Loading...
WA9601-CS 970131SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Phone: (214) 361-7900 FAX: (214) 361-0204 02-03-97 P01:.57 Subject: City of Coppell Sandy Lake Road Water Line Memorandum To: File /~ / From: Gary Hendricks f'//' / ~ ' Date: January 31, 1997 I spoke with Mike Martin at the City of Coppeli today concerning the future R.O.W. requirements of Sandy Lake Road, From Demon Tap Road to Royal Lane. We requested this information so that we could prepare our schematic alignment of the proposed Sandy Lake Road Water Line. He provided me with the following guidelines: From To R.O.W. Pavement Comments Width Section Sandy Lake Road Demon Tap Rd. West of Summer 90 - Ft. 4 Lane All future dedication Place Dr. Divided from the south side Sandy Lake Road W. of Summer P1. Coppel Rd (north) 90 -Ft. 4 Lane future dedications Divided from both sides Sandy Lake Road Coppel Rd (north) State Road 90 Ft. 4 Lane All future dedication Divided from the south side Sandy Lake Road State Road Hwy. 121 110 - Ft. 6 Lane **All future Divided dedication from the south side ** Only if necessary to avoid existing T.U. Electric Transmission Poles The attached memo from the City outlines the geometrics of the pavement sections required. ID1/31/97 ~.0:5:L CITY OF COPPELL ENGINEERZNG ~ 214 ~61, 1~2E]4 NO. 147 P.O. BOX 47E~ The City With A Beautiful Future COPPE:LL, TX 75019 FAX NO. (972) :5~4-357(3 ENC_fNEERZNG DEPARTMENT FAX C 0 VER SHEET FIR],& _, _T l"' PHONE: NO · TRANSM['1'TI~D -BY' TIME:: FIU':MI]ER OF' PAGES (INCLUDING COVER SHE;]~T) J IF 'YOU DO NOT RECEIVE ALL Of THE BY DE'SIGN ~ PA(.';E:S, PLEASE CALL (972) 304-5679. ~ SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE n. CANTER, P.E. January 23, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Tank Geotechnical Investigation Dear Mr. Griffin: We have completed the geotechnical investigation of the Wagon Wheel Tank Elevated Storage Tank Site and are enclosing three copies of the report for your files. Henley Johnston & Associates, Inc. assisted us in this aspect of the project. The report indicates this site is suitable for construction of the proposed 2 million gallon elevated tank if proper foundations are constructed. In general, the tank contractor must either construct straight-walled concrete piers which extend at least 2-feet into the light gray unweathered sandstone at a depth of approximately 50 feet, or construct drilled and underreamed piers based in the hard silty, sandy clays at a depth of approximately 20 feet. The pier underream diameters are recommended not to exceed 8-feet in diameter. The report suggest that the floor slab and grade beams can be constructed directly on the soil surface due to expected dead loads exceeding anticipated swell pressures. Other recommendations are presented in the report relative to paving, drainage and earthwork requirements. We are incorporating these recommendations into our final design of the site. We will bind a copy of the complete report into the project specifications and bidding documents for the contractor's use. We are available to discuss this project further at your convemet / Enclosure