Loading...
Channel Pointe-CS 900921 COPPELL PUBLIC WORKS MEMORANDUM DATE: September 21, 1990 ~ TO: Larry Davis, Development Construction Inspector\~ FROM: Howard Pafford, Water Utilities Superintendent~.. Walk-through Punchlist - Channel Pointe Water utilities personnel have conducted a final walk-through of the above referenced project and the following items were found to be deficient. 1) Sanitary Sewer lines on Cove Drive and Bay Circle Drive need to be flushed and someone from the Utilities Division will need to be present to verify proper flow through each manhole. 2) Cove Drive - Lot 10 - Regrout inside of manhole ring. 3) Bay Circle Drive - Lot 9 - Regrout outside of manhole ring. 4) Bay Circle - Lot 6 - Lower manhole ring and lid to curb grade, then regrout inside and out. 5) Bay Circle Drive - Lot i - Lower manhole ring and lid, then regrout inside and outside. 6) Bay Circle Drive and Parkway. Unable to locate manhole lid. Please insure that each of these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP/mp CHANNELP.HLP