Loading...
Castlebury-CS 990812August 12, 1999 P.O. Box 478 Coppell, Texas 75019 972-462-0022 ILE Mark Gaines Ryland Homes Three Metro Square 12200 Ford Road, Suite 400 Dallas, Texas 75234 Castlebury Court f Final Acceptance Dear Mark Gaines: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Cons~ ~ction In~ector cc: Bill Jones, Jr., Site Concrete David Gregory, Goodwin & Marshall Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Sones, Chief Building Official Travis Crump, Fire Marshal Procker/subdivsn/Olfmals/castlbry