Loading...
Cambridge Phase 1-LR 950118I G E GEE Consultants, Inc. E NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Repoa Date: January 18, 1995 Date Concrete Placed: January 9, 1995 Standard 6'x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Conerete ReportNo.: 40 Contractor: Site Concrete Concrete Supplier and Plant: Andrews Gunite Inc. Location of Placement: Channel @ N. End of Pond MATERIALS s~, s~0 ~.,~, w~. INSPECTION DATA Descri~k:,v, ~L~. CuYd) Mix Number: Time Sample Batched: Cemem: 6 sack (1 part cement) Time Sampled: Fly Ash: Sample Location: Tmck,'Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 42°F Fine Aggregate: 4k%. parts sand Concrete Range: 51 °F Admixtures: Slump Range (inches): Weather Conditions: Sunny I Time Started: 8:45 am 2 Time Completed: 10:00 am Added Water: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 3,000 S~n Measuv'-~l Age Dam Total L'..'ad Cow. p.ms$ivc Stmng'..h ECM 137 7 01/16/95 113,660 4,160 Diameter sample 5.90 in. ECM 138 28 02/06/95 6.03 in. ECM 139 28 02/06/95 - 6.25 Test Mcthc~ Utilized I:ra¢*,um Regular ASTM C-31,C-39.C-143 (Unless ,';o~ O'~r~-~} Cylinders Made By: Contractor Remarks and/or Distribution: Bill Anderson - Do,.vdy. Anderson and Associates, Inc. Lan')' Davis - City of Coppell GEE ~ollsul~;ants, I~lc. Reviewed by: Alt ~ctte~ and rq:~-~,.~ am for th~ cxc.~a$ix~: use of ~ client :o ~,'nom Lhey am addn~s~l and shail vax be rcprod'ao~d ~.?.hout ,.he 5all appro'.'aI of GEE Comultancs. Inc. 'E-s: ~ of oar na.,r~ our prior ,~,rittm'. apprc,..al. Our let:ers and ,mpor',s apply cal}- lo ~ ~.ampk: :eat~l and 'or ins.ccc'ted and itc .not neo:~sari, ly L, xtieatiYe of '.h: quamili~ of apparenliy ~dentic-al er s:.milar ~roduc,.~.