Cambridge Phase 1-LR 941201G EOTECHNICAL
E NGINEERLNG GEE Consultants, Inc.
E INVIRONMENTAL
2540 Glenda Lane * Suite 108 · Dallas. Texas 75229 · (214'~ 620-9791 · Fax (214! 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: December 1, 1994 Date Concrete Placed:. November 2, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 39
Contractor: Site Concrete
Concrete Supplier and Planl: Pioneer Plant #22
Location of Placement: Cambridge Manor Lane
~,~... sso..,~ w,~. INSPECTION DATA
MAT ER I AL S
Mix Number: 0464 Time Sample Batched: l 1:46 am
Cement: 6 sack Time Sampled: 12:22 pm
Sample Location: Station 14+20
Fly Ash: Truck;q'ickct No: 3351295136
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 74°F
Fine Aggregate: Concrete Range: 73°F
Slump Range (inches): 7.5
Admixtures: Weather Conditions: Cloudy
I Time Started: 11:40 am
2 Time Completed: 1:10 pm
Added Water: Sample Air Content (%): N;A
Total Cubic Yards Placed: 10 CY
Required Strength (Lbs.:sq.in.): 3.000
Specimen Measu.nx! Age Date To'.al Load Ccm,..~r~siv¢ Slmng'.h Remarks
Number Slump :in.e :Da.~sl Tested ,Lbs.~ ;I.b~. Sa. Ln.J
ECM 133 7½ 7 11/09/94 107,360 3,800
ECM 134 7½ 7 11/09/94 102,080 3,610
ECM 135 7½ 28 11/30/94 125,920 4,450
ECM 136 7½ 28 11/30/94 123,220 4,360
Tes: Mc~-,ods t'tiiizcd Fracture Regular Cylinders Made Bx': G. H.
.a. WFM C-31.C-39.C-143 itnlcss Noted O'A~,-~-:s¢i ' '
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppell
GEE Consultants, Inc. Reviewed by: ~
Ali letters and . .--eporcn am for u~ exclmi~ ~ of th* c:.i~nt '.o ~.hom t,h~y are add.~ss~d and shall ~ ha: *=g-rcdw.~d .a. itlmut ti~ flail approval of GEE Ccxnsulmtn, Lac. Th: ~ or cut n,an~
our gtS. or ~.ri:ten apg. royal. Out kt~v$ and rep,>_rt.* apl:l) only. :o ~ sample '~esi~i and or kn~l~,'t~ ~ am. not ..ae.c~.,arily :.,~licati~ of ..he quant.;tks o£ a.vparen:ly [d~ntlc~l o, similar