Loading...
Chautauqua-CS 920214~e~bruary 14, 1992 Mr. Nathan D. Maier Nathan D. Maier Consulting Engineers, Inc. Three Northpark/8800 N. Central Expressway, Ste. 300 Dallas, TX 75231 Re: Chautauqua Place Dear Mr. Maier: I have received and reviewed the referenced plans and have the following comments to offer: 1} The sidewalk should be shown on the streets and also in the standard street section detail. 2) I am still concerned that the filling on Lot 5 Blk A will cause potential drainage problems for the lots in the Hunterwood Addition that backup to Lot 5. 3) All standard details should be provided when the plans are resubmitted. 4) The installation of the drainage system in Bethel School Road will have to be coordinated with the construction of the Harris Street/Bethel School Road improvements. If that street is not constructed concurrent or prior to the construction of this subdivision, then some t~pe of different drainage outfall will be required with appropriate easements and ditching. 5) On Sheet 5, the general notes indicate that the water services shall be a minimum of 3/4~. Please note that the water services should be a minimum of 1" with a 3/4" ~ter. 6) The landscaping and irrigation plans are currently under review by Public Works. Once these corrections have been made, the revised plans and this review set should be resubmitted. If I can answer any questions or provide any additional information, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer