Loading...
Chautauqua-CS 920109 (2) P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 January 9, 1992 Mr. Mike Daniel, P.E. Nathan D. Maier Three Northpark/8800 N. Central Expressway, Ste. 300 Dallas, TX 75231 Re: Chautauqua Place Dear Mr. Daniel: · I have reviewed the referenced plans and have the following comments to offer: .- Cover Sheet: i) The three paragraph plan approval note (copy attached) should be added. 2) The standard details should be added. 3) Landscaping and irrigation plans and details should be provided. Plat: 1) The 15' water easement between Lots 14 and 15, Blk A should be changed to a 16' water easement. 2) There is about a 20' offset in right of way in Harris Street between this plat and the plat to the south. Plans for Harris Street and Bethel School Road should be provided to ensure that the proper right of way is dedicated off of Lot 1, Blk A and that the location of proposed Bethel School Road will align with existing Bethel School Road to the east. Sheet 1: 1) All sheets should be sealed. Sheet 2: 1) The plan view should show the removal of the existing driveway on Harris Street. Sheet 3: 1) An offsite drainage easement should be provided for the outfall of the 48" RCP. This system should also be coordinated with the Harris Street/Bethel School Road improvements. Please respond as to the anticipated timing on that project. Depending on the timing, the proposed system may need to be extended at this time to the existing drainage channel. Letter to Mr. Daniel, P.E. January 9, 1992 Page 2 2) The drainage area map shows the portion of the Kaye Street right of way north of Lots 19 and 20, Blk A draining to the west. However, the natural flow of the water, based on the contours, is south between Lots 19 and 20, Blk A. You should show a grade to drain along the north side .of this subdivision so that this water will flow to the 36" RCP. Sheet 4: 1) See note No. 2 above about showing a grade to drain. Sheet 5: 1) Show the proposed street header for Bethel School Road and ensure that the 12" valve is not located in the street header. 2) Show the type of pipe and embedment in the profile view. 3) The proposed 8' waterline between Lots 14 and 15, Blk A should be extended westward to tie into the existing 8' waterline in Kaye Street. This will provide a second source of water to Chautauqua and loop the existing system. 4) You should show concrete encasement around the drop manhole at Station 3+42.57 Line 'A'. Sheet 6: 1) The lot grading plan is inconsistent with your drainage area map. You should either revise it or your drainage area map and calculations so that the two are consistent. 2) It appears from your lot grading plan that Lots 5, 6, and 7, Blk A are being filled and therefore, the tots that face on Brooks Lane may not drain. Please reevaluate the lot grading plan in this area. Also, as per City Ordinance No. 91514 entitled 'Erosion and Sedimentation Control Code", an erosion and sedimentation control plan shall be included in the engineering construction plans. I have enclosed a copy of the ordinance for your information. I am providing the marked-up plans along with this letter. Once all the changes have been addressed, please return the marked-up plans along with the revised plans. If you should have any questions or concerns, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer