Cambridge Phase 1-LR 941110 (2)I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 10g · Dallas, Yexas 75229 · (214) 620-9791 · [ax ~214.~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 10, 1994 Date Concrete Placed: October 12, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Pro, eot: Estates of Cambridge Manor, Phase I Concrete Repo~No.: 28
Contractor: Site Concrete
Couer¢t~ Supplier and P|auI: Site Concrete
Location of Placement: Payment
MATERIALS s~ ~sD~.,.~w~. INSPECTION DATA
Description ILb~-CuYfl!
Mix Number: Time Sample Batched: 8:15 am
Cement: 5 sk Time Sampled: 8:20 am
Fix' Ash: Sample Location: Widening of corner on SE ofdcvleopment site
' Truck:'l'ic ket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 58°F
F~ne Aggregate: Concrete Range:
Admixtures: Slump Range (inches): 2.75-3.25
Weather Conditions: Clear
I Time Started: 7:20 am
2 Time Completed: 9:30 am
Added Water: Sample Air Content (%): No tes~
Total Cubic Yards Placed: 75.0 CY
Required Strength (Lbs./sq.in.): 3.000
SpecL.-nen Me~d Age Dale To.al Load Comp~sive
Ntanbef Sluv~. ,in.) ,Days, Tcs'.efl :Lbsd Lb~.. $c.L~.I
ECM 103 3.0 7 10/19/94 110,220 3,890
ECM 104 3.0 7 10/19/94 109,620 3,880
ECM 105 3.0 28 11/09/94 127,280 4,500
ECM 106 3.0 28 11/09/94 126,080 4,460
Test Methods [.'tilLr~d F.-=~ate R~gu.;ar
ASI'M C-3~.C-39. C--'.43 ,t'.-tles5 ,~o~a oam~.ise, Cylinders Made By: P. ~.
Remarks and/or Distribution:
Bill Anderson- Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppell
GEE ~onsultantst Inc. Reviewed by: ~/~
All let~rs ar~[ _,eports am roi' the exclusive u.ne ef the cE, em to whom '.hey ave acld.,es.~x! and shall nv~ be .,epr~duc~t without '.he full a~'al of GEl: Cemau~tant~. knc. 'l~ ~_,m of cur ~ must