ST0501-CN121211 DEC-11-2012 02:53 P.01
Ar .--:7„._ ,
Construction Materials Testing •
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
•
FAX TRANSMITTAL SHEET
To:
L* çay D# i 15
F ro in: R C/L477"1lrD Gem
Phone/Fax: '172 -304 —3 5 7 Q
# of Pages (Including Cover Sheet): J'
Date: _ 1241,4 2,
lessage: FY t J 001115 m' V01e.- - �-' S lt.(- Pu r rryv+ Df P611 .
ATr, c. A Cool 1 rs Op t , _ - crl. is -
.I7slsIFR FYI: "-- el--
. -- .1 «4Vo1Gee, . I
4.5
...---.-
HOT WEATHER CONCRETING CONSID TIONS
4'.
7 r
BEFORE PI,ACEIVIENT
ja---
• Consider using a concrete set retarding admixture �/�V//
• Periodically spray forms,reinforcing steel and subgrade with water VVV
• Erect sun shade and wind harriers
DURING PLACEMENT AND FINISHING
• Place concrete as quickly as possible
• Notify ready mix producer of any delays
• Vibrate or screed without delay
• Protect concrete test specimens
AFTER FINISHING
• Mart curing the concrete immediately
• Periodically spray water on outside of forms
CONFIDENTIALITY NOTICE: This facsimile contains confidential information which may also be legally privileged and which is intended '
,r the tic of the Addressee(s)named above. If you are not the intended recipient,or the employee or agent responsible for delivering it to the
intcnJ,.J recipient.you are hereby notified that any dissemination or copying of this facsimile,or the taking of any action in reliance on the
.,,ntcnts or this telecopicd information_may he strictly prohibited. If you have received this facsimile in error,please notify us immediately by
,;;eph.,n:and return the entire facsimile to us at the above address via U.S.Postal Service.
DEC-11-2012 02:53 P.02
A
AVA Texas C ` T, Inc.
Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive • Dallas,Texas 75229 • (214) 352-6957 • Fax(214) 352-6972
INVOICE
To: Mr. Robert Cau I ill Invoice No.: 211126-07
Tiseo Paving Company Invoice Date: October 30, 2012
P.O. Box 270040 Project Number: 211-0126
Dallas, Texas 75227 City of Coppell Project No.: ST-05-01
Project: 1- . . 'oratory Testing
Deforest Road Reconstruction
Coppell, Texas
TERMS: DUE UPON RECEIPT
Date of
Sampling Description Quantity Rate Total
10-2-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00
Rate
10-4-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00
Rate
10-5-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00
Rate
10-5-12 Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10
for California Const. Concrete Tests Before
7:30AM
10-12-12 Over-time Charges (Above that Charged to City) 0.75 hrs $16.10 $12.08
for California Const. Concrete Tests After 5:00PM
10-12-12 Concrete Mix Observation: Regular Time Rate 0.83 hrs $46.00 $38.18
(0.83 hrs. Concrete Standby Time; Waiting on
Redi-Mix Delivery to California Const. )
10-15-12 Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10
for Tiseo Concrete Tests Before 7:30AM
10-17-12 Concrete Mix Observation: Regular Time Rate 1.0 hrs $46.00 $46.00
(1.0 hrs. Concrete Delay Time; Waiting on TXI
Delivery to Texas Inlets )
10-19-12 f Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10
Ifor Tiseo Concrete Tests Before 7:30AM
DEC-11-2012 02:53 P.03
Date of Description Quantity Rate Total
Sampling
10-19-12 Rebar Observation Requested by Walter: Regular 0.75 hrs $46.00 $34.50
Time Rate, of California Const. N. Side Driveway
10-23-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03
for California Const. Concrete Tests After 5:00PM
10-23-12 Concrete Mix Observation: Regular Time Rate 1.75 hrs $46.00 $80:50
(1.75 hrs. Concrete Standby Time; Waiting on
Redi-Mix Delivery to California Const. )
0=27-12 Over-time Charges (Above that Charged to City) 2.5 hrs $16.10 $40.25
for Tiseo Concrete Tests on a Saturday
10-27-12 Concrete Mix Observation: Regular Time Rate 0.75 hrs $46.00 $34.50
(0.75 hrs. Utility Patch Concrete Standby Time;
Waiting on Tiseo Rebar and Concrete Delivery to
Tiseo )
109-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05
.0,...,1939-12
/ for California Const. Concrete Tests Before 7:30
AM
10-29-12 Concrete Mix Observation: Regular Time Rate 0.75 hrs $46.00 $34.50
(0.75 hrs. Concrete Standby Time; Waiting on
Redi-Mix Drive Way Delivery to California Const.)
10-31-12 Concrete Mix Observation: Regular Time Rate 1.5 hrs $46.00 $69.00
(1.5 hrs. Concrete Cancellation; Walter Forgot to
Call)
10-31-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05
for California Const. Concrete Tests After 5:00PM
Please Pay: $586.94
*** Due Upon Receipt. To Avoid Late Payment Interest, Please Pay Prior to November 30, 2012
***
cc: Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall@coppelltx.gov
Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Texas CMT,Inc. Invoice No.211126-7
Page 2 of 2
Deforest Road Reconstruction
DEC-11-2012 02:54 P.04
A
AVA Tex s C T, Inc.
Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive • Dallas,Texas 75229 • (214)352,6957 • Fax(214) 352-6972
INVOICE
To: r. Robert audill Invoice No.: 211126-08
Tiseo Paving -.mpany Invoice Date: November 30, 2012
P.O. Box 270040 Project Number: 211-0126
Dallas, Texa - 27 City of Coppell Project No.: ST-05-01
Project: Field and Laboratory Testing
Deforest Road Reconstruction
Coppell, Texas
TERMS: DUE UPON RECEIPT
Date of
Sampling Description Quantity Rate Total
11-2-12 I Sidewalk In place Density Re-Tests, Regular Time 1 ea. I $43.00 I $43.00
Rate I f
11-2-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03
for California Const. Concrete Tests After 5:00PM
11-5-12 Sidewalk In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00
Rate
11-7-12 Sidewalk In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00
Rate
..„--1-1-7-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05
for California Const. Concrete Tests After 5:00PM
11-8-12 Concrete Mix Observation: Regular Time Rate 1.0 hrs $46.00 $46.00
(1.0 hrs. Concrete Standby Time; Waiting on LMC
Delivery to Iowa )
11-8-12 Early Strength Concrete Test Cylinder Requested ( 1 ea. $26.00 I $26.00
I by Iowa Bridge
11-14-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03
for Iowa Concrete Tests After 5:00PM
11-14-12 Early Strength Concrete Test Cylinder Requested I 1 ea. I $26.00 I $26.00
I by Iowa Bridge
11-15-12 Concrete Mix Observation Cancellation: Regular 1.5 hrs $46.00 $69.00
Time Rate, Iowa Bridge Not Ready on arrival
DEC-11-2012 02:54 P.05
Date of
Sampling Description Quantity Rate Total
11-15-12 I Trip Charge ( 4 Hours or less) I 1 ea. I $42.00 I $42.00
11-16-12 Concrete Mix Observation: Regular Time Rate 2.0 hrs $46.00 $92.00
(2.0 hrs. Concrete Standby Time; Waiting on LMC
Delivery to Iowa )
11-16-12 Over-time Charges (Above that Charged to City) 0.75 hrs $16.10 $12.08
for Iowa Concrete Tests After 5:00PM
11-16-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00
by Iowa Bridge
11-19-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00
by Iowa Bridge
11-21-12 Concrete Mix Observation: Regular Time Rate 1.5 hrs $46.00 $69.00
(1.5 hrs. Concrete Standby Time; Waiting on LMC
Delivery to Iowa Bridge )
11-27-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00
by Iowa Bridge
11-29-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00
by Iowa Bridge
Please Pay: $631.19
*** Due Upon Receipt. To Avoid Late Payment Interest, Please Pay Prior to December 30, 2012
***
cc: Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall®coppelltx.gov
Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Texas CMT,Inc. Invoice No.211126-8
Deforest Road Reconstruction Page 2 of 2
TOTAL P.05