Cambridge Phase 1-LR 941107 (2)G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 10g · Dollas, Texas 75229 · (214~ 620-979] · [ax Q14i 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 7, 1994 Date Concrete Placed: October 7, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Con~reteReponNo.: 35
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete
~)cation of Placement: Cambridge Manor Drive
MATERIALS ~ .... · sso.~:~w.. INSPECTION DATA
DeacriFrc~ iLbe 'CuYch
Mix Number: Time Sample Bat:he&
Cement: 5.0 s.k. Time Sampled:
Sample Location: Station 0-80
Fly Ash: Tru,:k/'ricket No:
Coarse Agg~gate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aggregate: Concrete Range: 71 °F
Admixtures: Slump Range (inches): 4.0
Weather Conditions: Cloudy
I Time Staaed: 6:45 am
9 Time Co.npleted: 2:30 pm
Added Water: Sample A r Content ( ,~): 1.25 ~
Total Cubic Yards Placed:
Required Strength (Lbs.-'sq.in.): 3.000
S~cimen Measutexl Age Dute Total L,~I Ccn~p.r~.~sivc S:_'e.".g~'l Rcrr. ark~
N u.-'r, ber Slum.4~ ,b.) ,'Da~, s ~ Tcst~ il.i~.! ~Lbs.-Sq. In.~
ECM 83 4.0 7 10/14/94 87,840 3,110
ECM 84 4.0 7 10/14/9~ 85,520 3,030
ECM 85 4.0 28 11/04/94 123,280 4,360
ECM 86 4.0 28 11/04/94 119,600 4,230
Test Me:inods Udt:3a:d Fracture Regular CyLinders Mad~ B'.': P. C. M.
AST.I.I C-31 .C-39. C- ;43 :L'nles~ Nord Other, vise ~ - -
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
LarD.' Davis - City of Coppell
g~ ~onsultants, Inc. Reviewed by:~'"~-- / ~..· ,.._~---
All I~tmvs and .reports an: for tl~ exclu~ix~ u~ of the client to whrnrs C,'~y am add~sed and shall t-~ be mpradu~aed wi'.ho~ ~ ~ approval of GEE Co~euitants. Inc. Th~ ~ of our r. arc~ must receive
o~' pdo~', written av-'pro~,'al. Om' k:ttem and t%'po, r'a mfg. ]y only ~;o ~ sample ~ted and/or in~pec..~d and am