Cici's Addition-LR 990915GEOTECHNICAL AND G J=::J r-I I I p
ENVIP, ONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution
1620 Rare Street, Suite 114
Carrollton, Texas 75006
Al'TN: Mr. Bob Kulick
CONTRACTOR: Bullard Construction
REPORT NO. 31
REPORT DATE: 09-15-99
REG PROJECT NO. 5608
DATE OBSERVED: 08-18-99
TECHNICIAN: F. Gomez
PAGE: 1 of 1
30, 31 and 32
J ReJe~e~e ~lans ~ Note~ u eei I Structural plans
J Eist.Bev!iat!en~s Noted: :.i; J 1) Panels #13, 31, and 22 were not ready.
2) Panels #12 and 38 missing bars, fi,4 bars at top of the
door.
3) Missing chairs in #2.
J ~emments: J Changes on Panel #2
The noted deviations were reported to: General Contractor
X IThe noted deviations were corrected on 08-19-99.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
JMC Restaurant Distribution/
Mr. Bob Kulick
Weeks Corporation/Mr. Paul Brown
Bullard Corporation/
Mr. Keith McMahon
Corgan Associates/
Mr. Jorge Gonzalez
L.A. Fuess Partners/
Mr. Thomas Scott
Pacheco Koch/Mr. Chris Jones
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
JFP/meb
2424 STUTZ DR. · SUITE 400 ,~ DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019