Loading...
Cici's Addition-LR 990915GEOTECHNICAL AND G J=::J r-I I I p ENVIP, ONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION CiCi's Corporate Headquarters Bethel Road Coppell, Texas REPORTED TO: JMC Restaurant Distribution 1620 Rare Street, Suite 114 Carrollton, Texas 75006 Al'TN: Mr. Bob Kulick CONTRACTOR: Bullard Construction REPORT NO. 31 REPORT DATE: 09-15-99 REG PROJECT NO. 5608 DATE OBSERVED: 08-18-99 TECHNICIAN: F. Gomez PAGE: 1 of 1 30, 31 and 32 J ReJe~e~e ~lans ~ Note~ u eei I Structural plans J Eist.Bev!iat!en~s Noted: :.i; J 1) Panels #13, 31, and 22 were not ready. 2) Panels #12 and 38 missing bars, fi,4 bars at top of the door. 3) Missing chairs in #2. J ~emments: J Changes on Panel #2 The noted deviations were reported to: General Contractor X IThe noted deviations were corrected on 08-19-99. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) (1) (1) (1) (1) (1) (1) (1) JMC Restaurant Distribution/ Mr. Bob Kulick Weeks Corporation/Mr. Paul Brown Bullard Corporation/ Mr. Keith McMahon Corgan Associates/ Mr. Jorge Gonzalez L.A. Fuess Partners/ Mr. Thomas Scott Pacheco Koch/Mr. Chris Jones City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/meb 2424 STUTZ DR. · SUITE 400 ,~ DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019