Loading...
SS9901-CN050422 APR 22 2005 13:06 FR TURNER' COLL I Ea BRRDEN972 735 3002 TO 99723043570 P.04/05 r•rom: 04/11/2005 I9:47 #985 P.001/001 Request for Information Detailed,RFIs without Collaboration and Impact Info Grouped by RFl Number Deforest&Sansei Lirk9 Lift Station Project At 04-44 Gan-Par Construction Company, inc. Tel; Fax; • RFi#: 011 Data Created: 4J12J2005 Tumor Collie&Braden Inc, Erika Cooper C Hoff an For Construction Company, Todd Hoff 17300 Dallas Parkway Inc. 1 Suite 1730 1010 11031 Grissom Lane Dallas. TX 75248 Dales, 7X 75229 - ;. :.:;.. . .A#;i>l;}fr�rt FLtirh�l<2l�pki�t' .-.,.:;. . .:•. Brick Eltipl�n ;' To date we have gone to two brick manufacturers and two general brick suppliers to match the brick out on the project The existing brick 1s not an acme brick, as described in the Specifications. it Is a brick from a smaller company and .hough the color and texture is still available it is not available in the 3•'x 10•'size as exists. The closest we can get is a King Size Brick. Prolog LT Printed on: 4/12/2005 at„locpPdl deforest&sandy lake lift ststlan.prrrd Pagel of 1 APR 22 2005 13:07 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723043570 P.05/05 DeForest and Sandy Lake Wastewater Lift Stations RFt No. 11 Response Date; April 22, 2005 TCB Project no 0521 31 1 24.0001.04000.A103 The intent of the drawings and specifications was to get brick that matches the existing brick in color and texture only, not size or manufacturer. Brick size should be per the specifications, which is a modular size. If you have any further questions, please feel free to contact Erika Cooper at 972-735-3056. cc: Rick O'Dell, Project Inspector—City of Coppell File ** TOTAL PAGE.05 ** P.02i05 PPR 22 2005 13:0E FR TI_IRNER COLLIE& BRADEN972 735 3002 TO 99723043570 From: 04r o3/2005 18:55 4'944 P.001/001 Request for Information I 4 _ Detailed, RFIs without Collaboration and Impact Into Grouped by RFI Number Deforest&Sandy Lake Litt Station Project# 04-44 Can_Fer Canstructlon Company, Inc. — — _ 7s1: Fax: RFI#: 009 Atntrwier:' �iNkB.i$yr Data Created: 4/4/2005 Turner Collie&Braden lnc. Erika C ���' �.. •` ... ,: ._ ..A�i�i1i►ei?�t :.:' ooper GanferConstruction Company, Todd Hof 17300 Dallas Parkway Inc. Suite 1010 11031 Gnssom Lane Daifaa, TX 75248 Dallas, TX 75229 Sheet Piling i3isc►iklita« sAffe'n9ellrfflsifaaio eptabe :.•...;:::.; ..• ... and ba sl around Adds the d f5 V d out Caro.Fer Construction would like to abandon the sharing in place and ba !!around �kttitti�rer .. •$67ti A TTAPC .4yd :(ctP‘P Pro/rigLT Printed Orr 4/4/2005 c:L_. bappell deforest a sandy lake lift station.pmd Page 1 of 1 PPR 22 2005 13:06 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723 043570 P.©3/05 DeForest and Sandy Lake Wastewater Lift Stations RFI No. 9 Response Date: April 22, 2005 TC8 Project no. 0521 31 1 24.0001.04000A103 Shoring for the DeForest Lift Station can be abandoned in place except for shoring within 5 feet horizontally of any piping entering or exiting the lift station. Within this zone, the shoring must be removed over its entire vertical extent. Remove any shoring to remain to at least 5 feet below grade. This change will be at no cost to the City. If you have any further questions, please feel free to contact Erika Cooper at 972-735-3056. cc: Rick O'Dell, Project Inspector—City of Coppell File