WA9601-CS 970423 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF. P.E. JOE n. CANTER, P.E. April 23, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Tank Engineering Services Agreement Modifications Dear Mr. Griffin: As you requested, we are pleased to submit revision to our Engineering Services Agreement with the City of Coppeli for the Wagon Wheel Ranch Elevated Storage Tank project, dated July 23, 1996. This revision modifies the scope of our engineering services as follows: EXItlBIT "B' SPECIAL SERVICES PHASE I: 2.0 MG COMPOSITE ELEVATED TANK Additional engineering services related to the design of Northpoint Drive Extension and the Material Storage Bins 1. Design and preparation of construction plans and specification for the extension of Northpoint Drive from its current termination at the noahwest comer of the Wagon Wheel Ranch property to the eastern limits of the proposed tank site. 2. Preparation of the necessary plat and field note descriptions for additional right-of-way requiremehts associated with the extension of Northpoint Drive. 3. Design and preparation of the necessary details for the structural components of the proposed materials storage bin exterior wall at the elevated tank site and Our original scope of services included layout of the tank site with consideration of future storage bins, but did not anticipate including the construction of the bins with the tank project. We propose these services be appended to the Phase I Special Services as shown of Exhibit "B" of the original Engineering Services Contract. It is our opinion that the probable construction cost for the Northpoint Drive extension is in the range of $70,000. Our opinion of probable construction cost of the material storage bin exterior wall and interior pavement surfaces is approximately $65,000. This opinion of cost is based on the preliminary layout of the tank site which shows the configuration of the material storage bins and the extension of Northpoint Drive as Mr. Kenneth M. Griffin, P.E. City of Coppell April 23, 1997 Page No. 2 previously considered and accepted by the City. We are enclosing an itemized copy of our opinion of construction cost for your review. For the additional services outlined above, we propose to increase our Special Services compensated by $8,000, making the revised lump sum amount for Special Services $68,000. We recommend Exhibit "F" of the original agreement be modified as below to reflect this change. EXItlBIT "F" PAYMENT SCHEDULE FOR SPECIAL SERVICES Phase h Special Services Original Revised Description Contract Amount Contract Amount Weekly Site Visits $12,000 $12,000 Daily Steel Erection and Welding Inspection 18,000 18,000 Daily Blast and Paint Inspection 12,000 12,000 Materials Testing and Quality Control 13,000 14,500 Architectural Services for Tank Entry Feature Enhancements 5,000 5,000 Northpoint Drive Extension 0 3,000 Material Storage Bins Exterior Wall Design 0 3,500 Total Special Services -Phase I: $60,000 $68,000 If you are in agreement with the revised scope of engineering services and compensation amount, please have one copy of this Engineering Services Agreement Amendment executed for the City of Coppeil and returned to our office. Of course if you desire, rather than revising our existing agreement we will be happy to issue a new Engineering Services Agreement which incorporates these changes and which will supersede our original agreement dated July23, 1996. We appreciate the opportunity to provide continued engineering services to the City of Coppell and are available to discuss this proposal further at your convenience. Sincerely yours, Gary C. Hendricks, P.E. ACCE D FOR THE CITY OF COPPELL J :'~¢oppellX,5 15~lgreem~t~,landy-lk%llne~d. dec SHIMEK, JACOBS & FINKLEA, L.L.P. ProjectNo. 96149 CONSULTING ENGINEERS Client: City of Coppell, Texas Page No. I of 1 Project: Wagon Wheel Ranch Elevated Storage Tank Date: 04/23/97 Northpoint Drive Extension and Material Storage Bins By: GCH ENGINEER'S OPINION OF CONSTRUCTION COST Item No. I Description I QuantityI Unit I Price I Amount NorthPoint Drive Extension 1 Unclassified Excavation 700 CY $2.50 $1,750.00 2 6" Lime Stabilized Subgrade 2,050 SY $1.90 $3,895.00 3 Hydrated Lime 28 Tons $110.00 $3,080.00 4 6" reinforced concrete pavement 1,967 SY $23.00 $45,241.00 5 Concrete Street Header 64 LF $10.00 $640.00 6 Transverse Butt Joint 50 LF $12.00 $600.00 7 6" monolithic concrete curb 1,260 LF $2.50 $3,150.00 Contingencies 15.0% $8,753.40 SubtotaI-Northpoint Drive Extension: $67,109.40 USE: $70~000.00 Material Storage Bin Wall and Pavement 1 6" Lime Treated Subgrade 1250 S.Y. $1.90 $2,375.00 2 Hydrated Lime 18 Ton $110.00 $1,980.00 3 8" Reinforce Concrete Pavement 1212 S.Y. $25.00 $30,300.00 4 Buired Railroad Rails 720 L.F. $10.00 $7,200.00 5 Structural Exterior Wall 2736 S.F. $4.50 $12,312.00 6 Contingencies 15.0% $8,125.05 Subtotal -- Structural Material ~Storage Bin Exterioj Wall & Paving: $62,292.05 USE: $65,000.00 Total Additional (Northpoint + Material Storage): $135,000.00 i:~Forms'~_.stiraate~,ng-Est.wk4