Loading...
Channel Pointe-CS 900919 COPPELL PUBLIC WORKS MEMORANDUM DATE: September 19, 1990 TO: Howard Pafford, Water Utilities Superintendent Per Birdsall, Street Superintendent M. Shohre Daneshmand, Acting City Engineer Ben dela Cruz, Engineering Staff Troy Glidewell, Fire Marshal Dale Jackson, Building Official FROM:~~arry Davis, Construction Inspector RE: Channel Pointe A final inspection of the above referenced project has been requested by the utility contractor, C.W. Young Construction Co. The final walk through will be conducted on Friday, September 21, 1990 at 9:00 A.M.. If I can be of further assistance, please let me know. Thank you. CLD/bd CHANNEL.CLD