Loading...
Cambridge Phase 1-LR 941107 (2)G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g · Dollas, Texas 75229 · (214~ 620-979] · [ax Q14i 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 7, 1994 Date Concrete Placed: October 7, 1994 Standard 6"x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Con~reteReponNo.: 35 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete ~)cation of Placement: Cambridge Manor Drive MATERIALS ~ .... · sso.~:~w.. INSPECTION DATA DeacriFrc~ iLbe 'CuYch Mix Number: Time Sample Bat:he& Cement: 5.0 s.k. Time Sampled: Sample Location: Station 0-80 Fly Ash: Tru,:k/'ricket No: Coarse Agg~gate: Temperature: Intermediate Aggregate: Ambient Range: 70°F Fine Aggregate: Concrete Range: 71 °F Admixtures: Slump Range (inches): 4.0 Weather Conditions: Cloudy I Time Staaed: 6:45 am 9 Time Co.npleted: 2:30 pm Added Water: Sample A r Content ( ,~): 1.25 ~ Total Cubic Yards Placed: Required Strength (Lbs.-'sq.in.): 3.000 S~cimen Measutexl Age Dute Total L,~I Ccn~p.r~.~sivc S:_'e.".g~'l Rcrr. ark~ N u.-'r, ber Slum.4~ ,b.) ,'Da~, s ~ Tcst~ il.i~.! ~Lbs.-Sq. In.~ ECM 83 4.0 7 10/14/94 87,840 3,110 ECM 84 4.0 7 10/14/9~ 85,520 3,030 ECM 85 4.0 28 11/04/94 123,280 4,360 ECM 86 4.0 28 11/04/94 119,600 4,230 Test Me:inods Udt:3a:d Fracture Regular CyLinders Mad~ B'.': P. C. M. AST.I.I C-31 .C-39. C- ;43 :L'nles~ Nord Other, vise ~ - - Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. LarD.' Davis - City of Coppell g~ ~onsultants, Inc. Reviewed by:~'"~-- / ~..· ,.._~--- All I~tmvs and .reports an: for tl~ exclu~ix~ u~ of the client to whrnrs C,'~y am add~sed and shall t-~ be mpradu~aed wi'.ho~ ~ ~ approval of GEE Co~euitants. Inc. Th~ ~ of our r. arc~ must receive o~' pdo~', written av-'pro~,'al. Om' k:ttem and t%'po, r'a mfg. ]y only ~;o ~ sample ~ted and/or in~pec..~d and am