Loading...
Chautauqua-CS 920109 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 January 9, 1992 Mr. Mike Daniels, P.E. Nathan Maier Consulting Engineers, Inc. 8800 N. Central Expressway, Suite 300 Dallas, Texas 75231 Re: Chautauqua Place Development Fee Assessment Dear Mr. Daniels: We are enclosing a copy of the City of Coppell Development Fee Assessment list along with copies of the development fee calculations for the Chautauqua Place Addition to the City of Coppell. Please provide a check made payable to the City of Coppell in the amount of $39,692.63 plus 2% of the construction cost, and forward it to Ms. Carolyn Bebermeyer, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide our office with a copy of your Engineer's Estimate for this project or contract amount for verification of the construction inspection fee. Please provide a copy of your paid receipt to our office and to Shimek, Jacobs & Finklea, Attn: Mr. Gary C. Eendricks. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do no hesitate to contact me. Sincerely, lr~.~eth ~. Griffin, P.E. City Engineer KMG/bd cc: Gary Sieb, Director of Planning and Community Services Steve Goram, Director of Public Works Carolyn Bebermeyer, Finance Department Gary C. Hendricks, P.E., Plan Review Engineer M. Shohre Daneshmand, P.E., Civil Engineer CITY OF COPPELL DEVELOPMENT FEES Date: January 9, 1992 Project: Chautauqua Place Amount Due Prior to Total Council Assessment Approval Park Fee $ 4,350.00 $ 2,175.00 (50% payable prior to Council Approval) (50% payable with Building Permit) Water Impact Fee $24,050.00 $24,050.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 3,000.00 $ -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $13,050.00 $13,050.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 2,900.00 $ -0- (100% due at Issuance of Building Permit) Street Sign Fee $ 417.63 $ 417.63 (100% due prior to Council Approval) Street Light Fee * * (100% due prior to Council Approval) Construction Inspection Fee $ $ (100% due prior to Council Approval) (Based on 2% of project construction cost to be provided by the Developer's Engineer) TOTALS $47,767.63 $39,692.63 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL: $39,692.63 Plus 2% Construction Inspection Fee · This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. Note: This project is NOT within the Coppell Municipal Utility District No. 1. Therefore, the Wastewater Impact Fee is due prior to Council Approval. CHADEV1 COPP~LL PUBLIC i~RKS ~ Shohre Danes~and, Acting City Engineer ~ ~= P~lic Works Staff~ ~= Development Fees for Chautau~a Place The foll~ing fees should be assessed on the above referenced project. Water ~ct F~= 29 - 5/8' x 3~4' ~stic Meter/s = 29 ESU'8 1 - 2" Irrigation Meter/s = 8 ESU's - Fireline Meter/s = ESU's Total 37 ESU's ~ $650.00 ea = $24.050.00 100% due prior to Council approval of final plat. Cit~ Wast~ter ~ct ~ 29 - 5/8' x 3/4" D~estic Meter/s = 29 ESU's ~ $450.00 = ~ 100% due prior to Council approval of final plat. Water Tap Ins~i~ F~ 30 Connections ~ $100.00 each = $3,000.00 100% due prior to issuance of building pe~it. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Ta~Inspe~tion Fee 29 Connections ~ $I00.00 each = $2,900.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note= This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will b® assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 29 Residential Lots at $150.00 each = $4,350.00 N/A Units (Multi familY) at $75.00 each = $ N/A 50% of the amount specified above shall be paid bythe Developer~ prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLPImp cc= Steven G. Goram, Director of Public Works DEVELFEE . HLP STREET SIGN ASSESSMENT for Chautauqua Place The following assessment is being made in accordance with the City of Coppell SubdiviSion Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $ 53.10 Speed L;mit $ 63.54 2 $ 127.08 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 ' Stop & Street Combo $ 96.85 3 $ 290.5~ TOTAL $ 417.63 * Cost breakdowns may be obtained from Public Works bywritten request. Revised 4/1/91