Cambridge Phase 1-LR 941107 (5)I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 * (214; 620-9791 · Fax (2 '14~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Reporl Dale: November 7, 1994 Date Concrete Placed: October 10, 1994 Standard 6"xl2'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concret~Repo~No.: 25
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete
Location of Placement: Cul-de-sac, North, West One
s .... · ~ .,,~ w,_.. I NS P E CT I ON DATA
MAT ER I AL S D~ip~io. ~L~.-C~Va~
Mix Number: Time Sample Batched: 10:20 pm
Cement: Time Sampled: 10:30 pm
Sample Location: 50' east of main road on NW cul-de-sac
Fly Ash: TrueL'Tieket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 60°F
Fine Aggregate: Concrete Range: °F
Admixtures: Slump Range (inchesk 4'..'-~"
Weather Condhions: Clear
I Ti,ne Started: 7:30 am
2 Time Completed: 4:50 pm
Added Water: Sample Air Content t'Tb): No test
Total Cubic Yards Placed: 137.0 CY
Required Strength (Lbs.-'sq.in.): 3 003
Slw, c.h,'nen Meastuec! Age D-a:e T~tai Lcad. C.'nnpre:~sive St.~,':g,.h Rem,irk,
Nu..-nbel' Slump !in.I :Da.ssl Teste~cl ,.Lbs.; LEs. Sq.k-~.~
ECM 91 4½ 7 10/17/94 98,640 3,490
ECM 92 4½ 7 10/17/94 77,600 2,750 Edge Spall
ECM 93 4½ 28 11/07/94 133,900 4,740
ECM 94 4½ 28 11/07/94 129,620 4,590
T~t Me'.hc6.s Utiliz~i Frac~.u. re Regular
ASTM C-31,C-39.C-143 't.'.'fless .~ot~d O'.her~':.,e; Cylinders .%,lade B}: V. S.
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates. Inc.
Larry Davis - City of Coppell