Loading...
Cambridge Phase 1-LR 950206 GEOTECHNICAL ENGINEERING GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620o9791 * Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: February 6, 1995 Date Concrete Placed: January 9, 1995 Standard 6"x12' Client: Beamer Development Corporation A~a 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Coactete ReponNo.: 40 Contractor: Site Concrete Concrete Supplier and Plant: Andrews Gunite Inc. Location of Placement: Channel @ N. End of Pond MATERIALS ~, ~D ~t~w~. INSPECTION DATA Descri~ioe .'.'Lbe.-CuYdl Mix Number: Time Sample Batchcd: Cement: 6 sack (1 part cement) Time Sampled: Fly Ash: Sample Location: Track/Tic ket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: 4% pans sand Concrete Range: 51 °F Admixtures: Slump Range (inches): W~ather Conditions: Sunny ! Time Started: 8:45 am 2 Tin~ Completed: 10:00 am Added Water: Sample Air Content (~): Total Cubic Yards Placed: Required Str*ngth (Lbs./sq.in.): 3,000 Spe. clmma Measured Age Da~e To, al Lead Comp~:ssi,¢ Strength R~r~ ECM 137 7 01/16/95 113,660 4,160 Diameter sample 5.90 in. ECM 138 28 02/06/95 131,900 4,610 6.03 in. ECM 139 28 02/06/95 185,420 6,040 6.25 in. T~ ~.Ic~ ['~[i~ Fm~ R~g~ar A~M C-31.C-39.C-14~ ~s ~ ok~.~} Cylinders Made By: Contractor Remarks and/or Distdbmion: Bill Anderson - Dowdy, Anderson and Associates. Inc. ~' Davis - City of Coppell g~ ~nsu~n~s, Inc. Reviewed by: '~~' All ler'.e~ and ~.ports an: fca' the exclusive use of the cl~nl ~ whom they am add~sed and shall no~ b~ r~produced without th~ ~ull appr~.'ai of GEE Conauhants. Inc. Th* ~ of out ~ mt~t rv. ccivc ,out prior written al~eoval. Om' I~:ttem and ea.~:n~ .a.p~b' otd¥ to ~,~ ~ampl* ,.~eltd. a~Uot Lnal:~.oed and a~: no~ .n~eaaarily [nd. icativ~ of One quantities of alrgar~ntly identical or similar groduc~s.