Cambridge Phase 1-LR 950206 GEOTECHNICAL
ENGINEERING GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620o9791 * Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: February 6, 1995 Date Concrete Placed: January 9, 1995 Standard 6"x12'
Client: Beamer Development Corporation A~a 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Coactete ReponNo.: 40
Contractor: Site Concrete
Concrete Supplier and Plant: Andrews Gunite Inc.
Location of Placement: Channel @ N. End of Pond
MATERIALS ~, ~D ~t~w~. INSPECTION DATA
Descri~ioe .'.'Lbe.-CuYdl
Mix Number: Time Sample Batchcd:
Cement: 6 sack (1 part cement) Time Sampled:
Fly Ash: Sample Location:
Track/Tic ket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range:
Fine Aggregate: 4% pans sand Concrete Range: 51 °F
Admixtures: Slump Range (inches):
W~ather Conditions: Sunny
! Time Started: 8:45 am
2 Tin~ Completed: 10:00 am
Added Water: Sample Air Content (~):
Total Cubic Yards Placed:
Required Str*ngth (Lbs./sq.in.): 3,000
Spe. clmma Measured Age Da~e To, al Lead Comp~:ssi,¢ Strength R~r~
ECM 137 7 01/16/95 113,660 4,160 Diameter sample 5.90 in.
ECM 138 28 02/06/95 131,900 4,610 6.03 in.
ECM 139 28 02/06/95 185,420 6,040 6.25 in.
T~ ~.Ic~ ['~[i~ Fm~ R~g~ar
A~M C-31.C-39.C-14~ ~s ~ ok~.~} Cylinders Made By: Contractor
Remarks and/or Distdbmion:
Bill Anderson - Dowdy, Anderson and Associates. Inc.
~' Davis - City of Coppell
g~ ~nsu~n~s, Inc. Reviewed by: '~~'
All ler'.e~ and ~.ports an: fca' the exclusive use of the cl~nl ~ whom they am add~sed and shall no~ b~ r~produced without th~ ~ull appr~.'ai of GEE Conauhants. Inc. Th* ~ of out ~ mt~t rv. ccivc
,out prior written al~eoval. Om' I~:ttem and ea.~:n~ .a.p~b' otd¥ to ~,~ ~ampl* ,.~eltd. a~Uot Lnal:~.oed and a~: no~ .n~eaaarily [nd. icativ~ of One quantities of alrgar~ntly identical or similar groduc~s.