phone: 972-289-0723; 'a E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via.E-mail: Bobby @CalConTex.com • Texas CMT, Inc. TBPE Firm: F-4521 Reviewed bv: ?/j= ^1 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. DEC-12-2012 06:26 p 09 to Texas CMT, Inca Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT ReportDate: December 12,2012 Test Date; November 6,2012 Client: City of Coppell Reinforcing Steel Report No. 29 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On November 15, 2012 reinforcing steel was observed at the following locations: • S. Side C411 Wall from Sta. z17+20 to 17+95 • There were no discrepancies. Technician: RG cc: Mr. Larry Davis -City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess & Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: '� - ---... All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • DEC-12-2012 06:26 P.10• C Texas CMT, Inc; Construction Materials Testing GEE consuftajits, Inc. 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: December 12,2012 Test Date: November 19,2012 Client: City of Coppell Reinforcing Steel Report No. 30 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On November 19, 2012 reinforcing steel was observed at the following locations: • S. Side C411 Wall from Sta. 16+60 to =17+30 • The following discrepancies were noted and called to the attention of a representative of Iowa Bridge and Culvert: 1. Top bars in pilaster were missing. The above discrepancies were corrected as noted..........,..,....../.... Technician: RG cc: Mr. Larry Davis-City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot-Burgess& Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.corn Mr. Bobby Bounds-California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed bv: 7.2)„,ga______. All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. DEC-12-2012 06:26 P.11 AVA Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: December 12,2012 Test Date: November 21,2012 Client: City of Coppell Reinforcing Steel Report No. 31 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 • Method of Test: Visual Observation Page: 1 of 1 Results: On November 21, 2012 reinforcing steel was observed at the following locations: • C411 Wall from Sta. z16+60 to z16+05 • • - There were no discrepancies. Technician: RG • cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess & Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill- Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.11