Cambridge Phase 1-LR 941117I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 10g · Dallas, lexas 75229 · !214) 620-9791 · Fax t~14) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Repoa Date: November 17 1994 Date Concrete Plac~d: October 19, 1994 Standard 6"xl?
Client: Beamer Development Corporation Area ~g ~7
-' ..~ Square. Inches
Project: Estates of Cambridge Manor, Phase I Conc~teRepo~No.: 30
Con~rac~or: Grif fith Construction
Concrete Supplier and Pla.~: Lattimore Mauerials
Location of Placement: Drop Inlet Top
MATER IAL S s~, s~o a.~ w~,.
~.~. :L~.'C.¥~; INSPECTION DATA
Mix Number: 38 Time Sample Batched: 2:13 pm
Cement: 5.0 s.k. Time Sampled: 3:20 pm
Fl.v Ash: Sample Location: Castle Creek Drive (west side)
Truc k:-riz ket No: 305.-'1015400
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 85
Fine Aggregate: Concrete Range: 82~F
Admixtures: Slump Range (inches): 3'
Weather Conditions: Partly Cloud}'
1 R. Air Ti,ne Started: 2:45 pm
2 Time Completed: 4:15 pm
Added Water: l0 gal. Sample Air Content (q): No test
Total Cubic Yards Placed: 7.5 CY
Required Streng,.h (Lbs..'sq.in.):
Spe~_,'r~n Measured Age Da~: 'l'oul Load Ccmp.-~ss~x~: Strength
Remarks
N ~...b~ r Sl,~np .in. ~ {Da.~ s ~ Tesaxi (Lbs.:
ECM 111 3" 7 10/26/94 83,740 2,960
ECM 112 3" 28 11/16/94 104,940 3,710
ECM 113 3" 28 11/16/94 98,160 3,470
Test .Merit, ods L"~k~d Fracture Regular
ASI'M C-31.C-39. C-:-t3 Ur-ess N~:t:~ Otmr.~, Cylinders Made By: K. Mc.
Remarks and/or Distribution:
· cc: Bill Anderson - Dowdy. Anderson and Associates. In,:.
Larry Davis - City of Copp¢ll
(~El~ ~-onsultants, Inc. Reviewed by:
All ~=tter$ and ..=porta a.n= for th= excluai~ ~ of ~ cli¢nt to v, hom ti'~y a~ a~i~cd and shall ~ ,he reproduced wit,houl th= full app. o~wal of GEE Ccn~uhanLs. inc. 1"ia=
out prior ~.ri. tten approva . Our let'.~m and reports al~._ly only to ~ sampl.- 'xs'.~l and:or i~.spr~d ami a~ not rgce~sariiy indicative of ti~: qu,uuiti~s of apparent.'y :.dt:nticai or .-imLar Froducts.