Cambridge Phase 1-LR 941104G EOTECHNICAL
E GEE Consultants inc.
!
2540 Glenda lane · Suite 10g · Dalla% ..... lexas 75229 · ~14~ 620-9791 · [ax ,~',-.~" 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 4, 1994 Date Concrete Placed: October 27, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 34
Contractor: Grif fith Construction
Concrete Supplier and Plant~ Lattimore Plant #7
Location of Placement: Storm Drain Inlet Tops
MATERIALS s .... ' ss~.,~.w~. INSPECTION DATA
Description ,L~s
Mix Number: 38 Time Sample Berthed: 2:27 pm
Cement: 5.0 s.k. Time Sampled: 3:15 pm
Fly Ash: Sample Location: Kings Can.yon Court, E. End. S. Side
Truck-'I'icket No: 464/7005140
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 69:F
Flue Aggregate: Con:fete Range: 66: F
Admixtures: Slump Range (inches): 2V=
Weather Conditions: Partly Cloudy
I W:'R Time Started: 2:30 pm
2 Air Time Completed: 4:20 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 9 CY
Required Strength (Lbs.-'sq.in.):
SI:~::?~n ~.t¢~.su~d Age D~g To:al Load CornpmssN'= St.'=ngth
R¢.-'.~rk~
ECM 124 2½ 7 11/03/94 124,460 4,400
ECM 125 2½ 28 11/24/94
ECM 126 2½ 28 11/24/94
Tcs', Mc:ho~s L'tH;.z~d Fracv. uc Rcguiar
ASWM C-31,C-39.C-:43 (Ur/ess Newel O:i~ro.i~, Cylinders Made By: R. G.
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry Davis - City of Coppell /J /a
A'.'I lt.,tots and n:por~ am for thc exclusive usc of tbe ¢!iem to whom thc)' am a&4.tessod and shall n~ be reproduc=d ~.i~.hout ,.he fu~l appven-al of GEE Cc. mult,m~. Lnc. Thc use of cur ye. mc m~.st recci'*c
cut Dior ,.,--ritUzn a _pproval. Our iet~:m amd repons apply only to ~ samp~ trusted and:or ¥,s.o~.'md and a~ .,~ ma~.ssa.,'i, ly 'l~dieative of '.h= quan:itk:s of ,tr~-~n~nu.v iden:i¢-al or similar products.