Cambridge Phase 1-LR 941107I G EOTECHNICAL
E GEE Consultants, Inc.
E I
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax ~214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 7, 1994 Date Concrete Placed: October 7, 1994 Standard 6'x12''
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 36
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete
Location of Placemem: Cul De Sac, East Side
sou,~.' ssD,,,ch w~. INSPECTION DATA
MATERIALS ~,~ ~'L~. c~v~,
Mix Number: Time Sample Batched: 1:10 pm
Cement: 5.0 s.k. Time Sampled: 1:15 pm
Sample Location: Cul De Sac
Fly Ash: Truck."Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 74~F
Fine A~gre_oate: Concrete Range: 74°F
~ ~ Slump Range (inches): 5;;2
Admixtures: Weather Conditions: Raining
1 Time Started: 6:45 am
2 Time Completed: 2:30 pm
Added Water: Sample Air Content (%): 2.25f}
Total Cubic Yards Placed:
Required Strength (Lbs.!sq.in.l: 3.000
Spec{men Mcasu~d Age Da'.* Total L."~I
Numb, ct S::.~mp !ln.t :Days) Tcsu::d :Lbs.: :Lbs. Sq.ln.,
ECM 87 5½ 7 10/14/94 75,200 2,660
ECM 88 5½ 7 10/14/94 79,820 2,820
ECM 89 5% 28 11/04/94 108,260 3,830
ECM 90 5% 28 11/04/94 99,860 3,530
Te*: Mci.hods t'.Hizeu F.~c:um Regular Cylinders Made By: V. S.
ASq'M C-51.C-39.C-143 :Unle. a~ N~d O'3-~.':~i~e~
Remarks and.-'or Distribution:
-cc: Bill Anderson- Dowdy, Anderson and Associates, Inc.
Lan'),' Davis - City o£ Coppell
gEE Consultants, Inc. Reviewed by: ~~~ ~
All I~tte~ a~l tepor'.s am for ~ e. xclusi~= tee of '.ha eli=hi to ~,lx~m ~ am add.q~s~i and shall not be reproduced ~.ill',oui '.ha P--'."I ap'l~:'r~al of GEE Cot~uilants, Inc. The u.qe et' oar n,ur~ must
our prior *,ri:mn apl~ro~al. Our kc:rets and rcpcri, s apply only :o th: san'.pi¢ '~amcl ar~i,'or h'~sp~acd ard are not n=otssari:y i=lic~tixz of t~ q~antki=s er ar.-'~mally identical or similar prexluc~.s.