Cici's Addition-LR 991011GEOTECHNICAL AND ~ J~ I'--I U ~
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution REPORT NO. 38
1620 Rare Street, Suite 114 REPORT DATE:
Carrollton, Texas 75006
ATTN: Mr. Bob Kulick
10-11-99
REG PROJECT NO. 5608
DATE OBSERVED: 09-16-99
TECHNICIAN: G. Ortiz
PAGE: 1 of 1
CONTRACTOR: Bullard Construction
e J Building slab panel leaveout: A to E.5, 5'S of line 1 and
A to E.5, 7'N of line 5.
J E~fere~ce ~la~ ~[ Nbtes ~s~i J Sheet S1.01
J X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1) JMC Restaurant Distribution/
Mr. Bob Kulick
(1) Weeks Corporation/Mr. Paul Brown
(1) Bullard Corporation/
Mr. Keith McMahon
(1) Corgan Associates/
Mr. Jorge Gonzalez
(1) L.A. Fuess Partners/
Mr. Thomas Scott
(1) Pacheco Koch/Mr. Chris Jones
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
JFP/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019