Loading...
WA9601-CS 970121~ Arkak~s, Louisiana, Oklahoma, Southwest Region Headquarters U.S. Department lqew Mexico, md Texas Fort Worth, Texas 7619343530 of Trans portalion Telephcae: (817) 222-5534 Federal Aviation Administration January21, 1997 ~]-22-97 A~0:74 IN The City of Coppell Attn: Kenneth M. Griffin P. O. Box 478 Coppell, Texas 75019 Dear Mr. Gdffin: This is in response to your letter dated January 10, 1996, concerning: Aeronautical Study Number: 96-ASW-3281-OE Proponent: The City of Coppell Structure: Elevated Water Storage Tank Location : Coppell, Texas Latitude : 32° 58' 02.44" (NAD-83) Longitude: 97° 01' 25.02" Heights : 175 feet above ground level (AGL) 700 feet above mean sea level (AMSL) Once the water storage tank has been built, it will require increasing the Minimum Descent Altitude (MDA) of the LOCALIZER RUNWAY 17C STANDARD INSTRUMENT APPROACH PROCEDURE from 920 feet AMSL to 960 feet AMSL. A pilot flying this approach may descend no lower than the MDA unless he has visual sight of the runway in which case he may continue and land. The amendment to this approach will change the MDA [vertical movement of the aircraft] only. It will not require changing the flight path [horizontal movement of the aircraft] of this approach. This means that the amendment to this approach will be invisible to the residents of Coppell. I hope this has answered you question; however, if you do have any further questions, please do not hesitate to contact me at (817) 222-5536. Sincerely, Bruce C Beard Senior Obstruction Evaluation Specialist Air Traffic Operations Branch ~ Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 January 10, 1997 Bruce Beard Obstruction Evaluation Specialist Federal Aviation Administration, Southwest Region Air Traffic Operations Branch Fort Worth, Texas 76193-0530 RE: City of Coppeli Proposed Elevated Storage Tank (WA 96-01) FAA Aeronautical Study No. 96-ASW-3281-OE Dear Mr. Beard: We are in receipt of the Federal Aviation Administration, Acknowledgement of Notice of Proposed Construction or Alteration, dated January 2, 1997, for the pending construction of the City of Coppe!l's 2 million gallon elevated water storage tank (Aeronautical Study No. 96-ASW-3281-OE). We understand this Acknowledgement supersedes the one dated December 27, 1996. The Acknowledgment indicates that an additional notification (FAA Form 7460-2) will be required once actual construction of the elevated tank begins and again within five days after the construction reaches its greatest height. We understand once those forms are submitted, the FAA will make adjustments to the standard instrument approach at the Dallas/Ft. Worth International Airport. It's our understanding that those adjustments will involve vertical movement only, not horizontal. As flight patterns over the City of Coppell are of a particular concern and interest to the residents of the City, please provide a detailed written explanation of the changes that are anticipated by the FAA in the instrument approach patterns at D/FW Airport as a result of this project. Thank you for your help and I look forward to your response. If you should have any questions I can be reach at (972)304-3679. Assistant City Manager/City Engineer SHIMEK, JACOBS & FINKLEA, L.L.P. -- , : u '-- ~,.:~ L, ~: -i '/ i N CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. B1RKHOFF, P.E. IOE R. CANTER, P.E. January 8, 1997 GARY C. HENDRICKS, P.E. 1. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. x~ ~ C,~ b C) \ Assistm~t City Manager/City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank FAA Notification FAA Aeronautical Study No. 96-ASW-3281 -OE Dear Mr. Griffin: We have received a copy of the Federal Aviation Administration, Acknowledgment of Notice of Proposed Construction or Alteration, dated January 2, 1997. This Acknowledgment supersedes the one previously received by the City of Coppell and dated December 27, 1996. The FAA has determined the proposed tank site is identified as an obstruction under the Federal Aviation Regulations, Code 77, Subpart C, but would not be a hazard to air navigation. The City has been ask to complete FAA Form 7460-2, Notice of Actual Construction or Alteration, Parts 1 and 2. This form will be completed just prior to the start of construction and will used by the FAA to make the necessary adjustments to the standard instrument approach procedure currently in affect. In addition, the tank must be obstruction marked and lighted per FAA regulations. We have provided for obstruction lighting in the preliminary construction plans. Special painting or other marking is not required by the FAA. As you requested, we have visited with Mr. Bruce Beard, the FAA Obstruction Evaluation Specialist who issued the Acknowledgment. Bruce explained that the standard instrument approach procedure at Dallas/Ft. Worth International Airport will be modified in the vertical direction only as a result of this tank project. He anticipated no lateral adjustments of the instrument approach patterns. He will provide a more detailed written explanation at the City's request. We are enclosing a draft letter for your use in making this request. We are available to discuss this project further at your convenience. Sincer ur ~ Enclosure .... ~ 01-08-9'7 A09:23 IN N REPLY REFER TO Southwest Region AERONAUTICAL STUDY U.S. Department NO. 96-ASW-3281-OE of Transportation Air Traffic Operations Branch Fort Worth, Texas 76193-0530 LA) '~ ~ (~- O I Federal Aviation Ad m i n istratio n ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION i{ CITY OF COPPEEL CONSTRUCTION LOCATION ~ii ATTN KEN eKEFro !zi! COPPEEL, TX !O P O BOX 478 i:~i COPPELL TX 75019 LATITUDE J LONGITUDE 32o58'02.44" 97°0f25.02'' DEscn~Fnon ELEVATED WATER STORAGE TANK CONSTRUCTION PROPOSED 175 700 The Federal Aviation Administration hereby acknowledges receipt of notice dated November 18, 1996 conceming the proposed construction or alteration described above. A study has been conducted under the provisions of Part 77 of the Federal Aviation Regulations to determine whether the proposed construction would be an obstruction to air navigation, whether it should be marked and lighted to enhance safety in air navigation, and whether supplemental notice of start and completion of construction is required to permit timely charting and notification to airmen. The findings of that study are as follows. [] The proposed construction does not require notice to FAA. [] The proposed conetruotion is not identified as an obatruction under the standards of FAR, Part 77, Subpart C and would not be a hazard to air navigation. [] The proposed construction is identified as an obstruction under the standards of FAR, Part 77, Subpart C but would not be a hazard to air navigation. PROVIDED SPONSOR COMPLIANCE WITH CONDITIONS STATED ON PAGE 2 OF THIS DETERMINATION [] The structure should be obstruction marked and lighted per FAA Advisory Circular AC 70/7460-1, 'Obstruction Marking and Lighting,: Chapters 415113 (RED OBSTRUCTION LIGHTS ONLY I PAINTING NOT REQUIRED). [] Supplemental notice is required at least 48 hours before the start of construction and within five days after construction reaches its greatest height (use the enclosed FAA form). This determination expires on July 31, 1998 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission and an application for a construction permit is made to the FCC on or before the above expiration date. In such case the determination expires on the date prescribed by the FCC for completion of construction, or on the date the FCC denies the application. NOTE: Any request for extension of the effective period of this determination must be postmarked or delivered to the issuing office at least 15 days prior to the expiration date. [] The proposed construction would exceed Part 77 obstruction standards and further aeronautical study is necessary to determine whether it would be a hazard to air navigation. Pending completion of any further study, it is presumed the construction would be a hazard to air navigation. Further study: [] Has been initiated bythe FAA. [] May be requested by the sponsor within 30 days of the date of this acknowledgment. [] If the proposed structure were reduced in height to not exceed ft. above ground level ( ft. above sea level). it would not exceed Part 77 obstruction standards. If the structure is subject to the licensing authority of the FCC, a copy of this acknowledgment will be sent to that Agency. NOTICE iS REQUIREEl ANYTiM~ THIS PROJECT ~$ ABANDONED OR THIS PROPOSAL iS MODIFIED~ TITLE Obstruction Evaluation Specialist SIGNED BRUCE C BEARD ISSUED IN FORT WORTH, TEXAS ON January 2, 1997 FAA FORM 7460-7 (4~3) SUPERSEDES PREVIOUS EDITION PAGE 2 CONTINUATION SHEET AE RO NAUTICAL STUDY NUMB E R 96-ASW-3281-0 E COPPELL, TEXAS FAA FORM 7460-7, ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION This determination does not include temporary construction equipment such as cranes, derricks, etc., which may be used during the actual construction phase of this proposal. Such equipment which has a height greater than the proposed structure requires separate notice. It is extremely important that FAA Form 7460-2, Notice of Actual Construction or Alteration, Pads 1 and 2 be completed and submitted to the FAA in a very timely manner. We will use both Pads 1 and 2 as our notice as to when we need to make the necessary adjustments to the standard instrument approach procedure that is being effect by this proposal. ..,,,,,I U.S.GPO: 1993-0-348-194 'CRITICAL TO FLIGHT SAFETY . Before completing this form it is recommended that the following excerpts from the Federal Aviation Regulations, Part 77, Subpart B below be reviewed. §77.13 Construction or alteration requiring notice. §77.17 Form and time of notice {b) Each sponsor who proposes construction or alteration that is the subject of a notice (e) Each person who is required to notify the Administrator by paragraph (b) under paragraph ~a) of this secti~n and is advised by an FAA regi~na~ ~ffice that a supp~ernenta~or (c) of §77.13, or both, shall send an executed copy of FAA Form 7460-2, notice is required shall submit that nonce on a prescribed form to be received by the FAA Notice of Actual Construction or Alteration, to the Manager. Air Traffic Division. regional office at leasl 48 hours before Ihe starl of the conslructjon or alteration, FAA Regional Office having jurisdicljon over the area involved. (c) Each sponsor who undertakes conslmction or alteration that is the subject of a nolice under paragraph (a) of this section shall, within 5 days alter that construction or alteratio~ reaches its greatest height. submit a supplemental notice on a prescribed form to the FAA regional office having jurisdiction over the area invoived, if -- (1) The construdon or alteration is more than 200 feet above the surface level of its s~e: or (2) An FAA regional office advises him that submission of the form is required. SUPPLEMENTAL NOTICE -- General Instructions For your convenience in meeting Supplemental Notice Requirements of FAR Part 77, this form is set up in two parts. Please ensure all entries are legible throughout the form set. Submission instructions are contained at the top of each pert. Information in Section 2 (Construction Location -- Height) is vital for accurate charting and to adjust, if necessary, operational procedures and minimum flight altitudes. PART 1 - To Report Actual Start of Construction or Alteration PART 2 - To Report A Structure Reaching Its Greatest Height OR To Report A Construction/Project Abandoned or Dismantled Agency Display Of Estimated Burden For Notice of Actual Construction or Alteration The public report burden for this collection of informatjon is estimated to average 13 minutes per response. If you wish to comment on the accuracy of the estimate or make sugges~ons for reducing this burden, please direct your comments to OMB and the FAA at the following addresses. Office of Management and Budget -- and -- U.S. Department of Transportation Paperwork Reduction Project 2120-0001 Federal Aviation Administration Airspace and Obstruction Evaluation Branch, ATP-240 Washington, D.C. 20503 800 Independence Avenue, S.W. Washington, D.C. 20591 Please DO NOT RETURN your form to either of these addresses. FAA Form 7460-21~-931 3A(2), and 6. If applicable, also complete items 4 and 5. Detach Pa~ 1. Fold and ta~ at ~om. Mail to ~e t~ Notice of Actual Construction or Alteration U.5. ~rfmem ~ Trons~fQf~ IPlease Ty~ or P~nt on ~is Form) 1. Construction k Ty~ and Description of Construeion ~ New B. O~er of ~mcture ~ A~eration 2. Construction L~ation -- Height A. C~rdinates ITo hundr~s of seconds, if kno~) B. L~a~on IC~, ~te, inclu~ s~t Latitude Long~ude addre~ if any) C. Construeion Heigh~ Total Height I~c~re & S~el A~ve Me~ Sea Level Site Elevation Ft. AMSL Structure Height Ft. AGL FL AMSL D. Site Elevation Delermin~ By E. Reference datum of c~rdinales F. Name of Neare~ Public-U~ or Mil' Air~ ~ Actual Su~ey ~ NAD 27 Ilnclude Di~ance and Dir~on ~ Ai~) ~ USGS 7.5' Quad Chad ~ NAD 83 Q ~her IS~ci~) G ~her IS~ci~) 3. Construction Notifications A. Notification (Noti~ is Cdtlcal to Flight B. ~ns~¢on/Proj~ ~ -- FAR Pan R R~ul~) * Dae Da~ , (1} Cons~on will ~ ISubm~ at lea~ ~ hrs. in a~ance) ll ) ProOf A~ (2} ~mat~ Comple~n , (3) S~c~re Reach~ Greatest Height (2) Con~uc~on Di~an~ (Su~ w~in 5 da~l 4. Marking and Lighting A. Marked B. Light~ ~ Medium Inlens~ White ~ High Intens~ Wh~e ~ R~ ~ Yes G No ~ Tem~ra~ ~ Dual (M~ium Intens~ ~ Wh~e &~) Wh~e & R~) Dual (Hi h Intens~ ~ None 5. Antenna R~uiring FCC Licen~ A. Call Sign B. Frequency C. Date Appli~ for FCC Cons~uction Permit D. Date Con~on Pe~ I~u~ 6. Pmparer's Cedification ~ ~ Tel. No.: {Include Area C~e) Tel. No.: [Include Area ~ ~ ~ I hereby ~ffi~ that the info~afion provid~ is tme, ~mple~e, and ~rr~ to the ~st of my ~owl~e. ~CE is r~uir~ by Pa~ 77 ol ~e F~eral Avia~on R ulabons H4 C.FR. Pad ~) ~muant to ~ 1101 ot ~e F~ A~a~n Acl ~ 1~, US.C. app ~ 1~). Per~ns who kno~ng~ and wfl~lly vi~te ~e Nonce r~uiremen~ of P~ ~ are su~ Io a civil ~na~ ~ S1,~ ~f day u~l ~e is ~rsuan/to ~tion ~l(al of ~e F~ral Avia~ A~ ot ~9~. ~ ~d~ 149 U.S.C ~ ~ 1471(a)) ~ ~11 ~ a fine (cnmin~ ~n~) ~ ~ ~e ~an · e fiml offen~ and not more ~an ~,~ for sub~uem offends, ~mu~t ~ ~ ~fa) ~ ~e F~ A~ Ad ol 1 ~, ~ ~ 149 U.S.C. ~ ~ 14721a)). F~ Fo~ 74~-2 .:1-~) SUPERSEDES PR~IOUS E~ON ADVANCE NOTICE OF CONSTRUCTION SUBMIT WITHOUT DELAY 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. 3oE R. CAR,ER, P.~. November 11, 1996 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank FAA Notice of Proposed Construction Dear Mr. Griffin: We are enclosing a prepared copy of the Federal Aviation Administration Notice of Proposed Construction or Alteration for the proposed Wagon Wheel Ranch Elevated Storage Tank project. The notice has been completed based on the tank location as determined by both our conceptual site plan and the enclosed preliminary site plan. If this notice meets with your approval, please sign and date the form just above the gray area and send it along with a copy of the enclosed attachments to: Ms. Linda Steele Airspace Assistant System Management Branch Federal Aviation Administration 2601 Meacham Blvd. Fort Worth, Texas 76137 We are enclosing a draft letter for you may want to use when submitting the notice to the FAA. We are available to discuss this project further at your convenience. S lncer y. ) Enclosure /'~ ' t ;CITY OF COPP! TOWN HALL iPROPOSED 2.0 M.G. ELEV. STORAGE TANK ~ EXISTING VILLAGE PARKWAY PUMP STATION 24" : ,.' i " ~_! '.,~ ui 16" ",~ '.,~, ~i ', --,, ..,.. .. ,~ EXISTING 1.5 M.G. :, ~ ELEV. STORAGE TANK "" '~ff~ e City ~th A Beoutiful Future "~ .... WAGON WHEEL PARK ELEVATED ,..i STORAGE TANK SITE ELEVATION ~/~.,..: SHIMEK, JACO~ t FINK~, LLP, CONSULTING ENGINEERS FIGURE NO. 1' 7.5 .'vIINUT SE OPOGRAPHIC) ,,,G~'' NF./4 G~.A,'-EVIhE ':' C,':A_'=ANCLE 2'30' 684 ., ~ 685 2 1'3,3 CO0 FEETJ 6R6 97=00' · -. · .__ %,0, : "ISVILLE ~ . .-,"~; '. g. ,/' ':- _ .,,.:, :./..,.,-':.,.~ · ~ _, .-,j '-. ,.,:,-;: .:: =',..,. --:: : :.- ....... " "':,7~J~'' ., .:,,'l-'~--j---.:-~i ,,,,, s' ,,: ,.- -',"' · --- , .. i r:: ........ ,.. " "' ' ' .... " ~ _- . "' -" 480 C, CC CO' _ .__ ~, __ :: I~ -." . _ .~ FEET .... T.-~-; - .:m' .. I, / .:. · "." 3651 .. · , ..,-._... , J Gravel - '."' ---.'.;,,:, . ~ . aC:~,~~ * " I ] ' "'" · ,,, ..... \ .-' -- __/ PIts o- f .." -li .. · ~ . I C)-"- II ' I i , | _ ' PITOP4 -M'.G.. " (~) II -,' "' II .... :I ..... 'S"TOR °~ANIk--$1TE II It flful Futu. re /" I ,. "" · - i :,q,. .... - · e'-~ J WAGON WHEEL PARK ELEVATED " : J STORAGE TANK SITE ,, :~--- , ..--- ., I -- ' .... $HIMEK, JACOB$ & FINKLEA, L. LP. · m /' p ' CONSULTING ENGINEERS ,, ... ~: --. - a, ' ~ -h-. =~',= · i Nov.. 1996 ~T Please Type or Print on This Form Form Approved OMB N0. 2120-0001 , ". Notic"'f Proposed Construction U.S. Dep~drnent of Transpodation FailUre TO Prov#a= A~ Requested Information May Delay r Notice r-edefgl Avidon Admlnlslridion 1. Nature of Proposal 2. Complete Description of Structure A. Type J B. Class months) C. Work Schedule Dates Please describe the proposed construction or alteration. [] New Construction [] Permanent SeginningF~ A. For proposals involving transmitting stations, include [] Alteration 'k [] Temporary (Duration __ End ~ effective radiated power (ERP) and assigned frequency. If not known, give frequency band and maximum ERP. * If Alteration, provide previous FAA Aeronautical Study Number, if available: B. For proposals involving overhead wire, transmission lines, 3A. Name, address, and telephone number of individual, company corporation, etc. proposing the etc., include the size and the configuration of the wires and construction or alteration. (Number, Street, City, State, and Zip Code) their supporting structures. Mr. Ken Griffin, P.E., City Engineer C. For buildings, include site orientation, dimensions, and City of Coppell, P.O. Box 478 construction materials. Coppell, Texas 75019 D. Optional-- Describe the type of obstruction marking and ( 972 ) 4 62-0022 lighting system desired. The FAA will consider this in their Area Code Telephone Number study. 3B. Name, address and telephone number of proponent's representative, if different than 3A. above. Mr. Gary C. Hendricks, P.E. Elevated Water Storage Tank Shimek, Jacobs & Finklea, L.L.P. Dual (Medium Intensity White and 8333 Douglas Avenue, #820 Red) Lights Dallas, Texas 75225-5816 _ v_ l,e~fe~l~one Number 4. Location Of Structure 5. Hei~ht and Elevation Itone,r~fo~l Coordinates to hundredths of seconds A. it known) B. Nearest City or Town C. Nearest public or military airport, A. Elevation of ground above mean Latitude 0 t ff and State heliport, flightpark, or seaplane base sea level. 32 ~ 58 ~ 12 CoDDell. Texas DF~ Intern'-i Airport 525 Longitude 0 ~ ff 1 ). I~sjance to'4Sp~Oj ec t (1 }. Distance from structure to nearest B. Height of structure including all 97 I I25 .n.ide corporatepoin, o, nearest runway 4D. Source for item 4A data.Cit,y Limits atopfox. 3.8 miles 175 [] su ey [] irection to Di, tion ,,om =ucture to airportC. Overall height above mean ,eve, [] Quad Chart ~Ot applicable Due South 700 Indicate the reference datum. 4E. Description of site location with respect to highways, street, airports, prominent terrain, features, Other existing structures, etc. Please attach a U.S. Geological Survey Map (or equivalent) showing the construction [] NAD 27 [] NAD 83 [] Specify site. If available, attach a copy of a documented site survey with the surveyor's certification. Notice is required by Part 77 of the Federal Aviation Re ulations 14 C.F.R. Part 77} pursuant to Section 1101 of the Federal Aviation Act of 1958 as amended {49 U.S.C. app. § 1501 ). Persons who knowingly and willful y v o ate the Not ce requirements ~/Part 77 are subject to a civil penally of St ,000 per day until the notice is received, pursuant to Section 901 (a) of the Federal Aviation Act of 1958, as amended 49 U.S.C. app § 1471 (a)) as well as the fine )criminal penalty) of not more than $500 for the first offense and not more than $2,000 for subsequent offenses, pursuant to Section 902(a of the Federal Aviation Act of 1958, as amended (49 U.S.C app § 1472(a)). 1 HEREBY CERTIFY that all of the above statements made by me are true, complete, and correct to the best of my knowledge. In addition, I agree to obstruction mark and/or light the structure in accordance with established marking & lighting standards as necessary. Date Typed or Printed Name and Title of Person Filing Notice FAA Form 7460-1 i5-94) Supersedes Previous Edition NSN: 0052-00-012-0007 THIS IS YOUR WORKSHEET _ P/ease Type or Print on This Form ~,,.. Form Approved OMB N0. 2120-0001 ' "~l~/~ ," Aeronautical Study Number Notic,. of Proposed Construction or Alterati~jn U.S. Deportment of Transporbtion Failure To Provide All Requested Information May Delay Processing Of Your Notice Federal Avlalion Administration 1. Nature of Proposal 2. Complete Description of Structure A. Type B. Class C. Work Schedule Dates Please describe the proposed construction or alteration. [] New Construction [] Permanent Beginning A. FOr proposals involving transmitting stations, include effective radiated power (ERP) and assigned frequency, If [] Alteration 'k [] TemPOrarY (Duration __months' End not known, give frequency band and maximum ERP. -k If Alteration, provide previous FAA Aeronautical Study Number, if available: B. For proposals involving overhead wire, transmission lines, 3A. Name, address, and telephone number of Individual, company corporation, etc. proposing the etc., include the size and the configuration of the wires and construction or alteration. (Number, Street, City, State, and Zip Code) their supporting structures· C. For buildings, include site orientation, dimensions, and construction materials. D. Optional-- Describe the type of obstruction marking and lighting system desired. The FAA will consider this in their study. ( ) Area Code Telephone Number 3B. Name, address and telephone number of proponent's representative, if different than 3A. above. ( ) Area Code Telephone Number 4. Location Of Structure 5. Height and Elevation (to nearest foot) · ( to hundredths of seconds, B. Nearest City or Town C. Nearest public or military airport, A. Elevation of ground above mean A. r~n e Coo d at s if known) and State heliport, flightpark, or seaplane base sea level. Latitude 0 ; rl tl (1 )· Distance to 4B (1 }. Distance from structure to nearest B. Height of structure including all Longitude 0 I } point of nearest runway appurtenances and lighting above ground or water· 4D. Source for item 4A data· (2). Direction to 4B (2). Direction from structure to airport C. Overall height above mean sea level USGS 7.5' Indicate the reference datum. 4E. Description of site location with respect to highways, street, airports, prominent terrain, features, p existing structures, etc. Please attach a U.S. Geological Survey Map (or equivalent) showing the construction [] NAD 27 [] NAD 83 [] fy site· If available, attach a copy of a documented site survey with the surveyor's certification. Notice is required by Part 77 of the Federal Aviation Regulations (14 C.F.R. Part 77) pursuant to Section 11 01 of the Federal Aviation Act of 1958, as amended (49 U.S.C. app. § 1501 ). Persons who knowingly and willfully violate the Notice requirements of Part 77 are subject to a civil penalty of $1,000 per day until the notice is received, pursuant to Section 901 (a) of the Federal Aviation Act of 1958, as amended (49 U.S.C. app § 1471 (a)) as well as the fine (criminal penalty) of not more than $500 for the first offense and not more than $2,000 for subsequent offenses, pursuant to Section 902(a) of the Federal Aviation Act of 1958, as amended (49 U.S.C. app § 1472(a)). I HEREBY CERTIFY that all of the above statements made by me are true, complete, and correct to the best of my knowledge. In addition, I agree to obstruction mark and/or light the structure in accordance with established marking & lighting standards as necessary. Date I Typed or Printed Name and Title of Person Filing Notice Signature NOTICE TO PREPARER OF FORM 1. Retain this Work Sheet as your copy. 2. Complete and return the remaining copies. 3. Be sure all copies are legible. 4. Print or type all items. The address area will be used to return a copy of this form. {See Above.} 5. Notification to the FAA does not waive the requirements of any other government agency. 6. FAA will acknowledge this notice within 30 days of its receipt. f Agency Display of Estimated Burden: Public reporting burden of this collection of information is estimated to average 1 hour and one minute per response. Send comments regarding the accuracy of this burden estimate or any other aspect of this information collection to ' the Federal Aviation Administration, ATTN: 2120-0001 Airspace and Obstruction Evaluation Branch, ATP-240, 800 Independence Avenue, SW, Washington, DC 20591. FAA Form 7460-1 (5-94) Supersedes Previous Editions This IS Your Worksheet NSN: 0052-00-012-0007 " " 01-G:--97 A10:54 IN SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS _,Cs~ ~ 8~Ne~l: Ci~ of Coppell Wagon ~eel Ranch 2 MG Elevated Storage Tank ran 1 He . ~ ~ate: Janua~ 2, 1997 Re: FAA Notice of Proposed Construction Aeronautical Study No. 96-ASW-3281-OE Ken: Today by telephone, we spoke with both Linda Steele (817) 222-5539, and Bruce Beard (817) 222-5536, of the FAA regarding the Acknowledgment of Notice of Proposed Construction or Alteration, dated December 27, 1996. In general, the Acknowledgment appears to deny the City's application due to violations of the CFR Part 77 Obstruction Standards, and recommends the proposed structure be no higher than elevation 670 MSL. The high water elevation for the tank is planned to be 672.5 MSL and matches the HWL in the existing tank. The expected top elevation of the tank in between 690 and 700 MSL. Bruce explained that based on the project location, FAA notification is not required. However, the project will have an impact on DFW's approach patterns. Therefore, they issued the acknowledgment with a recommended lower elevation. I reminded both Linda and Bruce that the City of Coppell submitted a preliminary notification application in July of 1996, and the determination at that time was that there was no Part 77 conflicts. Ken, here is where it gets confusing: Bruce went on to say that there is still no Part 77 conflicts (even though that is what is indicated on the FAA response). The acknowledgment determination was based on approach patterns for a seldom used approach by DFW. He suggested two options available to the City at this time: 1. Since notification is not required, ignore the Acknowledgment we now have and build the Tank. Once the tank is completed, submit as-built records to the FAA so that the approach paths to DFW can be modified. I explained to Bruce that this was an unacceptable solution to the City of Coppell. We currently have on record a determination by the FAA that appears to be an denial for this project. Neither the City nor Shimek, Jacobs and Finklea are in a position to take on the resulting liability and exposure from the course of action he suggested. 2. Have the FAA issue a supplemental determination that further explains their initial determination and which will allow the construction of the tank project as planned, as long as the City provides as-built plans to the FAA and provides obstruction lighting in accordance with the FAA guidelines. After the project is complete, the FAA will work with DFW to make the necessary changes in the approach patterns. Bruce Page No. 1 of 2 SHIMEK, JAC ,BS & FINKLEA % CONSULTING ENGINEERS Phone: (214) 361-7900 FAX: (214) 361-0204 Subject: City of Coppell Wagon Wheel Ranch 2 MG Elevated Storage Tank Memorandum To: Ken Griffin, P.E. From: Gary C. Hendricks, P.E. Date: January 2, 1997 explained the approach pattern changes will be minor and will affect only a"seldom used approach" at the airport. We ask Bruce Beard to re-evaluate the City of CoppeWs notice of proposed installation and issue a clarification to the FAA initial determination dated December 27, 1996. He stated he would begin his evaluation today and that we could expect a written response within the next week. Once we receive the clarification, we recommend a meeting be scheduled with the FAA and the City of Coppell in order to get a better understanding of how this project may affect flight patterns in and out of DFW Airport. Page No. 2 of 2 ~'?-10-96 P02: 19 I N SHIMEK, JACOBS & FINKLEA, L.L.P. i 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. ~oF. R. CARTF. R, P.E. December 9, 1996 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Ms. Linda Steele Airspace As stant System nagement Branch Federal viation Administration d~6137 Re: City of Coppell Proposed 2.0 Million Gallon Elevated Storage Tank FAA Notice of Proposed Construction -- Study No. 96-ASW-3281 Dear Ms. Steele: As you requested, we have re-evaluated our calculation of the coordinates for the proposed City of Coppell, 2.0 million gallon elevated storage tank. Based on the NAD 27 reference datum, the revised tank coordinates are calculated to be: Latitude: 32d 58' 02" Longitude: 97d 01 '24" Please correct the City's application to reflect this revision. We are enclosing another partial copy of the U.S.G.S. Quadrangle map which has been modified to show the City of Coppell Street map and the proposed elevated storage tank project. We hope this clears up your questions concerning the coordinates of this project. If you have any other questions or need additional information relative to the City's application, please do not hesitate to contact us. ~Hendr~~'~'rscks, P.E. ~c:.'cl°sFV[;. Ken Griffin, P.E. GRAPEVI QUADRANGLE ' TEXAS 7.5 MINUTE SERIES (TOPOGRAPHIC) NE/4 GRAPEVINE 15' QUADRANGLE 2'30" 684 685 2 150 000 FEET I s86 97°90, --" , ',-,,, , ....... / , "~',,,_,,, '~"':-: '-X,%~' ' , ~ " "') "' ' ' -" % S --, ~ ~'~' '~-- " ' IT '~ N ;in~ Sta '~ ' 480 000 ENTON '-.- h--- FEET _% .... ~0 ~ ~[ ~ 365 l · ~; . " I ,. 'R-iWF_AT RD~. 18 ~ PROPOSED 2. 0 M.. C. .. '- STORAGE TANA' SITE .... o I! '. ,_ ~- ~ O' ' II ~' ' '~2 // The City With A Beeutiful Future ii --~,~-- ~ I' -~ '~: ~ WAGO~ WHEEL PA~K ELEVATED %%. ~k -- / ' if ) -'-l~ STORAGE TANK SITE ', ~, ~ SHIMEK, JACOBS ~ FINKEA, L,LP, ~' ~, ~, CONSULTING ENGINEERS " ~ Dallas, c DECEMBER, 1996 II ~ NI ~g:LLV 96-Lg-LL Federal Aviation Administration Southwest Region Air Traffic Division, ASW-530 Fort Worth, TX 76193-0530 CITY OF COPPELL AERONAUTICAL STUDY KEN GRIFFIN, CITY ENGINEER No: 96-ASW-3281-OE P 0 BOX 478 COPPELL, TX 75019 Date: 11/20/96 Type Structure: WATER TANK This acknowledges receipt of your Notice of Proposed Construction or Alteration dated 11/18/96. An aeronautical study will be conducted on the following location: CITY STATE NAD-83 LATITUDE/LONGITUDE MSL AGL AMSL COPPELL TX 32-58-17.44 097-01-26.02 525 175 700 Your proposal has been assigned aeronautical study number 96-ASW-3281-OE. Should there be any question concerning this proposal, please feel free to contact Linda E. Steele of the Operations Branch, ASW-530, Southwest Region. Our office telephone number is (817) 222-5539. Thank you for participating in the Obstruction Evaluation program. November 18, 1996 Ms. Linda Steele, Mrspace Assistant System Management Branch Federal Aviation Administration 2601 Meaeham Blvd. Fort Worth, TX 76137 RE: City of Coppell Project # WA 96-01 Wagon Wheel Ranch Elevated Storage Tank Dear Ms. Steele: Enclosed is a completed copy of the FAA Notice of Proposed Construction or Alteration for the City of Coppell's proposed Wagon Wheel Ranch 2.0 million gallon Elevated Storage Tank. The new tank will be located in the northwestern portion of Coppell near Highway 121 and Sandy Lake Road. Enclosed is a partial copy of the U.S.G.S. quadrangle map of the area along with a City street map showing the project location. There is also a copy of our preliminary site plan for the project provided for your information. Although the site plan is not in its final form, it does show the elevated storage tank in its expected location. The detailed plans and specifications for this project should be complete in early December of this year and bids taken for construction in either late December or early January of next year. Construction of the project should begin early 1997, and be completed in late spring or early summer of 1998. If you have any questions concerning the design or schgfi, uling~of this project, please do not hesitate to contact myself at (97~304-3679 or our d~'~!~n ~ginei~r for this project, Gary C. Hendricks, of Shimek, Jacobs and Finklea, at (214) 361-7900. Sincerely yours, Kenneth M. Griffin, P.E. Director of Public Works/City Engineer ._. enclosures cc: Gary Hendricks, Shimek, Jacobs & Finklea 21 ~361020~ " ~ P~,GE 81/83 87/23/].99,5 88:23 21436]-~'''34 SHII'4EK, JACOBS NKLE SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 DOUGLAS AVENUE, #820 DALLAS, TEXAS 75225 Fax Number: (214) 361-0204 Phone Number: (214) 361~7900 Date: July 23, 1996 Receiving Fax Number: Time: 8:15 AM ( .~ ) 304-3570 Number of Pages Transmitted (including this one) Mr. Ken Griffin Re: Proposed Elevated Storage Tank FAA Flight Parameter Investigation Message: Ken Following is a memo concerning the proposed elevated storage tank site relative to the Federal Aviation Administration's review. We were concerned with the site and potential conflict with D/FW Airport's runway expansions. The preliminary findings indicate the site is within the FAA flight parameters. I thought this information might be useful at tonight's City Council meeting. I will be in Coppeli at 4:00 p.m. to visit the pump station and ground storage tank site and expect to attend the Council meeting at 7:00. If you have any questions or would like to discuss this further, please give me a call. From: Gary C. Hendricks If the number of pages called for are not received or are not clear please call (214) 361-7900. 87/23/1996 88' 23 214361~....1~4 SHIMEK, JACOBS&F'INKLE P~GE 02/03 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS Phone: (214) 361-7900 FAX: (214) 361-0204 Subject: City of Coppoll Proposed Elevated Storage Tank Memorandum To: Ken Griffin From: Gary C. Henriticks, P-E. Date: July 22, I996 J2<.eil Although you have not directed us to do so, we have contacted the Federal Aviation Administration to discuss the elevated storage tank site the City of Coppell is considering. Since the exact tank site location has yet to be determined, we prepared an exhibit showing the extreme limits of the probable locations along with approximate elevations. We forwarded this information to the FAA. The FAA conducted a preliminary Flight Parmeter investigation using the information we provided. Their preliminary investigation found that this site is within the FAA flight parameters for an elevated storage tank at the anticipated heights shown. They cautioned that the results are preliminary and that a formal investigation would need to be conducted once the exact tank location is determined. ' 67/23/1996 88:23 2143618284 SHIMEK, JACOBS&FINKLE PAGE 83/83 · ~ ...- ..... .., ~ ~.,,., ~ ,: / W 't ,, ~ .,:~ ] ,/ / ~ ',~ -, ~0 · ~ ...... / ~ / · · ......... % ~ E--- "' ~ ~" . ,., ' ~ ? N REPLY REFER TO SouthWest Region AERONAUTICAL STUDY U.S. Department NO. 96-ASW-3281-OE of Transportation Air Traffic Operations Branch Federal Aviation Fort Worth, Texas 76193-0530 c,,,, ,~ q'6 ~O 1 ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION tt CITY OF COPPELL CONSTRUCTION LOCATION ~i ATTN KENGRIFFIN z! COPPELL, TX O P O BOX 478 COPPELL TX 750 19 ~'rrruoe 1.0NGITuoF 32058'02.44" 9700 1 '25.02" DEsca,Fno. ELEVATED WATER STORAGE TANK A,,ow CONSTRUCTION PROPOSED 175 7(10 The Federal Aviation Administration hereby acknowledges receipt of notice dated November 18, 1996 conceming the proposed construction or alteration described above. A study has been conducted under the provisions of Part 77 of the Federal Aviation Regulations to datermine whether the proposed construotion would be an obstruction to air navigation, whether it should be marked and lighted to enhance safety in air navigation, and whether supplemental notice of start and completion of construction is required to permit timely charting and notification to airmen. The findings of that study are as follows. [] The proposed construction does not require notice to FAA. [] The proposed Gon~truGtion is not identified as an obstruction under the standards of FAR, Part TT, ,Subpart C and would not be a hazard to air navigation. [] The proposed construction is identified as an obstruction under the standards or FAR, Part 77. Subpart C but would not be a hazard to air navigation. [] The structure should be obstruction marked and lighted per FAA Advisory Circular AC 70/7460-1, 'Obstruction Marking and Lighting,: Chapters__ [] Supplemental notice is required at least 48 hours before the start of conetruotion and within five days after construction reaches its greatest height (use the enclosed FAA form). This determination expires on unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission and an application for a construction permit is made to the FCC on or before the above expiration date. In such case the determination expires on the date prescribed by the FCC for completion of construction, or on the date the FCC denies the application. N GTE: Any request for extension o; the effe~ive period of th~s determination mr:st be postmarked or delivered to the issuing office at least 15 days prior to the expiration date. [] The proposed construction would exceed Part 77 obstruction standards and further aeronautical study is necessary to determine whather it would be a hazard to air navigation. Pending completion of any further study, it is presumed the construction would be a hazard to air navigation. Further study:. [] Has been initiated bythe FAA. [] May be requested by the sponsor within 30 days of the date of this acknowledgment. [] If the proposed structure were reduced in height to not exceed 145 ft. above ground level (670 ft. above sea level), it would not exceed Part 77 obstruction standards. If the structure is subject to the licensing authority of the FCC, a copy of this acknowledgment will be sent to that Agency. NOTICE IS REQUIRED ANYTiME THE PROJECT IS ABANDONED OR THE PROPOSAL iS MODIFIED, TITLE Obstruction Evaluation Spedalist SIGNED BRUCE C BEARD ISSUED IN FORT WORTH, TEXAS ON December 27, 1996 FAA FORM 7460-7 (4-83) SUPERSEDES PREVIOUS EDITION ; SouthWest Region AERONAUTICAL STUDY U.S. Department NO. 96-ASW-328 ]-OE of Transportation Air Traffic Operations Branch Fort Worth, Texas 76193-0530 U,J/~ ~(~-0 I Federal Aviation ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION ~c C]:TY' O:F COPPEEL CONSTRUCTION LOCATION i ATTN EF, N GK]:~:FI:IN COPPEEL, O P O :BOX 4'78 '~ LATITUDE 4 / ~)LONG/I'UDE :~ COPPEEL ~ 32 58 02.4 ? 0] 25.02 , DEsCmrnON ELEVATED WATEP, STOP, AGE TAN~ Aeuv. u.uu.. CONSTRUCTION PROPOSED ]'75 '700 , i The Federal Aviation Administration hereby acknowledges receipt of notice dated November 18, 1996 concerning the proposed construction or alteration described above. A study has been conducted under the provisions of Part 77 of the Federal Aviation Regulations to determine whether the proposed construction would be an obstruction to air navigation, whether it should be marked and lighted to enhance safety in air navigation, and whather supplemental notice of start and completion of construction is required to !oermit timely charting and notification to airmen. The findings of that study are as follows. [] The proposed construction does not require notice to FAA. [] The proposed construction is not identified as an obstruction under the standards of FAR, Part 77, Subpart C and would not be a hazard to air navigation. [] The proposed construction is identified as an obstruction under the standards of FAR, Part 77, Subpart C but would not be a hazard to air navigation. [] The structure should be obstruction marked and lighted per FAA Advisory Cimular AC 70/7460-1, 'Obstruction Marldn9 and Lighting,: Chapters __ [] Supplemental notice is required at least 48 hours before the start o1" construction and within five days after construction reaches its greatest height (use the enclosed FAA form). This determination expires on unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority ofthe Federal Communications Commission and an application for a construction permit is made to the FCC on or before the above expiration date. In such case the determination expires on the date prescribed by the FCC for completion of construction, or on the date the FCC denies the application. NOTE:Any request for extension of the effe,.-'tive period of this determinW. ion must be postmarked or delivered to the issuing office at least 15 days pdor to the expiration date. [] The proposed construction would exceed Part 77 obstruction standards and further aeronautical study is necessary to determine whether it would be a hazard to air navigation. Pending completion of any further study, it is presumed the construction would be a hazard to air navigation. Further study'. [] Has been initiated bythe FAA. [] May be requested by the sponsor within 30 days of the date of this acknowledgment. [] If the proposed structure were reduced in height to not exceed 145 ft. above ground level (670/t. above sea level), it would not exceed Part 77 obstruction standards. If the structure is subject to the licensing authority of the FCC, a copy of this acknowledgment will be sent to that Agency. NOTICE IS REQUIRED ANYTI~IE THE PROJECT IS ABANDONED OR THE PROPOSAL IS MODIFIED, TITLE Obstruction Evaluation Specialist SIGNED BRUCE C BEARD ISSUED IN FORT WORTH, TEXAS ON December 27, 1996 FAA FORM 7460-7 (4-83) SUPERSEDES PREVIOUS EDITION I, PAGE 2 CONTINUATION SHEET AERONAUTICAL STUDY NUMBER 96-ASW-3281-OE COPPELL, TEXAS FAA FORM 7460-7, ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION The proposed construction would be located approximately 18,813 feet north Runway 17C at the DFW International Airport, DFW, Texas. It would exceed the obstruction standards of the Code of Federal Regulations, Part 77, as follows: · Section 77.23 (a)(3) by 30 feet - a height that increases minimum instrument flight altitude within a terminal area (TERP's criteria). The proposal would require increasing the minimum descent altitude of the LOC RWY 17C instrument approach procedure. The no effect heiqht would be 145 feet AGL / 670 feet AMSL. ~ A favorable determination can be issued immediately at a structure height of 145 feet AGL / 670 feet AMSL. Based on the significant impact a 175-foot AGL / 700-foot AMSL structure will have on the instrument approach procedure serving the DFW International Airport, the maximum height the FAA will consider at your proposed location is 145 feet AGL / 670 feet AMSL. ~