Loading...
Cici's Addition-LR 991011GEOTECHNICAL AND ~ J~ I'--I U ~ ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION CiCi's Corporate Headquarters Bethel Road Coppell, Texas REPORTED TO: JMC Restaurant Distribution REPORT NO. 38 1620 Rare Street, Suite 114 REPORT DATE: Carrollton, Texas 75006 ATTN: Mr. Bob Kulick 10-11-99 REG PROJECT NO. 5608 DATE OBSERVED: 09-16-99 TECHNICIAN: G. Ortiz PAGE: 1 of 1 CONTRACTOR: Bullard Construction e J Building slab panel leaveout: A to E.5, 5'S of line 1 and A to E.5, 7'N of line 5. J E~fere~ce ~la~ ~[ Nbtes ~s~i J Sheet S1.01 J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1) JMC Restaurant Distribution/ Mr. Bob Kulick (1) Weeks Corporation/Mr. Paul Brown (1) Bullard Corporation/ Mr. Keith McMahon (1) Corgan Associates/ Mr. Jorge Gonzalez (1) L.A. Fuess Partners/ Mr. Thomas Scott (1) Pacheco Koch/Mr. Chris Jones (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019