Loading...
ST0501-CN121211 DEC-11-2012 02:53 P.01 Ar .--:7„._ , Construction Materials Testing • and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • FAX TRANSMITTAL SHEET To: L* çay D# i 15 F ro in: R C/L477"1lrD Gem Phone/Fax: '172 -304 —3 5 7 Q # of Pages (Including Cover Sheet): J' Date: _ 1241,4 2, lessage: FY t J 001115 m' V01e.- - �-' S lt.(- Pu r rryv+ Df P611 . ATr, c. A Cool 1 rs Op t , _ - crl. is - .I7slsIFR FYI: "-- el-- . -- .1 «4Vo1Gee, . I 4.5 ...---.- HOT WEATHER CONCRETING CONSID TIONS 4'. 7 r BEFORE PI,ACEIVIENT ja--- • Consider using a concrete set retarding admixture �/�V// • Periodically spray forms,reinforcing steel and subgrade with water VVV • Erect sun shade and wind harriers DURING PLACEMENT AND FINISHING • Place concrete as quickly as possible • Notify ready mix producer of any delays • Vibrate or screed without delay • Protect concrete test specimens AFTER FINISHING • Mart curing the concrete immediately • Periodically spray water on outside of forms CONFIDENTIALITY NOTICE: This facsimile contains confidential information which may also be legally privileged and which is intended ' ,r the tic of the Addressee(s)named above. If you are not the intended recipient,or the employee or agent responsible for delivering it to the intcnJ,.J recipient.you are hereby notified that any dissemination or copying of this facsimile,or the taking of any action in reliance on the .,,ntcnts or this telecopicd information_may he strictly prohibited. If you have received this facsimile in error,please notify us immediately by ,;;eph.,n:and return the entire facsimile to us at the above address via U.S.Postal Service. DEC-11-2012 02:53 P.02 A AVA Texas C ` T, Inc. Construction Materials Testing and Environmental Consulting 10044 Monroe Drive • Dallas,Texas 75229 • (214) 352-6957 • Fax(214) 352-6972 INVOICE To: Mr. Robert Cau I ill Invoice No.: 211126-07 Tiseo Paving Company Invoice Date: October 30, 2012 P.O. Box 270040 Project Number: 211-0126 Dallas, Texas 75227 City of Coppell Project No.: ST-05-01 Project: 1- . . 'oratory Testing Deforest Road Reconstruction Coppell, Texas TERMS: DUE UPON RECEIPT Date of Sampling Description Quantity Rate Total 10-2-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00 Rate 10-4-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00 Rate 10-5-12 Pavement In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00 Rate 10-5-12 Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10 for California Const. Concrete Tests Before 7:30AM 10-12-12 Over-time Charges (Above that Charged to City) 0.75 hrs $16.10 $12.08 for California Const. Concrete Tests After 5:00PM 10-12-12 Concrete Mix Observation: Regular Time Rate 0.83 hrs $46.00 $38.18 (0.83 hrs. Concrete Standby Time; Waiting on Redi-Mix Delivery to California Const. ) 10-15-12 Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10 for Tiseo Concrete Tests Before 7:30AM 10-17-12 Concrete Mix Observation: Regular Time Rate 1.0 hrs $46.00 $46.00 (1.0 hrs. Concrete Delay Time; Waiting on TXI Delivery to Texas Inlets ) 10-19-12 f Over-time Charges (Above that Charged to City) 1.0 hrs $16.10 $16.10 Ifor Tiseo Concrete Tests Before 7:30AM DEC-11-2012 02:53 P.03 Date of Description Quantity Rate Total Sampling 10-19-12 Rebar Observation Requested by Walter: Regular 0.75 hrs $46.00 $34.50 Time Rate, of California Const. N. Side Driveway 10-23-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03 for California Const. Concrete Tests After 5:00PM 10-23-12 Concrete Mix Observation: Regular Time Rate 1.75 hrs $46.00 $80:50 (1.75 hrs. Concrete Standby Time; Waiting on Redi-Mix Delivery to California Const. ) 0=27-12 Over-time Charges (Above that Charged to City) 2.5 hrs $16.10 $40.25 for Tiseo Concrete Tests on a Saturday 10-27-12 Concrete Mix Observation: Regular Time Rate 0.75 hrs $46.00 $34.50 (0.75 hrs. Utility Patch Concrete Standby Time; Waiting on Tiseo Rebar and Concrete Delivery to Tiseo ) 109-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05 .0,...,1939-12 / for California Const. Concrete Tests Before 7:30 AM 10-29-12 Concrete Mix Observation: Regular Time Rate 0.75 hrs $46.00 $34.50 (0.75 hrs. Concrete Standby Time; Waiting on Redi-Mix Drive Way Delivery to California Const.) 10-31-12 Concrete Mix Observation: Regular Time Rate 1.5 hrs $46.00 $69.00 (1.5 hrs. Concrete Cancellation; Walter Forgot to Call) 10-31-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05 for California Const. Concrete Tests After 5:00PM Please Pay: $586.94 *** Due Upon Receipt. To Avoid Late Payment Interest, Please Pay Prior to November 30, 2012 *** cc: Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall@coppelltx.gov Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Texas CMT,Inc. Invoice No.211126-7 Page 2 of 2 Deforest Road Reconstruction DEC-11-2012 02:54 P.04 A AVA Tex s C T, Inc. Construction Materials Testing and Environmental Consulting 10044 Monroe Drive • Dallas,Texas 75229 • (214)352,6957 • Fax(214) 352-6972 INVOICE To: r. Robert audill Invoice No.: 211126-08 Tiseo Paving -.mpany Invoice Date: November 30, 2012 P.O. Box 270040 Project Number: 211-0126 Dallas, Texa - 27 City of Coppell Project No.: ST-05-01 Project: Field and Laboratory Testing Deforest Road Reconstruction Coppell, Texas TERMS: DUE UPON RECEIPT Date of Sampling Description Quantity Rate Total 11-2-12 I Sidewalk In place Density Re-Tests, Regular Time 1 ea. I $43.00 I $43.00 Rate I f 11-2-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03 for California Const. Concrete Tests After 5:00PM 11-5-12 Sidewalk In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00 Rate 11-7-12 Sidewalk In-place Density Re-Tests, Regular Time 1 ea. $43.00 $43.00 Rate ..„--1-1-7-12 Over-time Charges (Above that Charged to City) 0.5 hrs $16.10 $8.05 for California Const. Concrete Tests After 5:00PM 11-8-12 Concrete Mix Observation: Regular Time Rate 1.0 hrs $46.00 $46.00 (1.0 hrs. Concrete Standby Time; Waiting on LMC Delivery to Iowa ) 11-8-12 Early Strength Concrete Test Cylinder Requested ( 1 ea. $26.00 I $26.00 I by Iowa Bridge 11-14-12 Over-time Charges (Above that Charged to City) 0.25 hrs $16.10 $4.03 for Iowa Concrete Tests After 5:00PM 11-14-12 Early Strength Concrete Test Cylinder Requested I 1 ea. I $26.00 I $26.00 I by Iowa Bridge 11-15-12 Concrete Mix Observation Cancellation: Regular 1.5 hrs $46.00 $69.00 Time Rate, Iowa Bridge Not Ready on arrival DEC-11-2012 02:54 P.05 Date of Sampling Description Quantity Rate Total 11-15-12 I Trip Charge ( 4 Hours or less) I 1 ea. I $42.00 I $42.00 11-16-12 Concrete Mix Observation: Regular Time Rate 2.0 hrs $46.00 $92.00 (2.0 hrs. Concrete Standby Time; Waiting on LMC Delivery to Iowa ) 11-16-12 Over-time Charges (Above that Charged to City) 0.75 hrs $16.10 $12.08 for Iowa Concrete Tests After 5:00PM 11-16-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00 by Iowa Bridge 11-19-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00 by Iowa Bridge 11-21-12 Concrete Mix Observation: Regular Time Rate 1.5 hrs $46.00 $69.00 (1.5 hrs. Concrete Standby Time; Waiting on LMC Delivery to Iowa Bridge ) 11-27-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00 by Iowa Bridge 11-29-12 Early Strength Concrete Test Cylinder Requested 1 ea. $26.00 $26.00 by Iowa Bridge Please Pay: $631.19 *** Due Upon Receipt. To Avoid Late Payment Interest, Please Pay Prior to December 30, 2012 *** cc: Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall®coppelltx.gov Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Texas CMT,Inc. Invoice No.211126-8 Deforest Road Reconstruction Page 2 of 2 TOTAL P.05