Cambridge Phase 1-LR 941129 (3) G EOTECHNICAL
E GEE Consultants, inc.
2540 Glenda Lane · Suite 10g · Dallas, Texas 7522~ · (214) 620-9791 · [ax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 29, 1994 Date Concrete Placed: October 31, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 38
Contractor: Gr if f ith Construct ion
Concrete Supplier and Plant: Lattimore PlaP. t #7
Location of Placement: Storm Sewer Drain
~., go a.,~w~. INSPECTION DATA
MATERIAL S ~,,-,i~io. 0*.;c.v~
Mix Number: 38 Time Sample Batched: 1:45 pm
Cement: Time Sampled: 2:15 pm
Sample Location: By Cambridge Manor Ln 75ft.
Fly Ash: S. of Kings Canyon. west side
Coarse Aggregate: Trucklricket No: 145i7005199
Intermediate Aggregate: Temperature:
Fine Aggregate: Ambient Range: 68°F
Concrete Range: 70°F
Admixtures: Slump Range (inches): 4'
1 W,'R Weather Conditions: Clear
2 Air Time Started: 2:00 pm
Added Water: Time Completed: 3:25 pm
Sample Air Content (%): N/A
Total Cubic Yards Placed: 8 CY
Required Strength (Lbs./sq.in.): 3,000
Sp~-'in~n M~asur~d Ay: Dam Total Load C~si~ St~ Rem~r~
ECS 130 4" 7 11/07/94 136,840 4,840
ECS 131 4" 28 11/28/94 162,060 5,730
ECS 132 4" 28 11/28/94 163,020 5,770
T~s, Me~ Ltii~ Fm~'m~ gag~af Cylinders Made By: V. S.
~M C-31 .C-39.C- 143 ~U~s No~ 0~'~1
R~marks and/or Distribution:
cc: Bill Anderson - Dowdy. ~derson and Associates, Inc.
~rQ' Davis - City of Copp~ll
All let,.ers and m~op, s am for th= gxclu~b,~e us~ of '2~ cli~m to v. hom they a~ ~kl.,~u~l ~d shall not N= mprod, uc~l without t.he '~11 ipprt~-~l of GEE Com,,l~ax~, Inc. Th~ us~ of our narr~ rnu~t receive
our prior u,~tten appre,zal. Our k:,.t~ and repro'ts apply only to ',he sample w.~mcl argl.'or ;.nslmcted a.-gl am no~ m<r, ssatily hxlicatit~ of 6'~ quamili~ of appa~ntly id~mic~! or similar produc'.s.