Old Town 1RB-CS130130 Lo--- -Pi Nz2
DEVELOPMENT FEE TABLE
Project: Old Town Addition Lot IR Block B
Date: 1/30/2013
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $0.00
(100%due at Issuance of Building Permit)
Water Tap Inspection Fee $0.00
(100%due at Issuance of Water Meter)
Water Meter Fee(Domestic) $299.25
(100%due at Issuance of Water Meter)
Water Meter Fee(Irrigation/Fireline) $299.25
(100%due at Issuance of Water Meter)
Water Meter Deposit(Domestic) $30.00
(100%due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100%due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100%due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100%due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100%due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100%due prior to Filing Plat)
Street Light Fee $0.00
(100%due prior to Acceptance of Project)
Street Sign Fee $0.00
(100%due prior to Acceptance of Project)
Construction Inspection Fee $0.00
(100%due prior to Start of Construction)
TOTAL $658.50
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00
Fees waived per development agreement:
Water Impact Fee $3,006.00
Water Tap Inspection Fee $100.00
Wastewater Impact Fee $1,503.00
Wastewater Tap Inspection Fee $50.00
Utility Final Inspection Fee $50.00
Park Fee $0.00
Roadway Impact Fee $6,229.48
Total Fee Waiver $10,938.48
DEVELOPMENT FEE WORKSHEET
PROJECT: Old Town Addition Lot 1R Block B
DATE: 1/30/2013
Water Impact Fee:
Domestic Meter(s): 1 - 1 inch = 1.67 ESU's
Irrigation Meter(s): 1 - 1 inch = 1.67 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total#: 3.34 ESU's @ $900.00 ea. $3,00000
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total#: 2 Connections @ $50.00 ea. $1-0090
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total#: 1 Domestic Meter(s) @ $299.25 $299.25
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total#: 1 Irrigation Meter(s) @ $299.25 $299.25
Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total#: 0 Fireline Meter(s) @ $0.00 meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total#: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 1.67 @ $900.00 ea. $1,503.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total#: 1 Connections @ $50.00 ea. $5000
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total#: 1 Lots @ $50.00 ea. $5000
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0.00 per lot $0
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Old Town Addition Lot 1R Block B
DATE: 1/30/2013
ROADWAY IMPACT FEE:
Service Area * 1
Category** Retail/Commercial
Land Use** Restaurant
Building Area(sf) 3,574
Development Units** 3.57
Vehicle Miles per Development Unit** 11.62
Fee per Vehicle Mile*** $150
Roadway Impact Fee due=(Development Units)x
(Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $6,229.48
* (Figure 4.1 -Roadway Impact Fee Study)
**(Table 4.10-Roadway Impact Fee Study)
***(Schedule 2,Page 3 -The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 100%
Total Credit $6,229.48
.....................................................
** Credit applied per Development Agreement