Cici's Addition-LR 991021CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project:
Client:
Ci Ci/JMC Distribution Center
Coppell, TX
Reed Engineering Group
2424 Stutz, Suite 400
Dallas, TX 75235
Report No: 15389-9
Attention: Keith Atkins
Date of Service: 10-21-99
Page I of i
Drawings utilized:
REPORT OF INSPECTION
Structural Prints
Locations/item inspected:
As noted.
Discrepancies/comments:
Reinspection of report 15352-9, dated October 18, 1999.
Joist and joist girder bottom chord connection have all now been welded.
Initial Inspection
Joist support angle to panel embed on east wall - Due to mislocated embed, erector has welded on
extra support angle to the existing angle and then installed two (2) concrete expansion boltsJ
Larry G. Peel, CWI #89120661 . -
Technician ~.Cmfitract Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client
GEOTECHNICAL AND
ENVIP, ONt4ENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution
1620 Rafe Street, Suite 114
Carrollton, Texas 75006
ATTN: Mr. Bob Kulick
REPORT NO. 47
REG PROJECT NO. 5608
SAMPLE DATE: 10-21-99
TECHNICIAN: O. Thornton
CONTRACTOR: Bullard Construction
Location of Sample
I
1 Ramp Area, Grd ne A.A x 01.5 10/10 I
Test Results
1 9033 10-28-99 7 89010 3150
9033 10-28-99 7 91190 3230 3190
9033 11-18-99 28
9033 11-18-99 28
Cylinder Data
[ .... i ......... 9033 4.25 2:15 PM 88 74 N/A 1441506 J
Distribution: (1)
(1)
(1)
(1)
JMC Restaurant Distribution/
Mr. Bob Kulick
Weeks Corporation/Mr. Paul Brown
Bullard Corporation/
Mr. Keith McMahon
Corgan Associates/
Mr. Jorge Gonzalez
(1) L.A. Fuess Partners/
Mr. Thomas Scott
(1) Pacheco Koch/Mr. Chris Jones
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/sa
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND G J~ I'-1
ENVIRONPIENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution
1620 Rafe Street, Suite 114
Carrollton, Texas 75006
ATTN: Mr. Bob Kulick
REPORT NO. 47
REG PROJECT NO. 5608
SAMPLE DATE: 10-21-99
TECHNICIAN: O. Thornton
CONTRACTOR: Bullard Construction
Location of Sample
I 1 Ramp Area, Gridline A.A x 01.5 10/10
Design Information
"' ~-*.'*,?i '" ...... ~'~[e I!~!!~'¢~~~~!t~*~~~l!E~l~ii~l~'~ ~ :*"l "P, :':* :i i¢!~i ....... ~'~'""~ ......... ~*~ i ~%~;,~,¢~1I
8204 3500 I
Test Results
1 9033 10-28-99 7 89010 3150
9033 10-28-99 7 91190 3230 3190
9033 11-18-99 28 121160 4290
9033 11-18-99 28 122780 4340 4320
Cylinder Data
[ 1 9033 4.25 2:15 PM 88 74 N/A 1441506 J
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
JMC Restaurant Distribution/
Mr. Bob Kulick
Weeks Corporation/Mr. Paul Brown
Bullard Corporation/
Mr. Keith McMahon
Corgan Associates/
Mr. Jorge Gonzalez
L.A. Fuess Partners/
Mr. Thomas Scott
Pacheco Koch/Mr. Chris Jones
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/sa/rt
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019