Loading...
Cambridge Phase 1-LR 941118G EOTECHNICAL [ GEE Consultants, Inc. E INv R°xx-' ENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · :214~ 620-9791 · Fax (214:620-979'4 GENERAL REPORT General Report No. 9 Report Date November 18, 1994 Date Samples: October 31, 1994 Client Beamer Development Sa~nple Ty'pe: "D" Project B-94-0178 Estates of Cambridge Manor, Phase I Coppell, Texas Identification Asphaltic Concrete Centrifuge Extraction and Gradation Method of Test TEX-210-F Results Specifications tbr Public Works Construction Passing Retained On ~North Central Texas) Actual Test on the Sample ~3_ inch Sieve 100'% 100% % inch Sieve 85 to 100.% 98,% '~,'~ inch Sieve No. 4 Sieve 21 to 53.% 27% No. 4 Sieve No. 10 Sieve 11 to 325{ 31 Total Retained on No. 10 Sieve 54 to 74% 60% No. 10 Sieve No. 40 Sieve 6 to 32% 17% No. a,0 Sieve No. 80 Sieve 4 to 27'% 13% No. 80 Sieve No. 200 Sieve 3 to 27% 6% No. 200 Sieve Percent of Total Mixture Fine and Aggregate: 95.05-~ Residual Bitmnen: within 4.0 to 8.0% 5.0% Note: Above test results meet specification requirements cc: Mr. Bill Anderson - Dowdy, Anderson and Associates Mr. Larry Davis - City of Coppell