Loading...
Old Town 1RB-CS130130 Lo--- -Pi Nz2 DEVELOPMENT FEE TABLE Project: Old Town Addition Lot IR Block B Date: 1/30/2013 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (100%due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100%due at Issuance of Water Meter) Water Meter Fee(Domestic) $299.25 (100%due at Issuance of Water Meter) Water Meter Fee(Irrigation/Fireline) $299.25 (100%due at Issuance of Water Meter) Water Meter Deposit(Domestic) $30.00 (100%due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100%due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100%due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100%due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100%due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100%due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100%due prior to Filing Plat) Street Light Fee $0.00 (100%due prior to Acceptance of Project) Street Sign Fee $0.00 (100%due prior to Acceptance of Project) Construction Inspection Fee $0.00 (100%due prior to Start of Construction) TOTAL $658.50 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 Fees waived per development agreement: Water Impact Fee $3,006.00 Water Tap Inspection Fee $100.00 Wastewater Impact Fee $1,503.00 Wastewater Tap Inspection Fee $50.00 Utility Final Inspection Fee $50.00 Park Fee $0.00 Roadway Impact Fee $6,229.48 Total Fee Waiver $10,938.48 DEVELOPMENT FEE WORKSHEET PROJECT: Old Town Addition Lot 1R Block B DATE: 1/30/2013 Water Impact Fee: Domestic Meter(s): 1 - 1 inch = 1.67 ESU's Irrigation Meter(s): 1 - 1 inch = 1.67 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total#: 3.34 ESU's @ $900.00 ea. $3,00000 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 2 Connections @ $50.00 ea. $1-0090 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 1 Domestic Meter(s) @ $299.25 $299.25 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total#: 1 Irrigation Meter(s) @ $299.25 $299.25 Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total#: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 1.67 @ $900.00 ea. $1,503.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 1 Connections @ $50.00 ea. $5000 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total#: 1 Lots @ $50.00 ea. $5000 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Old Town Addition Lot 1R Block B DATE: 1/30/2013 ROADWAY IMPACT FEE: Service Area * 1 Category** Retail/Commercial Land Use** Restaurant Building Area(sf) 3,574 Development Units** 3.57 Vehicle Miles per Development Unit** 11.62 Fee per Vehicle Mile*** $150 Roadway Impact Fee due=(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $6,229.48 * (Figure 4.1 -Roadway Impact Fee Study) **(Table 4.10-Roadway Impact Fee Study) ***(Schedule 2,Page 3 -The Master Fee Schedule) Percent of Credit Toward Roadway Impact Fees 100% Total Credit $6,229.48 ..................................................... ** Credit applied per Development Agreement