Cambridge Phase 1-LR 941107 (4)I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda lane · Suite 10g * Dallas, Texas 75229 · 1'214! 620-0)791 · [ax !214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 7, 1994 Date Concrete Pla~¢d: October 10, 1994 Standard 6'x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrcte ReportNo.: 26
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete
Location of Placement: Main Road, In-Bound Lane
MATER IAL S so~-~., sso ,~,~ w~.
~.:~:.~ ,~.'c~Y~: INSPECTION DATA
Mix Number: Time Sample Batched: 1:30 pm
Cement: Time Sampled: 1:45 pm
Fly Ash: Sample Location: 410' north of DeForest on in-bound lane
Truck,Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aggregate: Concrete Range: ° F
Admixtures: Slump Range (inches): 5 :.%."
Weather Conditions: Clear
1 Time Started: 7:30 am
2 Time Completed: 4:50 pm
Added Water: Sample Air Content (G): No test
Total Cubiz Yards Placed: 90.0 CY
Required Strength (Lbs..'sq.in.): 3.000
ECM 95 5½ 7 10/17/94 89,640 3,170
ECM 96 5½ 7 10/17/94 70,840 2,510 Spall Edge Break
ECM 97 5½ 28 11/07/94 114,260 4,040
ECM 98 5½ 28 11/07/94 113,860 4,030
A&~I'M C-31.C-39.C-143 ~l/niess .~ou~d Ot~,'~-i,~, Cylinders Made By: V. S.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry Davis - City of Coppell
GEE ~onsultants, Inc. Reviewed by:~/~~
ALI ktter~ ar, d ~pon~ a.'~ for ti~ ~:x¢lu~iv* -- of th~ ciiera to *..horn thL,.- are add~*~l and shall no~ be re~.,'oda~*.~ ~ithout :i~ full approx-al of GEE C~n~t~ta~-.~. Inc. Th*
om' I~qor w~ittm'l aI~proval. Our l*t'~rs amt ~.lm:n~ alii5' o~.iy :o t.'-~ san~k ~st~d and.o~ imllw~l~d and a~ not r~.~ssa~l)- i~i~,:i,~ of th: %-.~an~iti~ of ag,,g,,g,,g,,g,,g,,g~amnt:.)' i,5~ntica; er _~:.milar