Cambridge Phase 1-LR 941118G EOTECHNICAL
[ GEE Consultants, Inc.
E INv R°xx-' ENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · :214~ 620-9791 · Fax (214:620-979'4
GENERAL REPORT General Report No. 9
Report Date November 18, 1994 Date Samples: October 31, 1994
Client Beamer Development Sa~nple Ty'pe: "D"
Project B-94-0178
Estates of Cambridge Manor, Phase I
Coppell, Texas
Identification Asphaltic Concrete Centrifuge Extraction and Gradation
Method of Test TEX-210-F
Results
Specifications tbr Public
Works Construction
Passing Retained On ~North Central Texas) Actual Test on the Sample
~3_ inch Sieve 100'% 100%
% inch Sieve 85 to 100.% 98,%
'~,'~ inch Sieve No. 4 Sieve 21 to 53.% 27%
No. 4 Sieve No. 10 Sieve 11 to 325{ 31
Total Retained on No. 10 Sieve 54 to 74% 60%
No. 10 Sieve No. 40 Sieve 6 to 32% 17%
No. a,0 Sieve No. 80 Sieve 4 to 27'% 13%
No. 80 Sieve No. 200 Sieve 3 to 27% 6%
No. 200 Sieve
Percent of Total Mixture
Fine and Aggregate: 95.05-~
Residual Bitmnen: within 4.0 to 8.0% 5.0%
Note: Above test results meet specification requirements
cc: Mr. Bill Anderson - Dowdy, Anderson and Associates
Mr. Larry Davis - City of Coppell