Loading...
Cici's Addition-CS 991104BULLARD CONSTRUCTION INC. RO. Box 575 · Addison, Texas 75001 - (972) 661-8474 · FAX (972) 661 ~8985 November 4, 1999 Mr. Larry Davis, Construction Inspector City of Coppell Post Office Box 478 Coppell, Texas 75019-4409 Re: Clarification and City Mandated Changes B5323 Dear Mr. Davis: In response to our onsite meetings of October 18th and October 28th , 1999, the following changes have been made: ao I have directed the utility contractor to move the water and landscape meter cans currently located at the west approach in the R.O.W. easement, to the east side of the vault to minimize the impact of the R.O.W. easement. It is my understanding that the vault may be left in its current location, approximately 3 feet into the R.O.W. easement. I will have civil engineering resubmit plans reflecting the vault's current location. bo Civil Engineering shall resubmit a new grading and drainage plan regarding the east and west approaches which reflects our discussions and your verbal direction. I appreciate your willingness to work with us on these matters. Sincerely yours, BULI..ARD CONSTRUCTION, INC. Chris Perry Project Superintendent CP/cg Michael Martin, City of Coppell Chris Jones, Pacheco-Koch Jorge Gonzales, Corgan & Associates Paul Brown, DukeNVeeks Bob Kulick, JMC