Loading...
Vista Ridge 1R-8 D-CS130131 (2) CITY OF COPPELL PAYMENT AUTHORIZATION MEMO Vendor#: 6742 Date: January 24, 2013 Pay To: JDB Coppell Village Plaza-Commercial, LP Address: 434 Copperstone TrI City: Coppell State: TX Zip Code: 75019 Charge To: (Fund-Dept-Division-Expense Code) Amount: 4-1illigaglit Hi/ 171, 00 ACCOUNTING USE ONLY Description: Water line pro rata payment Approved for payment by: CoPPEL1. Invoice Date: to cover Lots *3 & 4 ( ER). This is the final payment to developer. Invoice#: Approval: , `,J, (''ease prin form and sign) - 1-01'c I-7 / (4)-47%.1 , Prorate Land Area Offsite Area, Area (acres) ____iacres2___ Lot 1BR, Block D Vista Ridge Lots 1-7 Block A Vista Ridge Retail , 14.824 7.775+ 14.824=22.599=Total Area Percent of Total Land Area 66% 34% • Since offsite area is a greater percentage than the onsite/offsite cost split, all offsite cost will be prorated againstLots 1-7 Block A Vista Ridge Retail. Therfore, the total cost to prorate to Lots 1-7 is$93,362 Vista Ridge Retail . _ Area %of Total Area Prorata Cost (acres) Lot 1 1.029 7.11% $6,480.67 / WIM 1.054 7.11%% �It C.0 O� Lot 3 0.914 6.17% $5,756.40 Ga Lot 4 0.861 5.81% $5,422.60 pi�� Sri Lot 5 1.188 8.01%% $7,482.06 Lot 6 6.891 46.49% $43,399.73 Lot 7 2.887 19.48% $18,182.41 AO-- "" Total Area 14.824 100.00% /IL Total Prorated Cost $93,362.00 Created 8/6/2007 Printed 8/6/2007