Loading...
SS9901-CN050404 APR 04 2005 09:21 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723 043570 P.02/03 rom: 03/,.., 2005 23:44 #915 P.001/001 Request for Information Detailed, RFIs without Collaboration and impact Info Grouped by RFI Number Daforeat&Sandy Lake Lift Station Projact# 0444 Can-Far Construction Company,inc. Tel: Fax: RFI# 008 Date Croatad: 3/29/2005 t►►l�fEY . . '•r4�l16hbt#:�Y - CetKD�fe'' . .::. �:,:�i#iye�i:�#t$y:� .......", 'x`<�ut�►�f.�b'.,.. .: ..... �:, ::> Turner Collie& Braden inc. Enka Cooper Can-For Construction Company, Todd Hoff Inc. 17300 Dallas Parkway 11031 Grissom Lane Suite 1010 Dallas, TX 75229 Dallas, TX 75248 Masonry Wail The masonry wall that Is going to enclose the spiral stair case that is shown on sheets 47 and 59 will have to be moved to the south just a bit to miss the handrail for the stair, The plans show a dimension of 6"-1". but to miss the handrail t0 the north the wall will have to move to the south roughly 4". is this acceptable? Please advice. yy_ds Prolog LT Printed on. 3/2D/2005 al..looppell deforest&sandy lake lift Stalion.pmd — Page 1 of 1 APR 04 2005 09:21 FR TURNER COLL I E& BRADEN972 735 3002 TO 99723043570 P.03%03 DeForest and Sandy Lake Wastewater Lift Stations RFi No. 8 Response Date: April 4, 2005 TCB Project no. 052131124.0001,04000.A103 The south masonry wall can be moved to the south as necessary to miss the handrail. Please confirm that this will leave adequate room to open the access hatch located south of the wall. The City would prefer that the hinges for this hatch be on the north. However, if there is not adequate room to open the hatch with this configuration, the hinges can be on the south_ If you have any further questions, please feel free to contact Erika Cooper at 972-735-3056. cc: Rick O'Dell, Project Inspector— City of Coppell File w*: TOTAL PAGE.03 ,1%<