Loading...
Cambridge Phase 1-LR 941110 (2)I G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g · Dallas, Yexas 75229 · (214) 620-9791 · [ax ~214.~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 10, 1994 Date Concrete Placed: October 12, 1994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Pro, eot: Estates of Cambridge Manor, Phase I Concrete Repo~No.: 28 Contractor: Site Concrete Couer¢t~ Supplier and P|auI: Site Concrete Location of Placement: Payment MATERIALS s~ ~sD~.,.~w~. INSPECTION DATA Description ILb~-CuYfl! Mix Number: Time Sample Batched: 8:15 am Cement: 5 sk Time Sampled: 8:20 am Fix' Ash: Sample Location: Widening of corner on SE ofdcvleopment site ' Truck:'l'ic ket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 58°F F~ne Aggregate: Concrete Range: Admixtures: Slump Range (inches): 2.75-3.25 Weather Conditions: Clear I Time Started: 7:20 am 2 Time Completed: 9:30 am Added Water: Sample Air Content (%): No tes~ Total Cubic Yards Placed: 75.0 CY Required Strength (Lbs./sq.in.): 3.000 SpecL.-nen Me~d Age Dale To.al Load Comp~sive Ntanbef Sluv~. ,in.) ,Days, Tcs'.efl :Lbsd Lb~.. $c.L~.I ECM 103 3.0 7 10/19/94 110,220 3,890 ECM 104 3.0 7 10/19/94 109,620 3,880 ECM 105 3.0 28 11/09/94 127,280 4,500 ECM 106 3.0 28 11/09/94 126,080 4,460 Test Methods [.'tilLr~d F.-=~ate R~gu.;ar ASI'M C-3~.C-39. C--'.43 ,t'.-tles5 ,~o~a oam~.ise, Cylinders Made By: P. ~. Remarks and/or Distribution: Bill Anderson- Dowdy. Anderson and Associates. Inc. Larry Davis - City of Coppell GEE ~onsultantst Inc. Reviewed by: ~/~ All let~rs ar~[ _,eports am roi' the exclusive u.ne ef the cE, em to whom '.hey ave acld.,es.~x! and shall nv~ be .,epr~duc~t without '.he full a~'al of GEl: Cemau~tant~. knc. 'l~ ~_,m of cur ~ must