Loading...
Cambridge Phase 1-LR 941107 (5)I G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 * (214; 620-9791 · Fax (2 '14~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Reporl Dale: November 7, 1994 Date Concrete Placed: October 10, 1994 Standard 6"xl2' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concret~Repo~No.: 25 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete Location of Placement: Cul-de-sac, North, West One s .... · ~ .,,~ w,_.. I NS P E CT I ON DATA MAT ER I AL S D~ip~io. ~L~.-C~Va~ Mix Number: Time Sample Batched: 10:20 pm Cement: Time Sampled: 10:30 pm Sample Location: 50' east of main road on NW cul-de-sac Fly Ash: TrueL'Tieket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 60°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inchesk 4'..'-~" Weather Condhions: Clear I Ti,ne Started: 7:30 am 2 Time Completed: 4:50 pm Added Water: Sample Air Content t'Tb): No test Total Cubic Yards Placed: 137.0 CY Required Strength (Lbs.-'sq.in.): 3 003 Slw, c.h,'nen Meastuec! Age D-a:e T~tai Lcad. C.'nnpre:~sive St.~,':g,.h Rem,irk, Nu..-nbel' Slump !in.I :Da.ssl Teste~cl ,.Lbs.; LEs. Sq.k-~.~ ECM 91 4½ 7 10/17/94 98,640 3,490 ECM 92 4½ 7 10/17/94 77,600 2,750 Edge Spall ECM 93 4½ 28 11/07/94 133,900 4,740 ECM 94 4½ 28 11/07/94 129,620 4,590 T~t Me'.hc6.s Utiliz~i Frac~.u. re Regular ASTM C-31,C-39.C-143 't.'.'fless .~ot~d O'.her~':.,e; Cylinders .%,lade B}: V. S. Remarks and;or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates. Inc. Larry Davis - City of Coppell