Loading...
Villas at LV 2-LR121211 Center-finical 2209 Wisconsin Street TeL 9:2.620.8911 ALPHA /�T E S T I N G Construction Materials Suite 100 Far:972.620.1302 Environmental Dallas,Texas 75229 www.alphatescing.com TBPE Firm No.813 WHERE IT ALL BEGINS December 11, 2012 JBGL BF Development,LLC 3131 Harvard Avenue, Suite 103 Dallas,Texas 75205 Attention: Mr. Scot Whitwer Re: Pavement Recommendations Villas at Lake Vista,Phase Two Lake Vista Drive Coppell,Texas ALPHA Report No. 121732-7 Recent laboratory test results on pavement subgrade soils for the referenced project indicated relatively high level of soluble sulfates (see ALPHA Report No. 121732-5 dated December 6, 2012). On December 10, 2012, we attended a project meeting with you,the City of Coppell, the paving contractor, and a representative of Dowdey, Anderson & Associates (the Engineer) to discuss pavement subgrade preparation alternatives. This letter summarizes our opinions as a result of that meeting. The design pavement section for the project generally consists of 6 inches of Portland cement concrete(PCC) over 6 inches of lime stabilized subgrade soils. Due to the high levels of'soluble sulfates measured in the pavement subgrade, we recommend eliminating the lime treatment of the pavement subgrade and increasing the PCC thickness. It is our opinion that increasing the PCC thickness by 1.5 inches as discussed at the project meeting should provide a pavement section that is equal to or superior to the original pavement section. The Engineer-of-Record for the pavement design (Dowdey Anderson) should review this letter and make any required changes to the pavement design if they are in concurrence. ALPHA TESTING,INC. appreciates the opportunity to be of service on this project. If you have any questions regarding this letter,please contact our office. Sincerely, ALPHA TESTING,IN F 11r.. 1 — — .`� *I iii { `% Theodore A. (Tonyi DORE A.•JANISH ' "' '• E• Principal g lice President 82418 TAJ/BAP tt *��CENSs'9•'. ' - ! C7 11% IONv� s ` , Copies: (1) Client OA I \-'::::E _-'----- DtIL • Fr or • tidn •lnconn, WinPAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: Company: Contractor: Project Description: 7 inches of Concrete on Raw Subgrade Location: Rigid Pavement Design/Evaluation PCC Thickness 7.00 inches Load Transfer,J 3.20 Design ESALs 1,705,800 Mod.Subgrade Reaction,k 150 psi/in Reliability 80.00 percent Drainage Coefficient,Cd 1.00 Overall Deviation 0.35 Initial Serviceability 4.50 Modulus of Rupture 630 psi Terminal Serviceability 2.00 Modulus of Elasticity 4,252,500 psi Modulus of Subgrade Reaction(k-value)Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value(0,1,2,3) 0.0 Modulus of Subgrade Reaction 150.00 psi/in Friday, December 7,2012 2:01:57PM Engineer: Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: Company: Contractor: Project Description: 6 inches of Concrete with Lime Stabilized Subgrade Location: Rigid Pavement Design/Evaluation PCC Thickness 6.00 inches Load Transfer,J 3.20 Design ESALs 1,089,400 Mod.Subgrade Reaction,k 300 psi/in Reliability 80.00 percent Drainage Coefficient,Cd 1.00 Overall Deviation 0.35 Initial Serviceability 4.50 Modulus of Rupture 630 psi Terminal Serviceability 2.00 Modulus of Elasticity 4,252,500 psi Modulus of Subgrade Reaction fk-value)Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value(0,1,2,3) 0.0 Modulus of Subgrade Reaction 300.00 psi/in Friday, December 7,2012 2:00:12PM Engineer: