Loading...
Cambridge Phase 1-LR 941129 (3) G EOTECHNICAL E GEE Consultants, inc. 2540 Glenda Lane · Suite 10g · Dallas, Texas 7522~ · (214) 620-9791 · [ax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 29, 1994 Date Concrete Placed: October 31, 1994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 38 Contractor: Gr if f ith Construct ion Concrete Supplier and Plant: Lattimore PlaP. t #7 Location of Placement: Storm Sewer Drain ~., go a.,~w~. INSPECTION DATA MATERIAL S ~,,-,i~io. 0*.;c.v~ Mix Number: 38 Time Sample Batched: 1:45 pm Cement: Time Sampled: 2:15 pm Sample Location: By Cambridge Manor Ln 75ft. Fly Ash: S. of Kings Canyon. west side Coarse Aggregate: Trucklricket No: 145i7005199 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 68°F Concrete Range: 70°F Admixtures: Slump Range (inches): 4' 1 W,'R Weather Conditions: Clear 2 Air Time Started: 2:00 pm Added Water: Time Completed: 3:25 pm Sample Air Content (%): N/A Total Cubic Yards Placed: 8 CY Required Strength (Lbs./sq.in.): 3,000 Sp~-'in~n M~asur~d Ay: Dam Total Load C~si~ St~ Rem~r~ ECS 130 4" 7 11/07/94 136,840 4,840 ECS 131 4" 28 11/28/94 162,060 5,730 ECS 132 4" 28 11/28/94 163,020 5,770 T~s, Me~ Ltii~ Fm~'m~ gag~af Cylinders Made By: V. S. ~M C-31 .C-39.C- 143 ~U~s No~ 0~'~1 R~marks and/or Distribution: cc: Bill Anderson - Dowdy. ~derson and Associates, Inc. ~rQ' Davis - City of Copp~ll All let,.ers and m~op, s am for th= gxclu~b,~e us~ of '2~ cli~m to v. hom they a~ ~kl.,~u~l ~d shall not N= mprod, uc~l without t.he '~11 ipprt~-~l of GEE Com,,l~ax~, Inc. Th~ us~ of our narr~ rnu~t receive our prior u,~tten appre,zal. Our k:,.t~ and repro'ts apply only to ',he sample w.~mcl argl.'or ;.nslmcted a.-gl am no~ m<r, ssatily hxlicatit~ of 6'~ quamili~ of appa~ntly id~mic~! or similar produc'.s.