Loading...
SS9901-SP050126 glenn s. mellen Reinforcing Steel Detailing&Estimating \ 1401 Robin Lane - Southlake,Texas 76092 ■ Tele/Fax (817)488-7658 December 30, 2004 Comet Steel, Inc. Attention: GARY PICKERING Re: DeForest & Sandy Lake WW Lift Stations Canfer Construction Job Number 455200 PLACING DIRECTIONS —MISCELLANEOUS REINFORCING STEEL I Sitework—Paving(Approx. 1765 sf) Re: Drawings 10 & 12 of 66 61 #3 x 40-0 @18"o/c EW Laps 1'0" 200 pcs 2-1/4"Plastic Paving Chairs @36"o/c 140#5 x 2-0 @12" in Paving Joints to Existing Sitework—Pipe Bollards (1 Set) Re: Drawing 13 of 66 8 #3 x 5-6 @24" (4 EW) Sitework- Transformer Pad Re: Drawing 37 of 66 52 #4 x 9-6 @10"(13 EW T&B) 4#4-MK 471 Add @ Pad Edge(1 T&B ES) [Type 4/A=1'0"/B=1 '10"/C=2'0"/H= 1'5'7 9#4-MK 472 Standees between layers [Type 26/B=1'6"/C=0'11 "/D= 0'8"/E=0'11 "/F=1 '67 16 pcs 3" Concr Dobie Blocks under bottom bars Mod to Existing Structure—Influent Line Wall Penetration Re: Drwg 54 of 66 6 #5 x 9-8 (3 ES Pipe) 25 #5 x 1-3 @12"Vt Dwls (in 5 lines of 5 each) Mod to Existing Structure—Roof Slab Re: Drawing 57 of 66 17 #6 x 11-5 @8"Bot LW 18 #6 x 11-3 @8"Bot SW 1 Sheet 6x6-W4/W4 Welded Wire Fabric ✓ 35 LF 1-1/2" Slab Bolster(under bottom bars) 35 LF 2"Upper Continuous High Chairs (between rebar and WWF layer) PAGE 1 OF 2 CONTINUED FROM PAGE I OF 2 Mod to Existing Structure— Pump Pedestal Re: Drawing 57 of 66 16 #4 x 2-0 @6" Vt Dwls (4 per face) 12 #4 x 1-7 @l2" Vts (3 per face) 12 #4 x l-8 @l2" Horz (3 per face) Mod to Existing Structure—New Baffle Re: Drawing 58 of 66/ Detail 6 25 #6 x 2-3 @l2" Bot Dwls to Existing 50 #6 x 2-9 @6" Top Dwls to Existing 32 #6 x 2-8 @8" Horz Dwls to Existing(16 each end) 25 #5 x 3-9 @l2" SW Bottom 5 #5 x 24-4 @l2" LW Bottom v.6-.R i `�� 11 #6 x 24-4 @6" LW Top f'6` 50 #6-MK 673 @6" SW Top 1 -'/1=0.", - B=> '97 100 #6-MK 674 @6" Veils (50 each face) /Ty p(' ; , 13=6 'I "; C=/ 'ti' 11= - Ii= 0'1-1/2"j 22 #6 x 24-4 @6" Horz (11 EF) 14 #4-MK 475 @48" Standees between layers /1 rpc 26 B=1 '8 C=11'<4 1:'2' ;1)=0'8 E_ O'8-1.2 %F= 1 '( J 50 LF 1-1/2" Slab Bolster under bottom bars Engineers Pia 2r ' p;,;;(-, No exception Yap a;EE Rejected coPPcept Of t information `;i.ovin is oij C ? .. speoi icati ns Contr 'r4hrrr1 sh'a!' be cor 1o... ,iii - . ., fabrication process 2nri coordination of his,' {w1;rs Of Ci„t_i r_a the s t a or; Glenn,$. Mellen _ OAT E.:/--26 �-- • .PAGE 2 OF 2 1/7 @S_ oy-Y`1 -0.27 4 •