Cambridge Phase 1-LR 941129 (2)G EOTECHNICAL
E GEE Consultants, Inc.
F
2540 Glenda Lane · Suite 10g · Dallas, lexas 75229 · (214) 620-9791 · [ax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 29, 1994 Date Concrete Placed: October 28, 1994 Standard 6'x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Conerete Rcpo~No.: 37
Contractor: Gr i f f ith Construct ion
Concrete Supplier and Plant: Lattimore Plant #3
Location of Placement: Storm Drainage Curb
MATERIALS ~-~, ~v ..,~ w~. INSPECTION DATA
D~scd~.ion (Lb. CuYd}
Mix Number: 38 Time Sample Batched: 3:32 pm
Cement: 5.0 sk Time Sampled: 4:1.5 pm
Sample Location: King Canyon, S. side. £. end
Fly Ash: Truck,Ticket No: 311/3007384
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 640F
Fine Aggregate: Concrete Range: 74°F
Admixtures: Slump Range (inches):
Weather Conditions: Clear
I ,4~E Time Started: 3:45 pm
2 Time Completed: 5:00 pm
Added Water: None Sample Air Content (%): N/A
Total Cubic Yards Placed: 8 CY
Required Strength (Lbs./sq.in.): 3,000
Sgeclm~n Meazun~i Ag~ D~t~ To~al Load C~m~i~ St~ ~r~
N~r SI~ ~.~ ~ys) T~ (L~.; (L~.-'~.~.I
ECM 127 3" 7 11/05/94 137,420 4,860 Broke on 11/7/94
ECM 128 3" 28 11/25/94 163,420 5,780
ECM 129 3" 28 11/25/94 168,180 5,950
A~M C-21.C-39.C-[~3 ~t'~ess Nc~ O~'~, Cylinders Made By: V. S.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates. Inc.
~' Davis - City of Coppe[l
G~ ~nsult~ts, Inc. Reviewed by: ~
AIl !errors and r~ports am for ~ excluai~ u~ of '.h~ clk. m :o v..hom ',h~y at~ ~ ~ s~ ~ ~ ~ ~ ~ ~1 a~-al of G~ C~ul~. ~. TF~ u~ of ou~ name must . ;.
prior wriucn approval. Out Iol~rs and mpor~ apply only :o lh~ sahib, t~as~xl ar~L'o~ ';nspcc..~d and am ~ re. co~ari]y indicativo of Ih~ quamitics of apI~m'taly identical or similar