Cambridge Phase 1-LR 941128I G EOTECHNICAL
E GEE Consultants, Inc.
E IN\'''IRONMExTAL
2540 Glenda Lane · Suite 108 ° Dallas. Texas 75229 · (214', 620-9791 ° Fax ~214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 28, 1994 Date Concrete Placed: October 26, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Pr~ect: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 33
Coutractor: Griffinh Construction
Concrete Supplier amd P]ant: Lattimore P!an~ #7
Location of Placement: Storm 'Drain Inlet Leave Out
s,~ sm B.t~h w.~. INSPECTION DATA
MAT E R I AL S ~.-~.~,!~ ,u~ c~'~
Mix Number: 38 Time Sample Batched: 2:31 pm
Cement: 5.0 s.k. Time Smnpled: 3:17 pin
Sample Location: E. side of Castle Creek Drive
Fly Ash: Tmck;'ricket No: 456/7005131
Coarse Aggregate: Temperature:
Intermediate Aggregate: :Mnbient Range: 66 ° F
Concrete Range: 67°F
Fine Aggregate: Slump Range (inches): 4:,-'5
Admixtures: Weather Conditions: Partly Cloudy
I WFR Time Started: 2:45 pm
2 Air Time Completed: 4:25 pm
Added Water: q -,al Sample Air Content (%'~: No test
- - Total Cubic Yards Placed: 5.5 CY
Required Strength (Lhs.:sq.[n.): 3.000
Specimen Mcasu~d Age D'atc Total Load C~.~r~. mssiv¢ Stmng'h Rew~r~
N~r SI~ ,in.l ~Da5 s: '[es~ ,L~.) . L~.-Sq.~.~
ECM 121 4~ 7 11/02/94 89,220 3,160
ECM 122 4% 28 11/23/94 150,860 5,340
ECM 123 4% 28 11/23/94 151,680 5,370
Tcs~ Metk~ I.':Ch~ Fracture Reg,&ar Cylinders Made By: R. G.
Remarks and:or Distribution:
Bill Anderson- Dowdy. Anderson and A~ociates. Inc.
Larry Davis - City or' Coppell