Loading...
Cambridge Phase 1-LR 941128I G EOTECHNICAL E GEE Consultants, Inc. E IN\'''IRONMExTAL 2540 Glenda Lane · Suite 108 ° Dallas. Texas 75229 · (214', 620-9791 ° Fax ~214~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 28, 1994 Date Concrete Placed: October 26, 1994 Standard 6"x12" Client: Beamer Development Corporation Area 28.27 Square Inches Pr~ect: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 33 Coutractor: Griffinh Construction Concrete Supplier amd P]ant: Lattimore P!an~ #7 Location of Placement: Storm 'Drain Inlet Leave Out s,~ sm B.t~h w.~. INSPECTION DATA MAT E R I AL S ~.-~.~,!~ ,u~ c~'~ Mix Number: 38 Time Sample Batched: 2:31 pm Cement: 5.0 s.k. Time Smnpled: 3:17 pin Sample Location: E. side of Castle Creek Drive Fly Ash: Tmck;'ricket No: 456/7005131 Coarse Aggregate: Temperature: Intermediate Aggregate: :Mnbient Range: 66 ° F Concrete Range: 67°F Fine Aggregate: Slump Range (inches): 4:,-'5 Admixtures: Weather Conditions: Partly Cloudy I WFR Time Started: 2:45 pm 2 Air Time Completed: 4:25 pm Added Water: q -,al Sample Air Content (%'~: No test - - Total Cubic Yards Placed: 5.5 CY Required Strength (Lhs.:sq.[n.): 3.000 Specimen Mcasu~d Age D'atc Total Load C~.~r~. mssiv¢ Stmng'h Rew~r~ N~r SI~ ,in.l ~Da5 s: '[es~ ,L~.) . L~.-Sq.~.~ ECM 121 4~ 7 11/02/94 89,220 3,160 ECM 122 4% 28 11/23/94 150,860 5,340 ECM 123 4% 28 11/23/94 151,680 5,370 Tcs~ Metk~ I.':Ch~ Fracture Reg,&ar Cylinders Made By: R. G. Remarks and:or Distribution: Bill Anderson- Dowdy. Anderson and A~ociates. Inc. Larry Davis - City or' Coppell