Cambridge Phase 1-LR 941110 (4)I G EOTECHNICAL
E GEE ConSultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214; 620-9791 · Fax ~1214. 620-9794
REPORT OF CONCRETE NHX INSPECTION
Report Date: November 10, 1994 Date Concrete Placed: October 28, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 37
Contractor: Griffith Construction
Concrete Supplier and Plant: Lattimore Plant #3
Location o£Placement: Storm Drainage Curb
~ .... ss~s.,chW~. INSPECTION DATA
MATER IAL S ~;o. a.~..-cuva',
Mix Number: 38 Time Sample Batched: 3:32 pln
Cement: 5.0 sk Time Sampled: 4:15 pln
Sample Location: King Canyon. S. side. E. end
Fly Ash: Tmck,-ricket No: 311/3007384
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 64~F
Concrete Range: 74°F
Fine Aggregate: Slump Range (inches):
Admixtures: Weather Conditions: · Clear
I AE Time Statn. ed: 3:45 pm
2 Time Completed: 5:00 pm
Added Water: None Sample Air Content (%):
Total Cubic Yards Placed: 8 CY
Required Strength (Lbs..:sq.in.): 3,000
Sl:ecqrn~n M ea_quted Age Dam Te~al l~i
ECM 127 3" 7 11/05/94 137,420 4,860 Broke on 11/7/94
ECM 128 3" 28 11/25/94
ECM 129 3" 28 11/25/94
Test Mc~c~ U:ii~ Fm~mm Regffiar Cylinders Made By: V. S.
A~M C-31.C-39,C-[43 ~[l~ss N~ O~'~
Remarks and/or Dist6bution:
cc: Bill Anderson - Dowdy, Anderson and As~iates, Inc.
~' Davis - City of Coppell
~ ~nsult~ts, Inc. Reviewed by:
/
All I*t~:rs and r~,c~.s am for the, cxclusiv~ tu~ of ti~ cli~m lo whom ~ in~ mddms,~cd ~ shall nO. Ix: t~. red'aced withota t.h~ .ttdl alT. ToN. al Of GEE Comul:an,.a. Lnc. The us~ of ~ nanm must
o~r prior w-r{thtu a.~pt~val. Om' l~tl~rJ and ~por~ a.t'ply only ~ th~ sampt,' te. st~l ar~ or in~pe, c~d ard am hal r~-~.*sa.-4."y :,ndlcali~c of Iht qtamtitiea of a.=pttmntly [,t,'nt:.ca~ or s;.milar pmd,.~-t~.