Loading...
Cambridge Phase 1-LR 941129 (2)G EOTECHNICAL E GEE Consultants, Inc. F 2540 Glenda Lane · Suite 10g · Dallas, lexas 75229 · (214) 620-9791 · [ax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 29, 1994 Date Concrete Placed: October 28, 1994 Standard 6'x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Conerete Rcpo~No.: 37 Contractor: Gr i f f ith Construct ion Concrete Supplier and Plant: Lattimore Plant #3 Location of Placement: Storm Drainage Curb MATERIALS ~-~, ~v ..,~ w~. INSPECTION DATA D~scd~.ion (Lb. CuYd} Mix Number: 38 Time Sample Batched: 3:32 pm Cement: 5.0 sk Time Sampled: 4:1.5 pm Sample Location: King Canyon, S. side. £. end Fly Ash: Truck,Ticket No: 311/3007384 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 640F Fine Aggregate: Concrete Range: 74°F Admixtures: Slump Range (inches): Weather Conditions: Clear I ,4~E Time Started: 3:45 pm 2 Time Completed: 5:00 pm Added Water: None Sample Air Content (%): N/A Total Cubic Yards Placed: 8 CY Required Strength (Lbs./sq.in.): 3,000 Sgeclm~n Meazun~i Ag~ D~t~ To~al Load C~m~i~ St~ ~r~ N~r SI~ ~.~ ~ys) T~ (L~.; (L~.-'~.~.I ECM 127 3" 7 11/05/94 137,420 4,860 Broke on 11/7/94 ECM 128 3" 28 11/25/94 163,420 5,780 ECM 129 3" 28 11/25/94 168,180 5,950 A~M C-21.C-39.C-[~3 ~t'~ess Nc~ O~'~, Cylinders Made By: V. S. Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates. Inc. ~' Davis - City of Coppe[l G~ ~nsult~ts, Inc. Reviewed by: ~ AIl !errors and r~ports am for ~ excluai~ u~ of '.h~ clk. m :o v..hom ',h~y at~ ~ ~ s~ ~ ~ ~ ~ ~ ~1 a~-al of G~ C~ul~. ~. TF~ u~ of ou~ name must . ;. prior wriucn approval. Out Iol~rs and mpor~ apply only :o lh~ sahib, t~as~xl ar~L'o~ ';nspcc..~d and am ~ re. co~ari]y indicativo of Ih~ quamitics of apI~m'taly identical or similar