Castlebury-CS 990528The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 75019
P.O. Box 478
Coppell, Texas 75019
972-462-0022
May 28, 1999
Daniel M. Goodwin, P.E.
Goodwin & Marshall, Inc.
6001 Bridge Street, #100
Fort Worth, TX 76112
FILE
RE: Street Sign Fee Assessment / Castlebury Court
Dear Mr. Goodwin:
Enclosed with this letter you will fmd the street sign assessment for Castlebury Court. Prior to the
final acceptance of this project, a check in the amount of $275.74 should be made payable to the City
of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of the attached
street sign fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment of
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
CC:
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell P.E., Asst. Dir. of Public Works
Devlpfee/csdbsgn
DA TE:
TO:
FROM:
RE:
COPPELL ENGINEERING
MEMORANDUM
Doug Stevens, Engineering Technician
Per Bird&all, Sign / Signal Technician
Street Division Sign Fee For ~L~ ~)U I~.~ C..~"("
The following fee should be assessed and collected on the above referenced project. 100% due
prior to final acceptance of project.
Street Sic~ns Fee
The fo/lowing assessment is being made in accordance with the City of Coppell Subdivision
Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are
based on current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE (~UANTITY
No Parking $54.03
SFccd Umit $58.99 ~
Street Names $111.90
Yield w/names $125. 78
Stop w/names $144.29 t
Warning Sign $73.46 }
Keep Right(median) $58.99
Object Markers(L&R) $39.98
0 THER
EX'I'ENDED PRICE
* cost breakdowns may be obtained by written request
signfee
TOTAL
Revised 3/24/99