Loading...
ST0501-LR121228 DEC-31-2012 02:28 P.01 AL Texas C :\ T, Inc. AVA • Construction Materials Testing Post-it®Fax Note 7671 Date #of and Environmental Consulting To /�gy,pp,pp }�/n� j!r (pages∎ �ll�f�y ogv rs From Te s �,�-„ Co./Dept.CN& �/v SP• co.�EE c,,,°-nstJ- D.4445' 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352- Phone# q C 3 o .3/(yam Phone#2 C4,3Sz_0�G}y^s ' Fax#1/z 3c 4-38 10 Fax#z(4-;ca- /' l7z REPORT OF CONCRETE MIX OBSERVATION �f (� Report Date: December 28, 2012 Date Concrete Placed: November 27, 2012 Standard 6"x12"Cylinders Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Inches J� Project: Deforest Road Reconstruction Concrete Report No.: 136 Contractor: Iowa Bridge and Culvert Project No.:211-0125 Concrete Supplier and Plant: LMC/952 City of Coppcll Project No.: ST-05-01 Location of Placement: C411 Wall, from z Sta. 16+05 to 15+40, S. Side MATERIALS Source I SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 1:29 PM Cement: Time Sampled: 2:27 PM Fly Ash: Sample Location: Sta. 15+75 Truck/Ticket No: 5005/62940714 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 54°F Fine Aggregate: Concrete Range: 70°F • Admixtures: Slump Range(inches): 5.5 1 . Weather Conditions: Clear• Time Started: 1:00 PM 2 Time Completed: 4:00 PM Added Water: 9 Gallons Sample Air Content(%): 4.3 Total Cubic Yards Placed: 9. Required Strength(Lbs./sq.in.): 3,600 / ' II Specimen Measured Age Date Total Load Compressive Strength Re ,±rks Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In.) DFR544 3 11/30/12 81,180 2,870 • DFR 545 7 12/4/12 101,580 3,590 DFR 546 5.5 27 12/24/12 130,260 4,610 • DFR 547 27 12/24/12 125,780 ',450 DFR 548 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: RG ASTM C-31, C-39, C-143 (Unless Noted Otherwise) � ' Remarks and/or Distribution: 1\e 1 cc: Mr. Larry Davis - Ci of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr.Dan DeGroot- Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalCo om • Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: :c ---- Ail letters and reports are for the exclusive use of the chest to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. DEC-31-2012 02:28 P.02 A AVAtik Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: December 28, 2012 Date Concrete Placed: November 29, 2012 Standard 6"x12"Cylinders Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Incites Project: Deforest Road Reconstruction Concrete Report No.: 137 Contractor: Iowa Bridge and Culvert Project No.:211-0125 Concrete Supplier and Plant: LMC /PA952 City of Coppell Project No.: ST-05-O 1 Location of Placement: C411 Wall, from ^ Sta. 15+40 to 15+00, S. Side MATERIALS Source ; SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 1:35 PM Cement: Time Sampled: 2:20 PM Fly Ash: Sample Location: Sta. 15+15 Coarse A Truck/Ticket No: 5022/62940808 ggregate: Temperature: Intermediate Aggregate: Ambient Range: 68°F Fine Aggregate: Concrete Range: 73°F Admixtures: Slump Range (inches): 4.0 1 'Weather Conditions: Clear Time Started: 1:00 PM 2 Time Completed: 3:30 PM • Added Water: 6 Gallons Sample Air Content(%): 4.2 Total Cubic Yards Placed: 6 Required Strength(Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength . . Number Slump(in.) Remarks p( ) (Days) Tested (Lbs.) (Lbs./Sq.In.) DFR 549 4 12/3/12 99,280 3,510 i DFR 550 7 12/6/12 109,300 3,870 k- DFR DFR 551 4.0 28 12/27/12 137,520 4,860 DFR 552 28 12/27/12 135,640 4,.1 0 r 553 H Hold Test Methods Utilized Fracture Regular ASTM C-3I, C-39, C-143 (Unless Noted Otherwise) Cylinders dl� i Remarks and/or Distribution: V • 3 a.E cc: Mr. Larry Davis - City of/131a. oppe , Phone: 972- 04-3684; via 94F •X994.-3570 Mr. George Marshall - City of Coppell, Phone: 972-304 , via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess &Niple, Inc., Pho •59'12 620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Comp , one: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Pavin C pany, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @Ca1Co x.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: filer_e_____ All letters and reports are for the exclusive use of the client to whom they are addressed and shall nor be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.02